ATTENTION_REQUIRED
Unfilled template placeholder 'TBD' detected on Page 6
HYG_UNFILLED_TEMPLATE_PLACEHOLDER | F-HYG-TMPL-doc_01-6-01
Document 'CD1.01_-_Planning_Application_Form.pdf' (Page 6) contains the unfilled template placeholder 'TBD'. This indicates boilerplate text was copied into the submission without final editing.
CD1.01_-_Planning_Application_Form.pdf (p. 6):
“and name for each material) Type: Other Other (please specify): TBD through reserved matters Existing materials and finishes: Proposed mate”
Remediation: Replace the template placeholder 'TBD' with actual scheme data before statutory submission.
ATTENTION_REQUIRED
Internal drive file path printed in document text on Page 26
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_07-26-01
Text on Page 26 discloses internal directory structure: 'L:\13300\13346\ECO\Eco'.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 26):
“concerned at a favourable conservation status in their natural range. 1 L:\13300\13346\ECO\Eco App\Report\Appendix A - Relevant Policy and Legislation.docx”
Remediation: Remove internal path reference from page header or report body.
ATTENTION_REQUIRED
Internal drive file path printed in document text on Page 78
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_07-78-02
Text on Page 78 discloses internal directory structure: 'L:\13300\13346\ECO\ES\Chapter\13346'.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 78):
“LEB / 19.09.25 APD / 09.10.25 Rev A Final REM / 29.10.25 N/A Minor "L:\13300\13346\ECO\ES\Chapter\13346 Shortlands Farm BBS Report 2025.docx" 0”
Remediation: Remove internal path reference from page header or report body.
ATTENTION_REQUIRED
Internal drive file path printed in document text on Page 92
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_07-92-03
Text on Page 92 discloses internal directory structure: 'L:\13300\13346\ECO\Species'.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 92):
“Breeding Bird Evidence. European Ornithological Atlas Committee. I-1 p.1 L:\13300\13346\ECO\Species Groups\Birds\Report\BBS\13346 BBS Results & Categories.odt”
Remediation: Remove internal path reference from page header or report body.
ATTENTION_REQUIRED
Internal drive file path printed in document text on Page 144
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_07-144-04
Text on Page 144 discloses internal directory structure: 'L:\13300\13346\ECO\RCA\13346'.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 144):
“tree feature richness 0 C3 Bank face natural bank profile extent 3 A-1 L:\13300\13346\ECO\RCA\13346 - RCA Baseline.docx”
Remediation: Remove internal path reference from page header or report body.
ATTENTION_REQUIRED
Internal drive file path printed in document text on Page 155
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_07-155-05
Text on Page 155 discloses internal directory structure: 'L:\11900\11915\ECO\HRA\Report\11915'.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 155):
“x A: The Habitats Regulations Assessment Process and Relevant Case Law stan L:\11900\11915\ECO\HRA\Report\11915 Perry Court Farm sHRA Draft REM.docx”
Remediation: Remove internal path reference from page header or report body.
ATTENTION_REQUIRED
Internal CDE / drive path printed in margin of 'CD1.12_-_Drainage_Strategy.pdf' (Page 59)
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_12-59-01
Page 59 border contains the internal network/BIM path: 'G:\Shared'.
CD1.12_-_Drainage_Strategy.pdf (p. 59):
“ã Aegaea - File Name: G:\Shared drives\AEG7000-7999\AEG7630_GU12_Ash_07\CAD\Work In Progress\AEG7630-CIV001-A03 - Drainage Strategy Plan.dwg H2”
Remediation: Turn off CAD/Revit plot stamp path display or sanitize before client submission.
SHOWSTOPPER
Unfilled template placeholder 'to be completed by others' detected on Page 5
HYG_UNFILLED_TEMPLATE_PLACEHOLDER | F-HYG-TMPL-doc_13-5-01
Document 'CD1.13_-_Utilities_Statement.pdf' (Page 5) contains the unfilled template placeholder 'to be completed by others'. This indicates boilerplate text was copied into the submission without final editing.
CD1.13_-_Utilities_Statement.pdf (p. 5):
“own capital program allocation. The proposed preliminary drainage strategy is to be completed by others however; it is anticipated that due to the topography of the site it is assumed”
Remediation: Replace the template placeholder 'to be completed by others' with actual scheme data before statutory submission.
ATTENTION_REQUIRED
Internal drive file path printed in document text on Page 2
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_13-2-01
Text on Page 2 discloses internal directory structure: 'U:\Utilities\Gleeson\GLE.U.78'.
CD1.13_-_Utilities_Statement.pdf (p. 2):
“illreed House, Prepared by 54 Queen Street Horsham West Sussex RH13 5AD U:\Utilities\Gleeson\GLE.U.78 - Shortlands Farm, Document File path Ash\Admin\Report\Planning Statement.do”
Remediation: Remove internal path reference from page header or report body.
SHOWSTOPPER
Occurs on 2 pages
Incomplete GG119 Road Safety Audit Decision Log (RSA Problem(s): 1.1, 1.2, 1.3, 1.4, 3.1, 3.2, 3.3) in 'CD1.14_-_Transport_Assessment.pdf'
HYG_INCOMPLETE_AUDIT_LOG_OR_PROFORMA | F-HYG-RSA-doc_14-01
Pages 80, 81 of 'CD1.14_-_Transport_Assessment.pdf' contain an incomplete GG119 Road Safety Audit Decision Log with unedited Overseeing Organisation / Agreed Action template cells ('Insert the Overseeing Organisation's response').
CD1.14_-_Transport_Assessment.pdf (p. 80):
“organisation RSA problem recommendation response response action 3.1 It is recommended The provision of Insert the Insert the Proposed that the give-way tactile paving would Overseeing design site markings are provide a more Organis”
CD1.14_-_Transport_Assessment.pdf (p. 81):
“response report form of pedestrian facilities at these junctions. 3.2 It is recommended If the overseeing Insert the Insert the Proposed that the transition authority advise that a Overseeing design site ramps are Copenhagen crossing”
Remediation: Complete all Overseeing Organisation responses and Agreed RSA Actions with sign-off before determination.
ATTENTION_REQUIRED
Internal CDE / drive path printed in margin of 'CD1.14_-_Transport_Assessment.pdf' (Page 53)
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_14-53-01
Page 53 border contains the internal network/BIM path: 'h:\_planning'.
CD1.14_-_Transport_Assessment.pdf (p. 53):
“h:\_planning woking\current jobs\mjgwykelane\drawings\master 2025-05-19.dwg”
Remediation: Turn off CAD/Revit plot stamp path display or sanitize before client submission.
ATTENTION_REQUIRED
Internal drive file path printed in document text on Page 111
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_14-111-02
Text on Page 111 discloses internal directory structure: 'H:\_Planning'.
CD1.14_-_Transport_Assessment.pdf (p. 111):
“s of the solution Filename: 2025-06-18 Wyke Lane Junctions Model.j10 Path: H:\_Planning Woking\Current Jobs\MJGWykeLane\Analysis\Picady Report generation date: 18/06/2”
Remediation: Remove internal path reference from page header or report body.
ATTENTION_REQUIRED
Stale report template title in PDF /Title metadata of 'CD1.15_Travel_Plan_-_Final.pdf'
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_15-META-02
The PDF /Title metadata retains a legacy template name: 'MB Report Template 2006-12-04'.
CD1.15_Travel_Plan_-_Final.pdf (p. 1):
“PDF /Title: MB Report Template 2006-12-04”
Remediation: Update document properties in Word / InDesign to reflect the actual project title.
ATTENTION_REQUIRED
Internal CDE / drive path printed in margin of 'CD1.35_-_Design_and_Access_Statement.pdf' (Page 38)
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_24-38-01
Page 38 border contains the internal network/BIM path: 'h:\_planning'.
CD1.35_-_Design_and_Access_Statement.pdf (p. 38):
“h:\_planning woking\current jobs\mjgwykelane\drawings\master 2025-05-19.dwg”
Remediation: Turn off CAD/Revit plot stamp path display or sanitize before client submission.
ATTENTION_REQUIRED
Internal CDE / drive path printed in margin of 'CD2.05_-_Shortland_Farm_-_Amended_Drainage_Strategy_(20_Feb_2026_supplementary).pdf' (Page 59)
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_26-59-01
Page 59 border contains the internal network/BIM path: 'G:\Shared'.
CD2.05_-_Shortland_Farm_-_Amended_Drainage_Strategy_(20_Feb_2026_supplementary).pdf (p. 59):
“ã Aegaea - File Name: G:\Shared drives\AEG7000-7999\AEG7630_GU12_Ash_07\CAD\Work In Progress\AEG7630-CIV001-A03 - Drainage Strategy Plan.dwg H2”
Remediation: Turn off CAD/Revit plot stamp path display or sanitize before client submission.
SHOWSTOPPER
Superseded Site Location Plan (10.18 Ha / Rev A) Embedded in Design & Access Statement
REG_DRAWING_REVISION_MISMATCH | F-REG-SUP-UK2-S101
Standalone Site Location Plan CD1.23 was updated to Rev B (10.19 Ha, 25.17 acres) on 28/10/25 following boundary adjustments. However, Design & Access Statement CD1.35 (Page 6) embeds the superseded Rev A graphic showing '10.18 Ha / 25.15 acres'.
CD1.23_-_Site_Location_Plan_(Ref._25019-S101B)(A1).pdf (p. 1):
“Total Site Area 10.19 Ha 25.17 acres | 25019-S101 Rev B 28/10/25 Site boundary adjusted”
CD1.35_-_Design_and_Access_Statement.pdf (p. 6):
“Total Site Area 10.18 Ha 25.15 acres [embedded superseded graphic]”
Remediation: Re-export DAS Page 6 with the final Rev B Site Location Plan showing 10.19 Ha.
HYGIENE_ADVISORY
AI Verified: HYGIENE_DRIFT
Cross-Document Site Area Contradiction (10.18 ha vs 11.33 ha)
SEM_SITE_AREA_CONTRADICTION | F-SEM-AREA-01
The definitive Site Location Plan (Ref. 25019-S101B) confirms a Total Site Area of 10.19 ha (25.17 acres), whereas the Design and Access Statement, LVIA, Ecological Impact Assessment, and Energy Statement quote 10.18 ha (25.15 acres). The Planning Statement cites 'circa 10.24ha', the Geo-Environmental report rounds broadly to 'approximately 11 hectares', and the Travel Plan references a '28-acre parcel'. This is a classic drafting hygiene drift involving minor CAD boundary rounding (0.01 ha difference) and soft prose approximations across technical consultants rather than a substantive red-line boundary dispute.
CD1.03_-_Planning_Statement_(30.10.2025).pdf (p. 11):
“iption Site location and surrounding area 2.1 The Site amounts to circa 10.24ha and lies to the east of the village of Ash. Specifically, the Site lies”
CD1.04_-_Landscape_and_Visual_Imapct_Assessment.pdf (p. 5):
“assessment methodology Figure 1.1: Study Area extends to approximately 10.18 ha. Consequence of Development 1.29. The assessment is written on the basi”
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 5):
“Site Location and Context 2.4 The application Site is approximately 10.18 ha and is located West of Guildford in Surrey (Central OS Grid Ref: SU 9064”
CD1.15_Travel_Plan_-_Final.pdf (p. 14):
“The development proposals seek the development of up to 200 dwellings on a 28-acre parcel of land located off the A323 Guildford Road in Ash, Surrey. This”
Remediation: Align the gross site area text across all non-statutory narrative documents (Planning Statement, Travel Plan, Geo-Environmental Report, and DAS) to strictly match the definitive 10.19 ha stated on Site Location Plan Ref. 25019-S101B and the 1App form prior to formal validation or committee reporting.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Cross-Document BNG Policy Target Contradiction (10%, 20%)
SEM_BNG_METRIC_OR_TARGET_CONTRADICTION | F-SEM-BNG-TGT-03
Guildford Borough Council Local Plan: Development Management Policies (LPDMP) Policy P7 sets an adopted requirement of at least 20% Biodiversity Net Gain (BNG). The Planning Statement (CD1.03, p. 40) and the Ecological Impact Assessment conclusions (CD1.07, p. 24) correctly align with this policy requirement by committing to at least 20% net gain. However, the draft condition text in the EcIA (CD1.07, p. 19) cites delivering a '10% net gain in biodiversity' (the national baseline under the Environment Act 2021). This internal inconsistency risks LPA ecologist objection or defective pre-commencement condition drafting against Policy P7.
CD1.03_-_Planning_Statement_(30.10.2025).pdf (p. 40):
“ory Metric prepared by FPCR. This shows that the development of the Site can achieve 20% BNG required by LPDMP Policy P7 on site for hedgerows and watercourses and will likely r”
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 19):
“ondition that will be applied to the scheme. This will detail how the proposals will deliver a 10% net gain in biodiversity through onsite measures and, where required, offsite compensation. • Habitat Managem”
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 24):
“cant Positive effects likely for reptiles and bats. 8.5 The proposals will lead to a Biodiversity net gain of at least 20% for watercourses and hedgerows onsite and, with offsite units, will also achieve at”
Remediation: Amend the draft condition wording on page 19 of CD1.07 (EcIA and SANG Statement) to reflect Guildford LPDMP Policy P7's 20% net gain target rather than national 10% statutory boilerplate, ensuring full consistency with Section 8.5 and the Planning Statement.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
BNG Habitat Unit Net Loss / Headline Metric Contradiction (-8.89%, -8.56%)
SEM_BNG_METRIC_OR_TARGET_CONTRADICTION | F-SEM-BNG-HAB-04
Within the Ecological Impact Assessment and SANG Statement (CD1.07), two conflicting on-site BNG headline metrics are reported: an 8.56% net loss (-3.91 units / p. 114) versus an 8.89% net loss (p. 128), accompanied by conflicting watercourse unit gains (36.16% vs 37.41%). Crucially, both reported values represent a net loss in habitat units on-site. Under the Environment Act 2021 statutory Biodiversity Net Gain requirements in England, a scheme must demonstrate a minimum 10% net gain; presenting an unmitigated on-site net loss without an agreed, secured off-site habitat bank allocation or S106 legal mechanism is an active statutory determination blocker.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 114):
“rovision of a new species-rich native hedgerow. Conclusion The Site will result in a 8.56% loss in habitat units, a 146.14% gain in hedgerow units and a 36.16% gain in watercourse units. The propos”
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 128):
“t Units -3.91 Hedgerow Units 5.66 Watercourse Units 0.37 Total Net Percentage Change Habitat Units -8.89% Hedgerow Units 146.14% Watercourse Units 37.41% 7.2 The Statutory Metric has demonst”
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 128):
“abitat Trading Rules 7.3 The proposals are currently resulting in a net loss and the trading rules of the metric are not being satisfied in the proposals due to a loss of low distinctiveness grassland units, tall forbs an”
Remediation: Reconcile the statutory biodiversity metric spreadsheet to eliminate internal calculation drift between the narrative summary and tabular results. If the scheme generates an on-site habitat deficit (-8.56% / -8.89%), formally document and submit a secured off-site BNG mitigation strategy and draft Section 106 agreement to satisfy the mandatory 10% net gain requirement prior to determination.
SHOWSTOPPER
Incomplete Seasonal Bat Activity Surveys Disclosed Prior to Determination
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-TECH-ECOL-01
The applicant's ecologist explicitly admits that automated static bat detector surveys remain to be completed for April, May, and June. Under ODPM Circular 06/2005 and standard BCT Good Practice Guidelines, baseline seasonal bat activity surveys must be completed prior to determination to assess the presence and significance of protected bat species on site, regardless of the application stage.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 63):
“arm, Ash – Bat Survey Report 6.0 DISCUSSION & RECOMMEDNATIONS 6.1 Although automated static surveys still need to be completed for April, May and June, this does not rule out the below assessment from being justified. The data we that has been gather”
Remediation: Complete the missing April, May, and June seasonal bat activity surveys and submit an updated Ecological Impact Assessment with full bat assemblage data and appropriate mitigation before the application is determined.
SHOWSTOPPER
Net Habitat Loss and Failure to Meet Statutory BNG Requirements
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-TECH-ECOL-02
The BNG assessment self-discloses an on-site net loss of 8.56% in habitat units, failing both the statutory mandatory 10% BNG trading rules and Guildford Borough Council's 20% net gain policy requirement without a secured off-site allocation mechanism. Planning permission cannot lawfully be granted without a legally binding mechanism securing sufficient off-site units to achieve a net gain.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 114):
“d through the provision of a new species-rich native hedgerow. Conclusion The Site will result in a 8.56% loss in habitat units, a 146.14% gain in hedgerow units and a 36.16% gain in watercourse units. The proposals fall short”
Remediation: Submit a revised Biodiversity Net Gain metric demonstrating no net loss in area habitats, along with a formal draft Section 106 agreement or registered off-site BNG unit allocation securing the required net gain balance.
ATTENTION_REQUIRED
Failed BRE 365 Infiltration Testing and Low Infiltration Rates
TECH_DRAINAGE_SUDS_GAP | F-TECH-DRAI-03
Intrusive BRE 365 testing across the site revealed that three out of six trial pits completely failed to produce an infiltration rate, while the remaining pits demonstrated low rates. This indicates that site-wide infiltration is unfeasible and risks compromising attenuation sizing if infiltration features are relied upon.
CD1.10_-_Flood_Risk_Assessment_(30.10.2025).pdf (p. 30):
“produced infiltration rates between circa 1.07 x 10-5 m/s and 2.95 x 10-5 m/s, the remaining three trial pits failed to produce a sufficient infiltration rate. The infiltration rate encountered is considered low and”
Remediation: Update the surface water drainage strategy to reflect that ground infiltration is largely unfeasible across the site, ensuring full attenuation capacity is provided on-site based on an alternative viable outfall in accordance with the drainage hierarchy.
ATTENTION_REQUIRED
Risk of Exceeding SuDS 24-Hour Half-Drain-Down Criterion
TECH_DRAINAGE_SUDS_GAP | F-TECH-DRAI-04
The report notes that low infiltration rates across the test locations may result in difficulty meeting the mandatory 24-hour half-drain time criterion. Failure to achieve the half-drain down criterion reduces storage capacity for consecutive storm events, increasing flood risk.
CD1.10_-_Flood_Risk_Assessment_(30.10.2025).pdf (p. 30):
“sufficient infiltration rate. The infiltration rate encountered is considered low and may result in difficulty achieving half drain time design criterion required in design of infiltration 8 The British Geological Survey (BGS) Geology M”
Remediation: Provide detailed drainage calculations demonstrating either that proposed storage features achieve a 24-hour half-drain down time, or incorporate a controlled positive gravity discharge to an approved watercourse/sewer with adequate attenuation storage.
HYGIENE_ADVISORY
SuDS Standard 1 Water-Butt Reliance at Top of Hierarchy
TECH_DRAINAGE_SUDS_GAP | F-TECH-DRAI-05
The drainage strategy cites individual private rainwater butts as fulfilling the top tier (rainwater harvesting) of the drainage hierarchy. Rainwater butts in private residential gardens are non-creditable for formal peak-storm attenuation volume under CIRIA C753 and national SuDS standards due to unregulated homeowner emptying.
CD1.12_-_Drainage_Strategy.pdf (p. 9):
“he following surface water disposal options should be considered, listed in order of preference: i. Rainwater harvesting : This is considered to be top of the hierarchy, above infiltration . Any overflows such systems would continue to follow the drainage hierarchy. There are opportunities for rainwater butts to be provided to residential rainwater down pipes within private land/ gardens. ii. Disposal via o”
Remediation: Clarify within the drainage strategy that individual domestic water butts are provided solely as amenity water re-use measures and are excluded from hydraulic capacity and attenuation storage calculations.
ATTENTION_REQUIRED
Deferred Receiving Watercourse Condition and Surcharge Modelling
TECH_DRAINAGE_SUDS_GAP | F-TECH-DRAI-06
The strategy acknowledges that the proposed outfall to the ordinary watercourse may become surcharged during flood events, but defers hydraulic surcharge modelling to detailed design. Where the receiving waterbody is prone to surcharge, backwater effects must be assessed pre-determination to prevent unexpected site-wide attenuation under-sizing.
CD1.12_-_Drainage_Strategy.pdf (p. 11):
“nary watercourse along the southern boundary. D ischarging into the onsite watercourse will require ordinary watercourse consent to be obtained during detailed design stage. 2.9. The outfall may become surcharged during some flood events and will therefore be modell”
Remediation: Undertake hydraulic surcharge modelling of the receiving watercourse outfall for the 1-in-100-year plus climate change event to confirm free discharge conditions or properly size flap-valved attenuation storage.
HYGIENE_ADVISORY
Unconfirmed Foul Drainage Strategy and Unmodelled Pumping Station
TECH_DRAINAGE_SUDS_GAP | F-TECH-DRAI-07
The utilities statement reveals that the foul drainage strategy is incomplete and assumes that a wastewater pumping station will be required at the low point of the site, leaving the exact layout, capacity, and discharge point unconfirmed. The location, buffer zones, and operational feasibility of a foul pumping station impact site developability and statutory water company connections.
CD1.13_-_Utilities_Statement.pdf (p. 5):
“tructure charges levied on new connections, and/or its own capital program allocation. The proposed preliminary drainage strategy is to be completed by others however; it is anticipated that due to the topography of the site it is assumed that the site will”
Remediation: Submit a preliminary foul drainage general arrangement layout identifying the required pumping station location, 15m amenity buffer, and Thames Water / statutory sewerage undertaker point of connection enquiry response confirming downstream network capacity.
HYGIENE_ADVISORY
Multiple Source-Control SuDS Components Deferred to Detailed Design
TECH_DRAINAGE_SUDS_GAP | F-TECH-DRAI-08
The drainage strategy addendum rules out formal rainwater harvesting and defers the feasibility assessment of source-control SuDS components (such as rain gardens) entirely to detailed design. While the application is outline with access only, the conceptual layout must establish adequate spatial allocation for source control components.
CD2.04_-_Shortland_Farm_-_Drainage_Strategy_Addendum_(20_Feb_2026_-_supplementary).pdf (p. 6):
“on of rainwater butts will be promoted to provide some rainwater re -use for garden maintenance and rain gardens will be considered at detailed design stage . Priority 2 2.8. The second priority is to consider infiltration of surface water runoff into the”
Remediation: Provide indicative locations and cross-sections for rain gardens and permeable paving within the preliminary layout drawings to demonstrate adequate above-ground spatial provision for source-control treatment.
ATTENTION_REQUIRED
Incomplete Ground Gas and Groundwater Monitoring Programme
TECH_EH_GEOTECH_GAP | F-TECH-CONT-09
The geo-environmental interpretative report discloses that a final return monitoring visit of boreholes remains outstanding and will only be incorporated into a future revision. Gas and groundwater regime classifications under CIRIA C665 and BS 8485 require the complete scheduled dataset to definitively establish baseline ground gas risk and Characteristic Situation.
CD1.17_-_Phase_1_and_Phase_2_Geo-Environmental_and_Geotechnical_Interpretative_Report.pdf (p. 33):
“works and subsequent monitoring of boreholes between 16th June and 10th July 2025. A further single return monitoring visit is currently outstanding and will be included in a future revision of this report. 7.2 Objectives The specific objectives of”
Remediation: Complete the outstanding monitoring visit, update the gas risk assessment and flow rate calculations in an addendum or revision, and confirm whether gas protection measures are required.
ATTENTION_REQUIRED
Desktop Noise Note Omitting Baseline BS 8233 Acoustic Survey
TECH_EH_GEOTECH_GAP | F-TECH-NOIS-10
The applicant's acoustic consultant declines to undertake an on-site baseline noise survey, relying on a desktop review of satellite imagery to argue that ambient transport noise is low. For a major residential outline planning application, an empirical baseline sound survey in accordance with BS 8233:2014 and ProPG is necessary to establish prevailing daytime/night-time sound levels and determine façade sound insulation requirements.
CD1.18_-_Noise_Assessment.pdf (p. 2):
“etails for the surrounding roads and nursery, it is our view that a detailed noise assessment (e.g. site noise survey and assessment) should not be necessary in this case to support the outline planning application. This is for the following reasons: - The”
Remediation: Commission an empirical baseline noise survey in accordance with BS 8233:2014 and ProPG to measure ambient and maximum road traffic noise levels across the site boundary, establishing definitive noise contours and sound insulation design targets.
ATTENTION_REQUIRED
Disclosed Non-Compliance with Highway Authority Pre-Application Directive
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-TECH-PREA-11
The Transport Assessment admits that the Copenhagen crossing facility at the Guildford Road / Harpers Road junction specifically requested by Surrey County Council during pre-application cannot be delivered due to highway boundary and loading bay constraints. Departing from an explicit Local Highway Authority pre-application directive requires formal technical agreement or an approved compensatory pedestrian/cyclist priority intervention.
CD1.14_-_Transport_Assessment.pdf (p. 25):
“openhagen crossing facility at the Guildford Road / Harpers Road junction has been investigated, as requested by SCC in their pre-application response. The provision of a Copenhagen crossing would require the footway outside the pub to be raised to footway level as it is currently at ground level, and the footway is also used as a loading bay for the pub. However, this would require transition ramps that would diminish the footway width / loading bay width given the limited public highway land available and so it is considered that a Copenhagen crossing isn’t achievable at this location; The applicant is willing to explore potential enhancements to cycling facilitie”
Remediation: Engage with Surrey County Council Highways to agree an acceptable alternative pedestrian and cycle priority junction design, or submit an amended general arrangement drawing reconciling footway levels, loading bay access, and highway boundary limits.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Missing Hydraulic Capacity Assessment and Consent Proof for Receiving Ordinary Watercourse
TECH_DRAINAGE_SUDS_GAP | F-FC-002
In addressing the LLFA objection regarding receiving watercourse capacity, the Addendum relies solely on a 2021 AECOM figure showing downstream network connectivity and restricting discharge to QBAR (12.70 l/s). No hydraulic capacity assessment, channel invert/water-level survey of the 0.80m deep southern boundary ditch, riparian discharge rights, or Section 23 Land Drainage Act consent assessment is provided to prove the ditch can accept the outfall freely.
CD2.04_-_Shortland_Farm_-_Drainage_Strategy_Addendum_(20_Feb_2026_-_supplementary).pdf (p. 8):
“2.22. One of the comments received from the LLFA was in relation to the receiving watercourse”
Remediation: Submit a topographic invert and hydraulic capacity assessment of the southern boundary ordinary watercourse demonstrating free-draining outfall levels above peak ditch water levels, and confirm riparian discharge rights and Section 23 Land Drainage Act consent requirements.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Unsupported Water Quality Claim Without CIRIA C753 Simple Index Approach Scoring
TECH_DRAINAGE_SUDS_GAP | F-FC-003
Section 2.27-2.28 classifies catchment pollution hazards (including Medium hazard for the main highway/spine road) and asserts that adequate water quality treatment can be achieved, without undertaking the CIRIA C753 Simple Index Approach. Because almost all source/conveyance SuDS components (swales, bioretention, filter strips, tree pits) remain optional and deferred to detailed design, the Addendum does not demonstrate that required pollution mitigation indices will be met prior to discharging to an environmentally sensitive watercourse.
CD2.04_-_Shortland_Farm_-_Drainage_Strategy_Addendum_(20_Feb_2026_-_supplementary).pdf (p. 10):
“2.28. It is therefore considered that adequate water quality treatment can be provided via SuDS”
Remediation: Provide a CIRIA C753 Simple Index Approach calculation matrix (pollution hazard indices versus committed SuDS mitigation indices) for each catchment type, particularly the Medium-hazard spine road, committing to specific minimum treatment stages.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Omission of Exceedance Flow Routing and Interim Phased Drainage Controls
TECH_DRAINAGE_SUDS_GAP | F-FC-004
Despite reviewing the seven NPPF SuDS standards (including management of extreme rainfall and flooding), the Addendum omits any spatial exceedance and overland flow routing plan for events exceeding the 1-in-100yr plus climate change design storm or system blockages. Additionally, Section 4.5 requests flexibility to occupy dwellings before all SuDS features are operational without specifying interim phased drainage safeguards.
CD2.04_-_Shortland_Farm_-_Drainage_Strategy_Addendum_(20_Feb_2026_-_supplementary).pdf (p. 16):
“4.5. It is unlikely the whole development would be built out with all SuDS/drainage features”
Remediation: Submit an Exceedance and Overland Flow Routing Plan showing safe floodwater pathways clear of dwellings and third-party land, and define mandatory phasing trigger points ensuring strategic attenuation and outfall infrastructure are operational prior to first occupation.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Missing LLFA Objection Letter and Referenced Drainage Strategy in Appendix A
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-005
Section 1.1 explicitly refers to Appendix A for Surrey County Council LLFA's objection letter dated 12th December 2025, which this Addendum is intended to resolve. However, Appendix A (Page 17) is a blank placeholder titled 'Appendix A - Drainage Strategy Report (Ref: 7630_GU12_Ash_07 Issue 4)' containing neither the LLFA objection letter nor the referenced Drainage Strategy Report and technical calculations.
CD2.04_-_Shortland_Farm_-_Drainage_Strategy_Addendum_(20_Feb_2026_-_supplementary).pdf (p. 4):
“objection dated 12th December 2025 (Refer to Appendix A) and subsequent meeting dated 4”
Remediation: Append the full Surrey County Council LLFA objection letter dated 12th December 2025 (and 4 February 2026 meeting record) alongside a point-by-point compliance matrix and the referenced Drainage Strategy Issue 4 appendices (BRE 365 logs and IH124/attenuation calculations).
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Wyke Lane Emergency Access Excluded from Transport Assessment
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-006
Access is NOT a reserved matter in this outline application, with full details of both the Guildford Road primary access and the Wyke Lane emergency access submitted for approval. However, the Planning Statement confirms the Wyke Lane emergency access was omitted from the Transport Assessment, despite 2D pluvial modelling showing up to 0.23m flooding at the primary access in a 1-in-100yr+45%CC event.
CD1.03_-_Planning_Statement_(30.10.2025).pdf (p. 45):
“frequently. It has not been assessed by Mayer Brown as part of the Transport Assessment.”
Remediation: Submit a technical addendum to the Transport Assessment covering the Wyke Lane emergency access, including DMRB visibility splays, fire/emergency vehicle swept path analysis, and operational safety/flood resilience review.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Infiltration Feasibility Deferred to Detailed Design Without Empirical Proof
TECH_DRAINAGE_SUDS_GAP | F-FC-007
The Drainage Strategy proposes partial infiltration SuDS features alongside attenuation basins and tanks, yet the Planning Statement defers investigating the feasibility of partial infiltration to the detailed design stage. Without pre-determination BRE 365 infiltration testing, the SuDS hierarchy justification and required attenuation storage volumes remain unverified and explicitly subject to change.
CD1.03_-_Planning_Statement_(30.10.2025).pdf (p. 42):
“managing surface water on the Site (feasibility to implement partial infiltration features will”
Remediation: Submit empirical BRE 365 soakage test results and groundwater monitoring data prior to determination to validate infiltration feasibility and confirm fixed outline attenuation volumes and discharge rates.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Off-Site SANG Not Yet Secured for TBHSPA Mitigation
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-008
The site lies partly within the 400m TBHSPA exclusion zone and wholly within the 400m-5km zone of influence, and provides no on-site SANG. The Planning Statement confirms the applicant is still only progressing options for off-site SANG provision alongside off-site BNG habitat credits, leaving statutory Habitats Regulations Assessment mitigation unresolved at submission.
CD1.03_-_Planning_Statement_(30.10.2025).pdf (p. 40):
“is progressing several options for off-site SANG provision to mitigate against the possible”
Remediation: Confirm and secure a dedicated, Natural England-compliant off-site SANG allocation (with capacity confirmation) and heads of terms for off-site BNG habitat units via S106 prior to determination.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Incomplete Ground Gas Monitoring Near Borehole
TECH_EH_GEOTECH_GAP | F-FC-009
RSK's Phase 1 and Phase 2 Geo-environmental Report recommends additional ground gas monitoring close to one borehole to confirm gas risk, which remains uncompleted at submission. Leaving an identified borehole gas risk assessment incomplete increases uncertainty around foundation gas protection measures.
CD1.03_-_Planning_Statement_(30.10.2025).pdf (p. 49):
“confirm any ground gas risk close to one borehole.”
Remediation: Complete the recommended ground gas monitoring rounds prior to determination (or provide a technical note confirming whether pre-commencement conditioning is acceptable to Environmental Health) and update the conceptual site model.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Pre-Application Advice and PPA Unresolved Prior to Submission
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-010
Pre-application advice was requested from Guildford Borough Council in July 2025 and a request to convert this into a post-submission Planning Performance Agreement was sent on 13 October 2025. No pre-application advice or PPA response was received prior to submitting this major grey belt/green belt proposal.
CD1.03_-_Planning_Statement_(30.10.2025).pdf (p. 13):
“Agreement. A response to this request had not been received at the time of submission.”
Remediation: Formalise engagement with GBC through a Planning Performance Agreement or post-submission statutory consultee workshop to resolve technical queries early.
HYGIENE_ADVISORY
AI Verified: TRUE_CONTRADICTION
Parameter Plan Drawing Reference Mismatches and Blank Appendix 1
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-011
The Planning Statement contains conflicting drawing references for plans submitted for approval: Section 5.141 cites Land Use Parameter Plan ref. 25019 - SK15B and Figure 5.1 cites drawing ref. 25019 - C104, whereas Section 1.10 lists Land Use Parameter Plan as 25019 - C102 and Green Infrastructure Parameter Plan as 25019 - C104 (elsewhere written 25091-C104). Additionally, Appendix 1 (pages 59-60) omits the referenced Economic Benefits Infographic.
CD1.03_-_Planning_Statement_(30.10.2025).pdf (p. 44):
“Source: Land Use Parameter Plan (drawing ref. 25019 - C104)”
Remediation: Issue an erratum clarifying the exact drawing references submitted for approval and append the missing Economic Benefits Infographic at Appendix 1.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
No A323 Guildford Road pedestrian crossing proposed despite 330m distance to nearest controlled crossing
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-012
Paragraph 2.15 identifies that the nearest controlled pedestrian crossing on the A323 Guildford Road is 330m west of the site boundary, yet Section 2.28 only proposes Copenhagen crossings across side-road accesses (site access and Wyke Lane) and dropped kerbs at Harpers Road. No controlled or refuge crossing is proposed across the A323 Guildford Road carriageway itself to serve the adjacent westbound/eastbound bus stops or north-side amenities.
CD1.15_Travel_Plan_-_Final.pdf (p. 8):
“2.15 The nearest controlled pedestrian crossing on Guildford Road is located approximately
330m west of the site boundary as shown in Figure 2.4.”
Remediation: Assess pedestrian desire lines across the A323 Guildford Road between the site access and the Nightingale Road / Wyke Lane bus stops, and provide an appropriate carriageway crossing facility (such as a pedestrian refuge or controlled crossing) coordinated with the Transport Assessment access drawings.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Missing LTN 1/20 cycle infrastructure assessment along A323 Guildford Road
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-013
Paragraph 2.16 notes that Ash has limited dedicated cycling facilities and relies on new residents cycling directly on the A323 Guildford Road (a 30mph/40mph local distributor route) under Local Plan Policy ID9. However, the report provides no LTN 1/20 Cycling Level of Service audit of Guildford Road and proposes no dedicated cycle lanes, shared-use footways, or off-site cycle linkages in Section 2.28.
CD1.15_Travel_Plan_-_Final.pdf (p. 9):
“2.16 Ash has limited dedicated cycling facilities but cyclists are able to make use of the local
road network. The A323 Guildford Road is identified as being part of the Comprehensive
Guildford Borough Cycle Network under Guildford Borough Local Plan Policy ID9”
Remediation: Undertake an LTN 1/20 route audit of the A323 Guildford Road corridor toward Ash station and village centre, and identify physical cycle infrastructure or junction transition improvements where carriageway speeds and flows are unsuitable for mixed-traffic cycling.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
All modal split targets deferred until 50% occupation without Census/TA baseline or remedial triggers
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-014
Paragraphs 5.3 and 5.7 defer setting all quantitative modal split targets until after a baseline travel survey at 50% occupation, without establishing indicative baseline mode shares from Census data or the Transport Assessment. In addition, the Travel Plan lacks enforceable vehicle trip-generation ceilings, interim monitoring triggers before 100 dwellings are occupied, or a funded contingency mechanism if the 5%–10% car-reduction aim is missed.
CD1.15_Travel_Plan_-_Final.pdf (p. 20):
“5.3 A baseline travel survey will be undertaken following 50% occupation of the
development. The results of the survey will be used to set up-to-date modal split targets
for the five-year implementation period of the Travel Plan.”
Remediation: Define indicative starting modal split targets anchored to Census journey-to-work data and Transport Assessment trip generation, establish interim monitoring triggers prior to 50% occupation, and specify a funded remedial action mechanism if targets are not met.
HYGIENE_ADVISORY
AI Verified: TRUE_CONTRADICTION
Unverified highway land availability for bus stop upgrades and undefined PRoW 356 standards
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-015
Section 2.28 conditions proposed bus shelter, RTPI, and accessible kerbing upgrades on "where sufficient public highway land is available", even though Table 2.2 shows three of the four nearest bus stops currently lack shelters and seating. Similarly, committed improvements to Public Footpath 356 across the site lack minimum corridor width, surfacing, or lighting specifications.
CD1.15_Travel_Plan_-_Final.pdf (p. 16):
“This is likely to include improvements to bus shelters, Real Time
Passenger Information (RTPI) displays, accessible kerbing and bus cages where
sufficient public highway land is available;”
Remediation: Confirm public highway boundary extents at the Nightingale Road and Wyke Lane bus stops to verify feasibility of shelters and RTPI, and specify minimum width, surfacing, and lighting parameters for Public Footpath 356 improvements.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Incomplete Seasonal Surveys for Annex II Barbastelle Bats
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-016
The DAS confirms that bat surveys are ongoing and that Annex II barbastelle bats have been recorded on site, requiring further automated static surveys from April to June of the following year to determine site usage. Determining an outline application prior to completing essential seasonal protected species surveys is a statutory pre-determination blocker under the Conservation of Habitats and Species Regulations and NPPF.
CD1.35_-_Design_and_Access_Statement.pdf (p. 21):
“Due to an Annex II species, barbastelle bats being recorded onsite, further”
Remediation: Complete the outstanding April to June automated static bat surveys, update the Ecological Impact Assessment with barbastelle flight-line/foraging data, and demonstrate dark-corridor mitigation prior to determination.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Infiltration Feasibility Deferred to Detailed Design
TECH_DRAINAGE_SUDS_GAP | F-FC-017
Although the surface water strategy relies on partial infiltration features alongside permeable paving, bio-retention, swales, and attenuation basins, the DAS explicitly defers investigating infiltration feasibility to detailed design. Under NPPF/PPG and LLFA requirements, empirical BRE 365 soakage testing is required pre-determination at outline stage to prove the SuDS hierarchy and validate attenuation storage footprints within the Land Use Parameter Plan.
CD1.35_-_Design_and_Access_Statement.pdf (p. 51):
“feasibility to implement partial infiltration features should be investigated”
Remediation: Submit empirical BRE 365 infiltration test results and groundwater level monitoring prior to determination to confirm infiltration rates and verify that the 5.01 ha open space zone can accommodate required SuDS attenuation volumes.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Primary Vehicular Access Subject to Surface Water Flooding
TECH_DRAINAGE_SUDS_GAP | F-FC-018
The DAS acknowledges that the primary vehicular access from Guildford Road—one of the two accesses applied for in detail at outline stage—could be affected by surface water flooding, relying instead on an emergency-only access onto Wyke Lane (which is also mislocated as 'to the west of the site' on p. 24 despite being on the eastern boundary per pp. 38 and 48) while asserting no Sequential Test is required. Leaving the sole everyday vehicular access vulnerable to pluvial flooding without demonstrated safe dry access/egress or Sequential Test justification requires pre-determination resolution.
CD1.35_-_Design_and_Access_Statement.pdf (p. 24):
“Although the primary access has been demonstrated that it could be”
Remediation: Provide detailed flood depth/hazard modelling and engineering mitigation at the Guildford Road primary access junction to demonstrate safe dry access/egress in the 1 in 100 year + 45% CC event, correct the Wyke Lane directional error, and verify PPG 7-027 Sequential Test compliance with the LLFA.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
RPA Encroachment on Retained/TPO Trees Deferred to Conditions
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-019
Page 20 states that where Root Protection Area (RPA) encroachment occurs, it can be managed through planning conditions and detailed protection measures, while page 30 notes the presence of trees protected by a Tree Protection Order (TPO). Deferring unspecified RPA encroachment to conditions risks conflict between fixed parameter zones/accesses and BS 5837 root protection requirements.
CD1.35_-_Design_and_Access_Statement.pdf (p. 20):
“to manage RPA encroachment, it can be managed through”
Remediation: Overlay BS 5837 RPA buffers onto the Land Use Parameter Plan and Guildford Road/Wyke Lane access drawings to demonstrate that no unmitigated RPA encroachment affects retained or TPO trees.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Missing LPA Pre-App Advice Summary and Site Area Discrepancy
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-020
Section 4.1 (Pre-application Consultation) presents slides from a September 2025 councillor briefing claiming 'Just over 11 hectares' and Grey Belt qualification, but omits any Guildford Borough Council planning officer pre-application response matrix despite SCC highway pre-app advice being referenced on p. 38. Furthermore, the 11+ ha figure conflicts with the 10.18 ha application site area (pp. 6, 9, 44) and the 10.24 ha combined Land Use Parameter Plan areas (5.23 ha + 5.01 ha, p. 39).
CD1.35_-_Design_and_Access_Statement.pdf (p. 34):
“• Just over 11 hectares of both greenfield”
Remediation: Reconcile the exact red-line site area across all text, parameter plans (5.23 ha + 5.01 ha vs 10.18 ha vs 11+ ha), and consultation slides, and provide a formal pre-application compliance summary addressing all LPA and statutory consultee directives.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Incomplete Ground Gas Monitoring Without Falling Atmospheric Pressure Despite High CH4/CO2
TECH_EH_GEOTECH_GAP | F-FC-021
The Phase 1 CSM identified plausible ground gas sources from on-site made ground and off-site historical brickfields/quarries within 250m north, yet only two monitoring rounds (1012–1019 mbar) have been completed, excluding falling atmospheric pressure conditions. Despite this incomplete dataset, WS01 recorded 4.5% v/v methane and 32.3% v/v CO2 (CS2) from an unconfirmed source and WS06 recorded 10.2% v/v CO2 (within Zone 2, classified as CS1 despite exceeding the 5% CO2 threshold), meaning worst-case ground gas risk and BS 8485 protection requirements remain unverified.
CD1.17_-_Phase_1_and_Phase_2_Geo-Environmental_and_Geotechnical_Interpretative_Report.pdf (p. 53):
“The likely worst case gas regime has not been used and thus ground gas mitigation measures may be underestimated without further ground gas monitoring during a period of falling pressure.”
Remediation: Complete the outstanding ground gas monitoring round(s) specifically capturing falling atmospheric pressure (<1000 mbar where possible) plus the recommended targeted boreholes/monitoring in the WS01/WS04 area, update the ground gas CSM and Zone 1/Zone 2 CS classifications, and confirm BS 8485 protection measures prior to determination.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Soil GQRA Screened Against 'Without Home-Grown Produce' GAC Despite Proposed Private Gardens
TECH_EH_GEOTECH_GAP | F-FC-022
Although Section 9.3.1 states that soil results are compared against 'residential with home-grown produce' GAC, Sections 9.3.1.1 and 9.3.1.2 actually compare all Made Ground and Natural Soil concentrations against 'residential without home grown produce' GAC. Because the development includes private residential gardens (Section 10.1) and Table 14 identifies consumption of site-grown produce as a plausible pathway across a former nursery/equestrian site, excluding plant uptake underestimates human health risk.
CD1.17_-_Phase_1_and_Phase_2_Geo-Environmental_and_Geotechnical_Interpretative_Report.pdf (p. 45):
“All made ground results have been compared with the residential without home grown produce GAC. A soil organic matter (SOM) of 1% has been selected to provide the most conservative assessment.”
Remediation: Re-run and append the Tier 2 GQRA screening in Appendix M using authoritative 'residential with home-grown produce' GAC (1% SOM) for all made ground and natural soils in private garden zones, and confirm whether any contaminants (such as PAHs or metals) exceed the stricter thresholds.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Unresolved Controlled Waters Leachate Exceedances and Dry Monitoring Wells
TECH_EH_GEOTECH_GAP | F-FC-023
Leachate testing on made ground exceeded controlled waters EQS GAC for copper (7 ug/l vs 1 ug/l), lead (6 ug/l vs 1.2 ug/l) at WS06 near the yard fuel tank, and zinc (22 ug/l vs 10.9 ug/l) at WS13 in the 2.5m deep south-western mound, directly overlying Secondary A aquifers (Bagshot Formation). Only 2 leachate tests and 0 groundwater chemical analyses were undertaken (with 9 of 10 monitoring wells dry across two summer visits despite water seepages at 2.0–4.0m during drilling), leaving seasonal groundwater elevation and leaching risks incompletely assessed.
CD1.17_-_Phase_1_and_Phase_2_Geo-Environmental_and_Geotechnical_Interpretative_Report.pdf (p. 47):
“A potential risk to controlled waters has been identified associated with potential leaching of heavy metals within general made ground at the following locations:”
Remediation: Undertake additional leachate testing across made ground hotspots (WS06, WS13, WS01), conduct seasonal groundwater monitoring (and sampling if present) during wetter winter months, and provide a qualitative or Tier 3 controlled waters risk assessment / remediation statement for the WS06/WS13 made ground.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Failed BRE 365 Infiltration Tests in Three Pits and Incomplete Three-Cycle Repeats
TECH_DRAINAGE_SUDS_GAP | F-FC-024
Of the six infiltration trial pits excavated to assess soakaway feasibility, TP01 (Windlesham/Swinley Clay) and TP02 and TP05 (Bagshot Formation) failed to drain sufficiently to calculate an infiltration rate after a single fill. Furthermore, the three successful pits (TP03, TP04, TP06) only recorded two test cycles (1.07x10-5 to 4.25x10-5 m/s) rather than the three consecutive fills specified by BRE Digest 365, demonstrating that infiltration is unviable or unproven across parts of the site.
CD1.17_-_Phase_1_and_Phase_2_Geo-Environmental_and_Geotechnical_Interpretative_Report.pdf (p. 62):
“*Unable to calculate infiltration rate due to insufficient drop in water level”
Remediation: Reconcile the drainage strategy with the failed infiltration results in the northern/central clay and parts of the Bagshot Formation, and if infiltration SuDS are relied upon in the southern Bagshot Formation, complete full three-cycle BRE 365 tests and confirm seasonal groundwater clearances.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Minimal Pesticides and Herbicides Testing Across 11 ha Former Nursery Site
TECH_EH_GEOTECH_GAP | F-FC-025
Historical mapping from 1915 to 1961 identifies the entire 11 ha site as nurseries divided into separate segments, and the CSM lists herbicides and pesticides as key contaminants of concern. However, Table 16 shows only 3 samples (2 topsoil, 1 subsoil, and 0 made ground) were tested for pesticides and herbicides across the entire site, providing limited spatial coverage of potential diffuse organochlorine or herbicide residues.
CD1.17_-_Phase_1_and_Phase_2_Geo-Environmental_and_Geotechnical_Interpretative_Report.pdf (p. 11):
“The entire site is identified as nurseries split into separate segments.”
Remediation: Undertake supplementary targeted topsoil and shallow made ground sampling for a broad-spectrum pesticide and herbicide suite across the former nursery parcels—particularly in proposed residential garden areas—or justify why the 3 tested samples are representative.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Omitted ADMS-Roads cumulative dispersion modelling despite >500 LDV AADT exceedance and internal contradiction
TECH_EH_GEOTECH_GAP | F-FC-026
Section 8.7 confirms the development will generate ~590 LDV AADT west of the site along Guildford Road, explicitly exceeding the EPUK/IAQM LUPDC >500 LDV AADT screening threshold in paragraph 5.8, yet Section 9.3 erroneously concludes operational vehicle movements will not exceed LUPDC screening thresholds. No detailed dispersion modelling (e.g. ADMS-Roads) is undertaken and no cumulative traffic flows from committed developments or Local Plan allocations are assessed as required by Guildford Local Plan Policy P9(3)(a) and IAQM/EPUK guidance.
CD1.19_-_Air_Quality_Assessment.pdf (p. 15):
“exceeds the screening criteria detailed in paragraph 5.8. However, this traffic is expected to”
Remediation: Undertake quantitative ADMS-Roads dispersion modelling for the A323 Guildford Road, Wyke Lane, and Ash Hill Road roundabout corridors incorporating committed developments and future-year background/emission factors, and reconcile the contradiction between Sections 8.7 and 9.3.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Absence of local roadside monitoring near the site and reliance on distant, outdated baseline data
TECH_EH_GEOTECH_GAP | F-FC-027
All seven NO2 diffusion tubes relied upon in Table 2 are 2.1 km to 3.6 km from the site, with no roadside monitoring along the A323 Guildford Road, Wyke Lane, or near Totterdown Preschool, and Rushmoor Borough Council data ends in 2023 (missing 2024). In addition, Section 8.4 relies on 2019 countywide CERC modelling with an unverified placeholder URL ('###') in footnote 1 rather than current local verification.
CD1.19_-_Air_Quality_Assessment.pdf (p. 13):
“Data obtained from GBC and RBC Air Quality Annual Status Reports (ASRs) (2024) and GBC 2024”
Remediation: Provide updated 2024/latest ASR monitoring data for both Guildford and Rushmoor, undertake a site-specific roadside NO2 diffusion tube survey along A323 Guildford Road and Ash Hill Road roundabout, and verify receptor concentrations (including Totterdown Preschool and proposed dwelling facades) via dispersion modelling.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Omitted Emissions Mitigation / Damage-Cost Assessment and unquantified PM2.5 mitigation
TECH_EH_GEOTECH_GAP | F-FC-028
Despite triggering the >500 LDV AADT threshold west of the site and proposing 200 dwellings, the assessment provides no Emissions Mitigation Assessment or damage-cost calculation under Guildford Local Plan Policy P9(4)–(8) and IAQM guidance. Furthermore, the response to Defra's October 2024 PM2.5 Interim Planning Guidance relies solely on proximity to bus stops and Ash Railway Station without committing to EV charging, fossil-fuel-free heating/no solid fuel stoves, or green infrastructure buffering.
CD1.19_-_Air_Quality_Assessment.pdf (p. 17):
“no requirement for further assessment or additional mitigation measures.”
Remediation: Prepare a Guildford Policy P9-compliant Emissions Mitigation Assessment and damage-cost calculation accounting for cumulative development traffic, and specify binding operational mitigation measures (EV charging, low/zero-emission heating, no wood-burning appliances, and roadside green infrastructure) tied to the pre-occupation Verification Report.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Unsecured Off-Site SANG Mitigation for Thames Basin Heaths SPA and SAC
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-029
The site lies 335 m from the Thames Basin Heaths SPA and Thursley, Ash, Pirbright & Chobham SAC, with the HRA concluding a Likely Significant Effect from recreational pressure. No on-site SANG is provided, council SANGs in the catchment are at capacity, and off-site SANG capacity at Wood Street Knoll is only at landowner discussion stage, failing to demonstrate mitigation certainty prior to determination under Regulation 63 of the Habitats Regulations 2017.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 169):
“3.6km east, is being considered, with discussions with the landowner underway.”
Remediation: Secure a binding option, legal agreement, or S106 mechanism allocating verified off-site SANG capacity within the relevant catchment prior to determination and obtain Natural England concurrence on the Appropriate Assessment.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
On-Site BNG Net Loss (-8.89%) and Metric Trading Rule Failure Without Secured Off-Site Units
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-030
The Statutory Biodiversity Metric results in an on-site net loss of 3.91 habitat units (-8.89%, inconsistently stated as 8.56% on page 114) and fails statutory trading rules due to losses of low-distinctiveness grassland, tall forbs, and ruderal habitats. No registered off-site habitat bank or S106 allocation is secured to resolve the trading failure or achieve the mandatory 10% (and Guildford Policy 20%) net gain.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 128):
“being satisfied in the proposals due to a loss of low distinctiveness grassland units, tall forbs”
Remediation: Submit the full Statutory Biodiversity Metric calculation spreadsheet (omitted from the PDF), reconcile the 8.56% vs 8.89% unit loss discrepancy, and identify a secured off-site habitat bank or bespoke compensation site to satisfy trading rules and net gain pre-determination.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Aborted Tree Bat Emergence Survey (T3/T4) Contradicts BNG Tree Loss Schedule
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-031
The Bat Survey Report aborted the third emergence survey on an un-climbable Ash tree with woodpecker and knot holes (labelled T3 in Table 12 and T4 in Table 5) claiming a fixed layout plan showed no impact from loss or lighting. However, Section 6.3 of the BNG Report explicitly lists tree T4 for removal, and no BS 5837 tree numbering reconciliation is provided to confirm whether the surveyed tree is retained or felled.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 52):
“completed as a fixed layout plan was released, indicating that this tree would not be impacted”
Remediation: Reconcile ecology and arboricultural tree numbering against the BS 5837 tree survey and Illustrative Masterplan; if the tree with woodpecker/knot holes is impacted by access works, felling, or lighting, complete the third seasonal emergence survey prior to determination.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Understated Annex II Barbastelle Activity in EcIA and No Dark-Corridor Lux Evidence
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-032
The EcIA (Table 3) and Bat Report NTS dismiss barbastelle as recorded only on August statics at 10–30 registrations and '<1% of total registrations', whereas Table 15 and Section 5.18 document 4.04% of total registrations including 379 calls in September and 85/203 calls in October along the southern and eastern boundaries. Relying on the understated figure undermines the impact assessment and omits quantified lux-contour commitments for dark corridors.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 61):
“Overall, barbastelle registrations on the automated statics consisted of a total of 4.04% registrations.”
Remediation: Revise the EcIA impact assessment to accurately reflect the September–October barbastelle activity peaks along the southern and eastern boundaries and define enforceable dark-corridor buffer widths and maximum lux limits (<= 0.5 lux) in an outline lighting framework.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Two Ponds Within 250m Scoped Out for GCN Without HSI or eDNA Survey
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-033
Despite two ponds lying within 250 m of the site and eight SBIC records of great crested newt within 1 km (nearest 800 m south-west), neither Habitat Suitability Index (HSI) assessments nor eDNA surveys were carried out. Scoping out GCN relies solely on a desktop assertion that the A323 acts as a dispersal barrier without checking pond quality or under-road drainage connectivity.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 15):
“separate from the Site by the A323, which would act as a barrier to dispersal, with”
Remediation: Undertake HSI assessments (and seasonal eDNA sampling if HSI >= average and connectivity via road culverts/hedgerows cannot be ruled out) or confirm Natural England District Level Licensing (DLL) eligibility.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
HRA Cites Wrong Competent Authority and Report Contains Missing/Cross-Reference Errors
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-034
The HRA (Appendix H) names 'Swale Borough Council' as the Competent Authority (with a legacy Perry Court Farm file path), while the EcIA references a non-existent 'Appendix I' for SANG/SAMM details and mis-cites Appendix H for BNG. Additionally, the BNG Report assesses the southern stream as a River baseline (page 144) but evaluates a Ditch ('D1') in Appendix C proposed condition sheets (page 153).
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 159):
“Swale Borough Council, to fulfil their duty as required under Regulation 63 of the CHSR.”
Remediation: Re-issue a corrected EcIA, BNG Report, and HRA naming Guildford Borough Council as Competent Authority, correcting all appendix cross-references, including the missing SANG statement/BNG metric tables, and aligning the watercourse vs ditch metric sheets.
HYGIENE_ADVISORY
AI Verified: TRUE_CONTRADICTION
Unquantified Riparian Buffer Width Along Southern Boundary Stream
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-035
The EcIA states that the stream along the southern boundary will be buffered from built development, but no minimum riparian buffer width (typically 8–10 m from bank top) is specified or fixed on parameter plans to protect the watercourse and adjacent slow-worm habitat.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 22):
“In the current proposals, the stream along the southern boundary of the Site will be buffered from any built development.”
Remediation: Specify and commit to a minimum 8–10 m undeveloped riparian buffer from the top of the bank along the southern stream on the Green Infrastructure / Land Use Parameter Plan.
HYGIENE_ADVISORY
AI Verified: TRUE_CONTRADICTION
Referenced draft masterplan drawing omitted from Conclusion section
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-037
Section 7 (Conclusion/Key Issues) states that 'the below drawing is based on the original draft masterplan for the development', but no drawing is present below that text on Page 14 or Page 15. This creates a minor document completeness omission.
CD1.13_-_Utilities_Statement.pdf (p. 14):
“Please note the below drawing is based on the original draft masterplan for the development and therefore is subject to change.”
Remediation: Append the referenced draft masterplan / utility constraints drawing to Section 7 or remove the orphaned text reference in a revised issue of the report.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Unquantified RPA Incursions and Unnamed Tree Removals for Non-Reserved Access
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-038
Although this outline application seeks detailed approval for access from Guildford Road and Wyke Lane (`OUTLINE_ACCESS_ONLY`), the AIA defers all Root Protection Area (RPA) incursion assessment and Arboricultural Method Statements to a post-consent condition. Furthermore, paragraph 4.3.1 refers to removing two individual trees at the Guildford Road access without listing their tree numbers or BS 5837 categories in the text or providing a formal Tree Removal and RPA Encroachment Schedule for the access geometry, visibility splays, and service crossings.
CD1.16_-_Arboricultural_Impact_Assessment.pdf (p. 12):
“On the presumption that following detailed design, encroachment within retained trees’ RPAs is likely to be unavoidable, further arboricultural input should be secured by condition via a request for an additional Arboricultural Impact Assessment or an Arboricultural Method Statement.”
Remediation: Submit an access-specific Tree Removal & RPA Encroachment Schedule identifying exact tree IDs (including the two Guildford Road access trees and four residential-parcel trees) and quantifying exact RPA incursion percentages and no-dig/construction specifications for the Guildford Road and Wyke Lane access works prior to determination.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Proposed Removal of TPO Tree T89 Due to Post-2022 Site Degradation and Unverified TPO G8 Boundary
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-039
The report proposes removing TPO-protected English Oak T89 (TPO No. 8/2017, 12 m RPA) on the basis that heavy plant movement and hard surfacing installed within its RPA after 2022 have degraded its condition, without proposing a specific TPO replacement ratio or demonstrating why the tree cannot be rehabilitated. Additionally, clearing c.62.8 m² of group G8 within the TPO No. 8/2017 belt relies on an unverified presumption that those trees post-date the 2017 Order.
CD1.16_-_Arboricultural_Impact_Assessment.pdf (p. 10):
“It is anticipated that the decline in T89’s physical state has occurred since the TPO was made; and consequently, due to its reduced outlook, no longer the asset it was, or of TPO quality. In this instance, the preferred option is to provide a compensatory strategy for the tree rather than preserve a diminished asset with limited long-term value.”
Remediation: Verify the exact extent and applicability of TPO No. 8/2017 (including the Area TPO and G8 age) against Council TPO records and 2017 aerial imagery, and provide a binding mitigation/replacement commitment for the loss of TPO tree T89 to demonstrate compliance with Guildford Local Plan Policy P6.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Uncompleted PiCUS Decay Investigation on T58 and Estimated RPAs for Ivy-Obscured Trees
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-040
The Tree Survey Schedule explicitly recommends a PiCUS sonic tomography investigation for mature English Oak T58 (Category B12, 11.4 m RPA) due to decaying heartwood, stating that its BS 5837 category requires full review upon results. Multiple other Category A and B trees (including TPO trees T20, T22, T23, T29, T65, T78, T79, T86) were obscured by ivy or dense understorey with estimated stem diameters (`#`), leaving exact RPA radii and structural condition unconfirmed.
CD1.16_-_Arboricultural_Impact_Assessment.pdf (p. 28):
“Recommend PiCUS investigation to determine extent of dysfunctional wood with full review of category upon results”
Remediation: Undertake the recommended PiCUS investigation on T58 and strip ivy/clear understorey around accessible Category A/B/TPO trees adjacent to access and development corridors to confirm measured stem diameters, RPA radii, and final BS 5837 retention categories.
HYGIENE_ADVISORY
AI Verified: TRUE_CONTRADICTION
Omitted BS 5837 Cascade Chart (Table 1) in Appendix D
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-041
Appendix D (Tree Survey Methodology) explicitly directs the reader to 'reproduced Table 1 overleaf' for the BS 5837:2012 section 4.5 cascade chart for tree quality assessment, but pages 42 and 43 of the document contain no table or text. In addition, Estimated Remaining Contribution is omitted from the Appendix B schedule.
CD1.16_-_Arboricultural_Impact_Assessment.pdf (p. 41):
“BS5837 Category: pursuant to BS5837:2012 section 4.5 and cascade chart for tree quality assessment (refer to reproduced Table 1 overleaf).”
Remediation: Re-issue Appendix D with the missing BS 5837:2012 Table 1 cascade chart included and include Estimated Remaining Contribution bands in the Appendix B Tree Survey Schedule for full BS 5837:2012 compliance.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Storage-Only Calculations Without 100yr+CC Network or Surcharged Outfall Modelling
TECH_DRAINAGE_SUDS_GAP | F-FC-043
The strategy relies solely on Causeway Flow storage volume estimates (4,024–4,685 m3 for 100yr+40%CC+10%UB) without any hydraulic pipe/network modelling, and the proposed basin capacity (4,656 m3) falls slightly below the 4,685 m3 upper estimate. Furthermore, Section 2.9 and Drawing Note 15 defer surcharged outfall modelling to detailed design despite the receiving ditch being ~0.80 m deep and 100yr+CC/1000yr flood extents being mapped at the outfall.
CD2.05_-_Shortland_Farm_-_Amended_Drainage_Strategy_(20_Feb_2026_supplementary).pdf (p. 59):
“STORAGE ESTIMATE (100YR+40%CC + 10%UB) : 4024m3 - 4685m3”
Remediation: Submit preliminary Causeway Flow / MicroDrainage hydraulic network calculations up to the 1-in-100yr + applicable climate change event incorporating surcharged outfall tailwater conditions, and demonstrate that proposed attenuation storage exceeds the upper bound requirement.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Absence of Spatial Exceedance Flow Routing Plan
TECH_DRAINAGE_SUDS_GAP | F-FC-044
Section 2.26 relies on a generic narrative claim that overland/exceedance flows will follow natural topography and internal roads away from dwellings, while Appendix F only plots existing overland flow routes. No dedicated spatial Exceedance Flow Routing Plan has been provided showing proposed exceedance pathways, finished floor threshold margins, or safe routing for events exceeding 1-in-100yr+CC or system blockage.
CD2.05_-_Shortland_Farm_-_Amended_Drainage_Strategy_(20_Feb_2026_supplementary).pdf (p. 13):
“2.26. Overland/exceedance flow paths would follow the natural topography of the land towards the”
Remediation: Provide a dedicated Exceedance Flow Routing Plan showing post-development overland flow pathways, road sag/kerb containment routes, safe discharge toward the southern open space, and minimum freeboard above finished ground levels.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Unverified Groundwater Separation and Omitted Full BRE 365 Trial-Pit Logs
TECH_DRAINAGE_SUDS_GAP | F-FC-045
Three BRE 365 trial pits (TP03, TP04, TP06) recorded viable infiltration rates (1.07x10^-5 to 4.25x10^-5 m/s in Bagshot Formation), yet wider infiltration is dismissed and seasonal groundwater monitoring is deferred to detailed design despite Soilscapes indicating naturally high groundwater and neighbouring pits showing seepage at 0.8 m bgl. Additionally, Appendix O containing the full BRE 365 test logs (referenced on p. 33) is omitted from the submission, leaving the >1 m unsaturated zone requirement and SuDS hierarchy compliance unproven.
CD2.05_-_Shortland_Farm_-_Amended_Drainage_Strategy_(20_Feb_2026_supplementary).pdf (p. 7):
“groundwater monitoring is undertaken to establish the highest annual groundwater level to”
Remediation: Append the full BRE 365 trial-pit logs (Appendix O) and undertake seasonal groundwater monitoring across existing boreholes to establish peak groundwater levels and confirm where infiltration or partial infiltration SuDS are viable.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Reliance on Single End-of-Line Basin Without Committed Upstream SuDS Train
TECH_DRAINAGE_SUDS_GAP | F-FC-046
While text references swales, bioretention, and permeable paving, Drawing CIV001-A03 marks all upstream source/conveyance features only as unquantified 'opportunities' and places the full site storage requirement into a single end-of-line detention basin. Section 2.12 further notes the highways authority is unlikely to adopt permeable paving, leaving adopted highway runoff without a committed multi-stage CIRIA C753 treatment train prior to the basin.
CD2.05_-_Shortland_Farm_-_Amended_Drainage_Strategy_(20_Feb_2026_supplementary).pdf (p. 11):
“2.12. It is unlikely that local highways authority will accept permeable paving or permeable sub -base”
Remediation: Quantify source-control and conveyance SuDS features (swales, bioretention, filter strips) within the parameter layout and demonstrate CIRIA C753 water quality compliance specifically for adopted highway runoff where permeable paving is excluded.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Unconfirmed Thames Water Foul Sewer Hydraulic Capacity
TECH_DRAINAGE_SUDS_GAP | F-FC-047
Thames Water's response in Appendix E only identifies a preferred point of connection (MH 5101 on Guildford Road) and advises checking manhole condition, without confirming hydraulic capacity in the receiving public foul sewer or downstream network for the proposed 9.25 l/s pumped discharge from 200 dwellings. An unverified pumped connection poses a pre-determination foul infrastructure capacity risk.
CD2.05_-_Shortland_Farm_-_Amended_Drainage_Strategy_(20_Feb_2026_supplementary).pdf (p. 55):
“Existing MH 5101 on Guildford Road will be preferred but to be honest you can connect to either manhole.”
Remediation: Obtain formal Thames Water Pre-Development Enquiry / capacity assessment confirming whether the Guildford Road foul network and downstream sewage treatment works can accommodate 9.25 l/s without reinforcement or sewer flooding.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
PICADY Model Inputs Phantom Central Reserve/Right-Turn Storage and Understates Minor Arm Visibility (18 m)
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-050
Although Section 6.7 states a dedicated right-turn lane is not required and Drawing MJGWYKELANE.1/01 shows a simple priority T-junction with no central island, the PICADY 10 model in Appendix G (incorrectly described as Junctions 11 in Section 6.5) models Arm C (Guildford Road W) with a 1.00 m kerbed central reserve and right-turn storage. In addition, Minor Arm B visibility is entered as only 18 m left/right instead of 43 m; phantom right-turn storage artificially increases junction capacity and masks right-turn blocking of westbound flows.
CD1.14_-_Transport_Assessment.pdf (p. 113):
“C 6.00 ü 1.00 110.0 ü 0.00”
Remediation: Re-run the Junctions model as a simple priority T-junction without a kerbed central reserve or right-turn storage, using accurate measured visibility splays from the definitive give-way line, and submit updated capacity outputs.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Omission of Committed Developments and Off-Site Junction Capacity Assessments
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-051
Section 6 models only the proposed site access junction using TEMPro 8.1 background growth to 2030, omitting any committed developments despite recent/adjacent housing schemes off Harpers Road and Local Plan Policy ID3(6) requiring cumulative impact assessment. No capacity modelling is provided for downstream junctions carrying 62% of development traffic westbound (Guildford Road / Stonehill Road / Ash Hill Road roundabout) or 38% eastbound (Wyke Lane priority junction).
CD1.14_-_Transport_Assessment.pdf (p. 31):
“Tempro 8.1 database for Guildford 010 to derive 2030 baseline traffic movements.”
Remediation: Agree a junction modelling scope and committed development list with SCC Highways, and submit 2030 base + committed + development capacity assessments for affected local junctions including the Guildford Road / Ash Hill Road roundabout and Wyke Lane junction.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Wyke Lane Emergency Access Lacks Visibility Splays and Fire Appliance Swept Paths
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-052
The Wyke Lane emergency access is not a reserved matter, yet Drawing MJGWYKELANE.1/06 shows only a 4.0 m access stub with no visibility splays plotted, no highway boundary/verge ownership confirmation, and no swept path check for a Fire and Rescue Service appliance. Appendix B Drawing TK01 tests only a refuse vehicle at the Guildford Road main access, leaving emergency vehicle operability at both accesses unverified.
CD1.14_-_Transport_Assessment.pdf (p. 54):
“EMERGENCY ACCESS ON WYKE LANE”
Remediation: Submit revised drawings for the Wyke Lane emergency access and Guildford Road access demonstrating compliant visibility splays within highway/applicant land and Fire Service pump appliance swept path tracking.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Visibility Splays (2.4 m x 43 m) Not Adjusted for Measured 34.6 mph 85th Percentile Speeds or Recessed Give-Way
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-053
The May 2025 ATC survey recorded 85th percentile dry-weather speeds of 34.6 mph westbound and 34.4 mph eastbound along the site frontage, exceeding the 30 mph speed limit used to justify 2.4 m x 43 m MfS visibility splays. In addition, the splays on Drawing MJGWYKELANE.1/01 are not measured from the recessed give-way line behind the proposed Copenhagen crossing as required by RSA Problem 3.1.
CD1.14_-_Transport_Assessment.pdf (p. 106):
“85th %ile (ALL) 34.6”
Remediation: Recalculate Stopping Sight Distance based on the measured 85th percentile speeds (~34.6 mph) and plot revised visibility splays from the actual give-way line position on Drawing MJGWYKELANE.1/01, confirming no third-party land or hedgerow obstruction.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Unaddressed SCC Pre-Application Requests for PRoW Lighting, Cycle Upgrade, and Active Travel Infrastructure
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-054
SCC's pre-application response requested upgrading Public Footpath 356 through the site and to Ash Railway Station to include lighting and potential cyclist use, alongside Policy ID9 cycle enhancements along Guildford Road. The TA omits any lighting or cycle upgrade proposals for Public Footpath 356, leaves off-site PRoW surfacing unassured due to third-party land constraints, and offers no defined LTN 1/20 cycle infrastructure on Guildford Road.
CD1.14_-_Transport_Assessment.pdf (p. 6):
“the site and up to Ash Railway Station, to include surfacing, lighting and potential”
Remediation: Provide a reasoned response and deliverable active travel package addressing lighting and shared pedestrian/cycle upgrade feasibility for Public Footpath 356 and defined LTN 1/20-compliant cycling enhancements on Guildford Road.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Outdated 2011 Census Trip Distribution and Incomplete 3-Year PIA Collision Analysis
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-055
Despite the TA being dated October 2025, vehicle trip distribution relies on 2011 Census Travel to Work data rather than 2021 Census data, and Appendix F contains a minor arithmetic discrepancy in PM peak total trips (90 vs 91 in Table 5.4). Furthermore, Figure 2.8 is titled '5-Year PIA Data' but the text analyses only 3 years (01/02/2022–31/01/2025) and dismisses a serious collision at the Wyke Lane / Guildford Road junction without reviewing collision causation.
CD1.14_-_Transport_Assessment.pdf (p. 16):
“where casualties have been reported within the dates of 01/02/2022 – 31/01/2025.”
Remediation: Update trip distribution using 2021 Census data (or justify 2011 Census retention), reconcile the Appendix F trip table, and provide a full 5-year PIA collision dataset including causation details for the serious collision at Wyke Lane / Guildford Road.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Storage-Only Calculations Without 100yr+CC Network Modelling or Surcharged Outfall Verification
TECH_DRAINAGE_SUDS_GAP | F-FC-056
The strategy relies solely on Causeway Flow surface water storage volume estimates (4,024-4,685 m3) and provides no hydraulic pipe/network simulation outputs up to 1-in-100yr + climate change. Furthermore, although Drawing CIV001 plots 100yr+CC and 1000yr flood extents adjacent to the southern outfall (75.25 mAOD) and basin base (75.90 mAOD), surcharged outfall modelling is explicitly deferred to detailed design, leaving the adequacy of the safeguarded basin footprint unverified.
CD1.12_-_Drainage_Strategy.pdf (p. 59):
“ATTENUATION VOLUMES HAVE BEEN CALCULATED USING CAUSEWAY FLOW SURFACE”
Remediation: Submit preliminary Causeway Flow / MicroDrainage hydraulic network calculations up to 1-in-100yr + applicable climate change (checking +40% and upper-end +45% sensitivity) incorporating surcharged outfall tailwater conditions from the receiving watercourse to prove the basin volume and land-take are achievable.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Absence of Spatial Post-Development Exceedance Flow Routing Plan
TECH_DRAINAGE_SUDS_GAP | F-FC-057
Section 2.26 relies on generic assertions that overland/exceedance flows will follow natural topography and internal roads away from properties, without providing a dedicated spatial Exceedance Flow Routing Plan. Drawing CIV001 only indicates existing overland flow routes and does not demonstrate post-development exceedance pathways for events exceeding 1-in-100yr+CC or inlet blockage scenarios.
CD1.12_-_Drainage_Strategy.pdf (p. 13):
“2.26. Overland/exceedance flow paths would follow the natural topography of the land towards the”
Remediation: Prepare a spatial post-development Exceedance Flow Routing Plan overlaid on the parameter/illustrative layout showing indicative road levels, finished floor levels, and safe overland pathways directed away from proposed dwellings and off-site receptors.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Missing Seasonal Groundwater Monitoring Despite High Groundwater Risk
TECH_DRAINAGE_SUDS_GAP | F-FC-058
Soilscapes identifies loamy soils with naturally high groundwater, on-site window samples encountered groundwater at 2-4 m bgl, and neighbouring site testing recorded seepage at 0.8 m bgl, prompting the report itself to recommend groundwater monitoring. Proceeding without seasonal groundwater level data leaves both partial infiltration feasibility (>1 m clearance) and potential groundwater ingress/flotation risk to the ~1.35 m deep attenuation basin (base ~75.90 mAOD) unresolved pre-determination.
CD1.12_-_Drainage_Strategy.pdf (p. 7):
“groundwater monitoring is undertaken to establish the highest annual groundwater level to”
Remediation: Undertake seasonal groundwater level monitoring across the site (particularly in the southern parcel around the proposed attenuation basin and infiltration zones) to establish peak winter groundwater levels and confirm whether an impermeable liner or raised basin levels are required.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Informal Foul Sewer Enquiry and Internal Report Contradictions
TECH_DRAINAGE_SUDS_GAP | F-FC-060
Thames Water correspondence in Appendix E is an informal email confirming MH 5101 as a preferred connection point without confirming downstream hydraulic capacity for 9.25 l/s pumped foul flows from 200 dwellings. Additionally, the submission contains internal contradictions: Drawing CIV001 legend identifies an 'EXISTING THAMES WATER COMBINED SEWER' whereas Section 2.2 states no public combined sewers exist nearby, and Drawing Note 13 specifies a discharge rate of 2.9 l/s/ha whereas the strategy proposes 12.70 l/s (~2.27 l/s/ha across 5.588 ha).
CD1.12_-_Drainage_Strategy.pdf (p. 55):
“Existing MH 5101 on Guildford Road will be preferred but to be honest you can connect to either manhole.”
Remediation: Obtain a formal Thames Water Pre-Development Enquiry confirming downstream foul network capacity for 200 dwellings (9.25 l/s), clarify riparian ownership and capacity of the unnamed southern ditch for Ordinary Watercourse Consent, and reconcile the sewer type and l/s/ha rate discrepancies between the report text and Drawing CIV001.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Seasonal Groundwater Monitoring Deferred Despite 0.8m bgl Seepage & Policy P11(8) Clearance Rule
TECH_DRAINAGE_SUDS_GAP | F-FC-061
Guildford Local Plan Policy P11(8)(a) requires infiltration SuDS proposals to provide evidence of at least 1m vertical separation above the maximum likely groundwater level. While 3 of 6 BRE 365 pits failed and neighbouring sites recorded water seepage at 0.8m bgl (with Soilscapes indicating naturally high groundwater), the FRA proposes partial infiltration yet defers seasonal groundwater monitoring to detailed design rather than establishing peak groundwater levels pre-determination.
CD1.10_-_Flood_Risk_Assessment_(30.10.2025).pdf (p. 31):
“Neighbouring developments infiltration testing recorded water seepage within trial pits at 0.8m”
Remediation: Submit seasonal groundwater level monitoring logs across the site (targeting areas proposed for partial infiltration) and demonstrate compliance with Local Plan Policy P11(8)(a) (>1m unsaturated zone) and P11(8)(b) hydrogeological risk assessment prior to determination.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
PPG 027 Sequential Test Exemption Relied Upon Despite Unmitigated Primary Access Flooding
TECH_DRAINAGE_SUDS_GAP | F-FC-062
Access from Guildford Road and Wyke Lane is applied for in detail (not reserved) under this outline application, yet Aegaea's own modelling shows the primary access floods up to 0.23m in the 1 in 100+45% CC event (0.15m in 1 in 30+CC) and isolated PRoW areas reach 'Danger to Some' (0.75–1.25). The FRA claims exemption from the Sequential Test under PPG 7-027 without proposing highway level raising/drainage mitigation to keep the primary access dry or providing an agreed emergency access plan.
CD1.10_-_Flood_Risk_Assessment_(30.10.2025).pdf (p. 28):
“It is observed that the primary access could be affected by flooding, with maximum depths in”
Remediation: Provide detailed access design levels and drainage/flood mitigation demonstrating safe, dry primary access up to the 1 in 100+45% CC event (or submit an agreed Flood Warning and Evacuation Plan for the Wyke Lane secondary emergency access and PRoW) to substantiate the PPG 7-027 Sequential Test exemption.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
2D Direct Rainfall Hydraulic Model Parameters Omitted from FRA
TECH_DRAINAGE_SUDS_GAP | F-FC-063
The FRA relies on Aegaea's bespoke 2D direct rainfall model to discount EA High and Medium surface water flood risk across the proposed housing parcels, citing a separate detailed model report. However, the FRA itself omits core modelling parameters (loss/infiltration rates, surface roughness, grid resolution, ditch/culvert representation, and sensitivity checks), preventing independent verification within the FRA.
CD1.10_-_Flood_Risk_Assessment_(30.10.2025).pdf (p. 21):
“A supporting detailed model report which details the model build and decision making is”
Remediation: Ensure the referenced supporting detailed model report is submitted and cross-checked by the LLFA, or append a summary table of model build parameters, hydrological losses, and sensitivity results to the FRA.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Unquantified Fluvial Risk and Unsurveyed Structures on Southern Ordinary Watercourse
TECH_DRAINAGE_SUDS_GAP | F-FC-064
The deepest on-site flooding occurs along the unnamed Ordinary Watercourse on the southern boundary (Section 5.4), yet hydraulic structures were represented solely as simple 2D DTM cut-throughs without channel or culvert survey data (Section 4.4). Section 1.8 confirms that a fluvial assessment supported by survey data is required to quantify this risk, leaving the fluvial flood envelope and safe outfall/development levels unresolved unless addressed by a companion study.
CD1.11_-_Flood_Risk_Assessment_Modelling_Report.pdf (p. 6):
“Flood risk associated with the
unnamed Ordinary Watercourse to the south was represented in the model for completeness
but would require a fluvial assessment supported by survey data to better understand and
quantify this risk.”
Remediation: Commission a topographic channel and structure survey of the unnamed Ordinary Watercourse and undertake a 1D-2D fluvial hydraulic assessment (including 1 in 100 year + climate change allowance) to establish fluvial flood extents and levels.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
No Post-Development Hydraulic Scenario or Exceedance Flow Routing Check
TECH_DRAINAGE_SUDS_GAP | F-FC-065
Section 2.8 identifies that proposed dwellings could be situated within EA RoFSW flood risk areas, and baseline TUFLOW outputs confirm overland flow paths and ponding up to 0.86 m across the northern boundary and western edge (Section 5.4, Table 5). However, this modelling report evaluates only existing baseline conditions and provides no post-development model run or Exceedance Flow Routing Plan to verify that proposed dwellings, levels, and accesses remain safe without displacing floodwater.
CD1.11_-_Flood_Risk_Assessment_Modelling_Report.pdf (p. 8):
“When assessing the EA modelled outputs against the site layout It was observed that
the new dwellings could be in an area of risk.”
Remediation: Simulate a post-development 2D hydraulic scenario incorporating proposed site grading, SuDS basins, and road corridors, and produce a spatial Exceedance Flow Routing Plan for the 1 in 100 year + 45% CC and 1 in 1,000 year events.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Report QA Error: Copy-Paste Reference to Unrelated Site ('Longwick') in Kerb Review
TECH_DRAINAGE_SUDS_GAP | F-FC-066
Section 4.7 states that 'Kerbs were found to be present across the majority of the urban area of Longwick', whereas the application site is Land at Shortland Farm in Ash, Guildford, Surrey. This unedited copy-paste from a separate project (Longwick, Buckinghamshire) undermines confidence that local road and kerb geometry along Guildford Road and Wyke Lane was actually inspected in the 1m TUFLOW terrain.
CD1.11_-_Flood_Risk_Assessment_Modelling_Report.pdf (p. 15):
“Kerbs were found to be present across the majority of the urban area of Longwick.”
Remediation: Re-verify road and kerb representation along Guildford Road, Wyke Lane, and adjacent Ash streets in the TUFLOW DTM and issue a corrected report removing the erroneous Longwick reference.
HYGIENE_ADVISORY
AI Verified: TRUE_CONTRADICTION
Missing Referenced Topographic Survey Appendix and Table 3/4 CC Label Mismatch
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-067
Section 2.2 states that the April 2025 topographic survey—which significantly alters northern flood extents compared to 2022 EA LiDAR (Section 5.6)—is 'appended to this assessment', but no appendix is attached to the 28-page report. In addition, Tables 3 and 4 mislabel the 1 in 30 year climate change scenario as '+40%', whereas Sections 3.9, 4.14, Figure 6, and the rainfall arithmetic (19.35 × 1.35 = 26.12 mm) apply '+35%'.
CD1.11_-_Flood_Risk_Assessment_Modelling_Report.pdf (p. 7):
“Aegaea have been provided with a topographic survey (dated April 2025), appended to this
assessment.”
Remediation: Append the April 2025 topographic survey drawing to the report for LLFA auditability and correct the '+40%' label in Tables 3 and 4 to '+35%'.
HYGIENE_ADVISORY
AI Verified: TRUE_CONTRADICTION
HPC Celerity Control Number (Nc) Exceeds Stability Threshold (1.01 > 1.00)
TECH_DRAINAGE_SUDS_GAP | F-FC-068
In the 1 in 100 year + 45% CC simulation, Table 6 records a maximum Celerity Control number (Nc) of 1.01, exceeding the report's own stability criterion of Nc < 1.00 (Section 7.6), while Nd reaches the 0.30 upper threshold. Although attributed to deep ponding in northern depressions, no timestep-cap or cell-size sensitivity check was run to confirm peak flood depths are unaffected.
CD1.11_-_Flood_Risk_Assessment_Modelling_Report.pdf (p. 26):
“Generally, for a stable model these values should be: Nu<1, Nc<1 and Nd<0.3.”
Remediation: Conduct a brief timestep-cap or local grid sensitivity check to confirm that Nc = 1.01 and Nd = 0.30 do not cause numerical oscillation in the northern ponding zones.
HYGIENE_ADVISORY
AI Verified: TRUE_CONTRADICTION
Unlifted Highway Chambers and Acoustic-Only Sewer Connectivity Assumptions
TECH_DRAINAGE_SUDS_GAP | F-FC-069
Several Guildford Road chambers could not be raised ('UTR' due to high traffic), an on-site chamber near the septic tank has a missing cover and obscured pipe, and sewer routes are assumed straight via acoustic tracing without man-entry. If proposed foul or surface water connections rely on these existing assets, invert levels and connectivity will require verification via CCTV and traffic-managed chamber lifting.
CD1.06_-_Topographical_Survey.pdf (p. 1):
“ONLY. THESE ARE TO BE CONSIDERED ASSUMED AND SHOULD BE”
Remediation: Commission a targeted CCTV and traffic-managed manhole lifting survey for any existing highway or on-site sewers relied upon for drainage tie-in at detailed design / condition stage.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Missing External Lighting Lux Plot and Unquantified Dark Corridor Spill Limits
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-070
Although the statement identifies the southern PRoW/dry ditch and east/west hedgerows as ecologically sensitive dark corridors and highlights that the main access road crosses the southern PRoW, it omits an ILP GN 01/21 / BCT GN 08/23 lux contour plot and specifies no quantitative lux cap for dark corridors. Without access-stage spill calculations or binding illuminance thresholds, the statement does not demonstrate that the non-reserved access corridor can operate safely without severing nocturnal wildlife/bat movement.
CD1.22_-_Lighting_Statement-P03.pdf (p. 9):
“The estate lighting design should take account of the crossing point of the main access road and the PRoW and balance the dark corridor requirement and street lighting design.”
Remediation: Submit an illustrative external lighting lux contour plan covering the Guildford Road/Wyke Lane accesses and the main access road crossing of the southern PRoW, and commit to quantitative maximum illuminance targets (e.g., <=0.5 lx) along all retained dark corridors and boundary hedgerows.
HYGIENE_ADVISORY
AI Verified: TRUE_CONTRADICTION
Environmental Zone E3 Classification for Unlit Farmland Without Baseline Justification
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-072
The statement classifies the site as Environmental Zone E3 (Suburban, allowing 10 lx pre-curfew and 2 lx post-curfew vertical illuminance beyond the boundary) while acknowledging in Section 1.3.6 that the existing site is unlit grassland and farmland. No baseline night-time brightness survey is provided to justify E3 rather than the stricter E2 (Rural: 5 lx pre-curfew, 1 lx post-curfew) obtrusive light limits.
CD1.22_-_Lighting_Statement-P03.pdf (p. 6):
“Using the information provided in the table, the site can be classified as suburban with the Environmental Zone being E3.”
Remediation: Provide baseline ambient lighting evidence to justify Environmental Zone E3 or adopt Environmental Zone E2 boundary spill limits (5 lx pre-curfew / 1 lx post-curfew) along rural and ecologically sensitive perimeters.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Narrative-vs-Table Parity Conflict on Completed PRoW Visual Effects
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-073
Table 6.3 judges that on completion the visual changes for people using the local PRoW network and permissive footpaths (Viewpoints 4 and 5) will be determinative in the application process and significant. However, Section 7 (Paragraphs 7.19–7.20) omits completed PRoW visual effects entirely from its summary of Significant Visual Effects, listing only construction-phase impacts and residual effects on Wyke Lane residents.
CD1.04_-_Landscape_and_Visual_Imapct_Assessment.pdf (p. 32):
“On completion the changes will be determinative in the application process and significant in terms of the assessment.”
Remediation: Reconcile Section 7 (Significant Visual Effects) with Table 6.3 so that significant operational visual effects on PRoW users—and their adverse, neutral, or mixed direction—are transparently reported in the conclusions.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Baseline Viewpoint 08 and Appendix 3 Location Map Omitted from Assessment
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-074
Appendix 3 presents eight baseline photographic sheets (Baseline Viewpoint 01 through Baseline Viewpoint 08), yet Page 42 (intended for the Appendix 3 Viewpoint Locations plan) is completely blank and Viewpoint 08 is omitted from the receptor sensitivity, magnitude, and significance evaluations in Tables 3.1, 5.2, and 6.3. This leaves a documented baseline viewpoint unlocated in Appendix 3 and unassessed in the LVIA tables.
CD1.04_-_Landscape_and_Visual_Imapct_Assessment.pdf (p. 50):
“Baseline Viewpoint: 08”
Remediation: Populate Page 42 of Appendix 3 with the full Viewpoint Locations map and add Viewpoint 08 to Tables 3.1, 5.2, and 6.3 (or explicitly document why it was scoped out).
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Seasonal Photography Discrepancy (April Spring Photos Labelled as Winter Baseline)
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-075
Paragraph 2.32 and the Appendix 3 title describe the baseline photography as 'winter 2024/2025' / 'Baseline Winter Photography' in compliance with LI TGN 06/19, whereas Paragraph 1.27 and all Appendix 3 title blocks confirm the photographs were taken on 11 April 2025 (spring, post-budburst). Presenting April photography as winter baseline risks understating worst-case leaf-off visual permeability.
CD1.04_-_Landscape_and_Visual_Imapct_Assessment.pdf (p. 13):
“The Appendix 3 contains professional photography (winter 2024/2025) taken in compliance with the Landscape Institutes guidance on photography”
Remediation: Correct the seasonal classification of the April 2025 photography in Section 2 and Appendix 3, and provide verified winter (leaf-off) baseline photographs for key hedgerow-screened viewpoints per LI TGN 06/19.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Missing Cumulative LVIA, Parameter-Height Wireframes, and ZTV Sensitivity Check
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-076
Paragraph 2.14 and Figure 2.3 identify adjacent Local Plan housing and employment allocations and substantial ongoing landscape change within LCA E1, yet the LVIA omits a cumulative landscape and visual impact assessment (CLVIA). In addition, no wireframes or photomontages of the parameter-plan envelope are provided (despite Footnote 1 referencing commissioned visualisation specialists THL), and the ZTV (Figure 2.8) models only 2-storey development without verifying the maximum heights permitted by the Building Heights Parameter Plan.
CD1.04_-_Landscape_and_Visual_Imapct_Assessment.pdf (p. 8):
“Notably since 2007, when the document was published, the landscape within LCA E1 Tongham Rural-Urban Fringe has undergone significant change (see Figures 2.2a and 2.2b), with further planned changes through delivery of Local Plan allocations (Figure 2.3).”
Remediation: Submit a cumulative LVIA addressing the allocated sites in Figure 2.3, verify whether the Building Heights Parameter Plan exceeds 2 storeys (updating Figure 2.8 if so), and provide LI TGN 06/19 wireframes/photomontages for representative viewpoints.
HYGIENE_ADVISORY
AI Verified: TRUE_CONTRADICTION
Inconsistent Public Footpath Numbering (Footpath 356 vs. Footpath 357)
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-078
Paragraph 2.24 identifies the east-west Public Right of Way crossing the northern portion of the Application Site as Footpath 356, whereas Tables 5.1, 5.2, 6.2 and Paragraph 7.19 consistently refer to the route permanently breached by the new site access road as Footpath 357. This internal numbering inconsistency creates ambiguity over the definitive PRoW affected.
CD1.04_-_Landscape_and_Visual_Imapct_Assessment.pdf (p. 10):
“Footpath 356 crosses the northern part of the Application Site (east-west).”
Remediation: Verify the definitive Surrey County Council PRoW number on Figure 2.5 and harmonise all references between Footpath 356 and Footpath 357 across the LVIA and access parameter drawings.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Omitted Materials Rating Database & Lifecycle Carbon Analysis (Policy D14(2)-(3))
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-079
Local Plan Policy D14(2)-(3) requires major developments to demonstrate embodied carbon minimisation using a respected materials rating database and to show how building and public space lifecycles have been considered. Section 5.2 provides only generic qualitative intentions (e.g. considering low-carbon concrete and local suppliers) without referencing any materials rating database (such as the BRE Green Guide or ICE database) or lifecycle carbon methodology.
CD1.21_-_Energy_and_Sustainability_Statement_(29.10.25).pdf (p. 13):
“b) taking into account the embodied carbon emissions of materials based on information provided in a respected”
Remediation: Submit an Embodied & Whole-Life Carbon Addendum identifying the materials rating database to be used (e.g. BRE Green Guide / RICS WLCA framework) and setting out measurable embodied carbon targets and lifecycle considerations ahead of Reserved Matters.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Unsubstantiated Dismissal of Heat Network Threshold for 200-Dwelling Scheme (Policy D16(3))
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-080
Appendix A dismisses Policy D16(3) (which requires 'sufficiently large or intensive developments' to give adequate consideration to low carbon heat networks) by describing a 200-dwelling, 10.18 ha major scheme as a 'small residential development'. It neither cites nor tests the proposal against the quantitative dwelling/heat-load thresholds defined in Guildford's Climate Change, Sustainable Design, Construction & Energy SPD.
CD1.21_-_Energy_and_Sustainability_Statement_(29.10.25).pdf (p. 42):
“As a small residential development, this proposed site is neither ‘sufficiently large’ or ‘intensive’.”
Remediation: Verify the scheme against the exact dwelling/floorspace thresholds for 'sufficiently large or intensive developments' in Guildford's Climate Change SPD and update Appendix A with a quantitative heat-load and cost-feasibility justification.
HYGIENE_ADVISORY
AI Verified: TRUE_CONTRADICTION
Unaddressed Local Plan Policy D15(5) Wildfire Risk Clause
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-081
Section 3.2.4 reproduces LPDMP Policy D15(5) regarding wildfire prevention and management in and around high wildfire risk areas near significant habitats. However, Section 7 (Climate Change Adaptation) contains no screening or confirmation of whether the site (which includes lowland acid grassland near Ash) falls within or adjacent to a wildfire risk zone.
CD1.21_-_Energy_and_Sustainability_Statement_(29.10.25).pdf (p. 14):
“5) Development proposals in and around areas of high risk of wildfire are required to be designed and managed to”
Remediation: Confirm whether the site lies within or adjacent to a Surrey wildfire risk area and, if applicable, incorporate appropriate landscape buffer and fire-management measures in Section 7.
HYGIENE_ADVISORY
AI Verified: TRUE_CONTRADICTION
Improper Credit Claimed for External Water Butts in Part G 110 l/p/d Target
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-082
Section 6.6.2 relies on 'rainwater recycling via water butts' alongside low-flow fittings to calculate compliance with the 110 l/p/d Building Regulations Part G enhanced target. Under the Approved Document G Water Efficiency Calculator, external garden water butts do not contribute to internal potable water consumption reductions (only plumbed rainwater/greywater systems for WCs or washing machines qualify).
CD1.21_-_Energy_and_Sustainability_Statement_(29.10.25).pdf (p. 33):
“appliances plus rainwater recycling via water butts to ensure that daily water use will be calculated”
Remediation: Clarify that the 110 l/p/d target will be achieved solely through internal fittings/appliances (or plumbed rainwater/greywater reuse under Policy D14(6)) without relying on garden water butts in the Part G calculation.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Prior refusal reason (17/P/00507) and appeal inquiry precedent (20/P/01461) unaddressed
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-083
Section 2.11 quotes Guildford Borough Council's Screening Opinion highlighting that setting impacts on Grade II York House and East Wyke Farm Cottage were a reason for refusal under previous application 17/P/00507, and that Ash Manor's setting was examined at public inquiry 20/P/01461. However, the HIA provides no analysis of the specific refusal grounds or appeal inspector findings to demonstrate how the current scheme overcomes those prior heritage objections.
CD1.08_-_Heritage_Impact_Assessment_(20.10.25).pdf (p. 8):
“York House and East Wyke Farm Cottage (both Grade II Listed Buildings) are closer to the application site, the impact on their setting was a reason for refusal for a previous planning application on the application site (planning reference: 17/P/00507).”
Remediation: Submit an HIA addendum reviewing the heritage refusal reasons in 17/P/00507 and the appeal decision in 20/P/01461, explicitly comparing setbacks, heights, and buffer widths against the refused scheme.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Heritage conclusions rely on illustrative layout and unfixed landscape parameters
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-084
Although all matters except access are reserved, the HIA relies on an indicative 'current site layout', an open space buffer and treeline whose detailed specification is deferred to a future landscape framework, and 2-to-3 storey building heights as embedded mitigation to limit harm to Grade II assets. No binding Parameter Plans or maximum height/setback parameters are cited within the HIA to ensure this mitigation is legally secured at outline stage.
CD1.08_-_Heritage_Impact_Assessment_(20.10.25).pdf (p. 22):
“While the detailed specification will be set out in the landscape framework, the current site layout includes a defined area of open space, a footpath, and a treeline designed to limit visibility and preserve the character of the setting.”
Remediation: Cross-reference and verify consistency against approved Parameter Plans (Land Use, Building Heights, Green Infrastructure) to ensure all heritage buffers, setbacks, and maximum two-storey edge heights are secured by condition.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Lack of ZTV/ZVI and winter-leaf visual verification despite summer-only fieldwork
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-085
Section 2.6 states GPAPN3 supports using a Zone of Visual Influence or Zone of Theoretical Visibility (ZTV), and Section 5.4 acknowledges that views from York House across the fields would likely be greater in winter due to reduced leaf coverage. Nevertheless, fieldwork was undertaken solely in July 2025, and the HIA includes no ZTV, winter photography, or verified visual viewpoints from York House or East Wyke Farm Cottages toward the application site.
CD1.08_-_Heritage_Impact_Assessment_(20.10.25).pdf (p. 6):
“GPAPN3 supports the use of an ‘area of search’ around the application Site within which it is reasonable to consider setting effects and for the use of a ‘Zone of Visual Influence’ or ‘Zone of Theoretical Visibility’ in relation to the proposed development to better identify heritage assets and settings that may be affected.”
Remediation: Provide a ZTV/ZVI and winter-condition (leafless) photographic views from York House and East Wyke Farm Cottages towards the site, integrated with the LVIA viewpoints, to substantiate the low-harm visual screening claims.
HYGIENE_ADVISORY
AI Verified: TRUE_CONTRADICTION
No cross-reference to Archaeological DBA or Surrey HER despite historic on-site cottages
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-087
Section 1.1 restricts this HIA to above-ground heritage assets without cross-referencing a separate Archaeological Desk-Based Assessment or Surrey HER search, despite Section 4.10 documenting historic buildings (Shortlands Cottages and Grenado Cottage) demolished on site in the 1960s and proximity to medieval Ash Manor. Downstream review must confirm whether a standalone Archaeological DBA accompanies the outline submission.
CD1.08_-_Heritage_Impact_Assessment_(20.10.25).pdf (p. 5):
“It assesses the effect of the proposal on surrounding above-ground heritage assets.”
Remediation: Confirm submission of a standalone Archaeological Desk-Based Assessment (and geophysical/trial trenching evaluation where required by the County Archaeologist) to address below-ground heritage assets under NPPF paragraph 207.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Deferred Field Evaluation and Incomplete Mitigation Footprint Despite Policy D23 and Projected Roman Road
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-088
Guildford Local Plan Policy D23 (3.8) requires a field evaluation where appropriate to inform determination of sites exceeding 0.4 ha, and Surrey HER data records a projected/possible Roman road (HER 4619, Medium importance) crossing the site. No pre-determination geophysical survey or trial trench evaluation has been undertaken, and Section 8.5 narrows the recommended post-consent geophysical survey solely to areas of foundation construction while anticipating monitoring only—omitting SuDS basins, flood risk mitigation excavations, landscaping/levelling, and service trenches up to 0.75 m deep.
CD1.09_-_Archaeology_Desk_Based_Assessment.pdf (p. 30):
“Given the low to moderate potential of the site, it is recommended that a geophysical survey is undertaken in areas that are to undergo foundation construction, to ascertain whether any archaeological features of note, particularly the speculated Roman Road, are present. This could be secured by condition, and during the relevant phase, and is not considered to be prohibitive to the granting of planning permission.”
Remediation: Confirm with the Surrey County Council Archaeological Officer whether pre-determination geophysical survey (and targeted trial trenching if anomalies align with HER 4619) is required under Policy D23 prior to determination, and expand the survey and mitigation scope beyond building foundations to cover SuDS features, service corridors, and landscaping/levelling works.
HYGIENE_ADVISORY
AI Verified: TRUE_CONTRADICTION
HER Gazetteer Count Discrepancy and Duplicate Investigation Entry
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-089
Section 5.4 reports 46 non-designated archaeological assets within the 1 km study area (42 monuments and 4 findspots), whereas the Appendix 3 gazetteer lists only 40 records (35 monuments, 1 negative evidence entry, and 4 findspots/monument-and-findspots). In addition, the Appendix 3 Previous Investigations table lists 14 rows to match Section 5.1 but duplicates investigation ESE16921 (Land at White Lane, Ash Green).
CD1.09_-_Archaeology_Desk_Based_Assessment.pdf (p. 16):
“There are no non-designated archaeological assets within the site and 46 within the study area. These comprise 42 monuments and 4 findspots.”
Remediation: Reconcile the Appendix 3 gazetteer with the 46 study-area HER records cited in Section 5.4 and remove the duplicate ESE16921 entry from the Previous Investigations table.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Air Quality Assessment Scopes Out Statutory Ecological Sites vs. EcIA Confirming Thames Basin Heaths SPA/SAC 335m North with 881 AADT Traffic
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-001
The Air Quality Assessment (CD1.19, p.6) asserts that a MAGIC review identified zero statutory designated ecological sites close to the site or in the vicinity of roads affected by development traffic, and therefore completely scopes out ecological air quality impacts. Directly contradicting this, the Ecological Impact Assessment (CD1.07, p.19–20) confirms that the internationally designated Thames Basin Heaths Special Protection Area (SPA) and Thursley, Ash, Pirbright & Chobham Special Area of Conservation (SAC) lie just 335m north of the site (with the northern parcel falling inside the 400m SPA exclusion zone) and that affected roads within 200m of the SPA/SAC carry 881 AADT of development traffic.
Statutory Impact: Natural England and the Local Planning Authority cannot discharge their statutory duty under Regulation 63 of the Conservation of Habitats and Species Regulations 2017 (Habitats Regulations Assessment) when the technical Air Quality Assessment falsely states no statutory ecological sites exist near affected roads and omits nitrogen deposition / ammonia and in-combination traffic emissions modelling.
CD1.19_-_Air_Quality_Assessment.pdf (p. 6):
“No statutory designated ecological sites were identified close to the site, or in the vicinity of roads”
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 19):
“881 AADT on this part of the network. This does not exceed the daily increase in”
Remediation: Revise the Air Quality Assessment (CD1.19) to acknowledge the Thames Basin Heaths SPA and Thursley, Ash, Pirbright & Chobham SAC within 335m of the site and within 200m of the affected road network, and provide an IAQM/Natural England-compliant in-combination traffic screening and nitrogen deposition assessment to support the HRA.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Unreserved Primary Access Visibility Splay Designed for 30mph (43m) vs. Observed 85th Percentile Traffic Speeds of 34.6mph
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-002
Primary vehicular access onto the A323 Guildford Road is an unreserved matter being determined in detail at this Outline stage. Both the Design and Access Statement (CD1.35, p.38) and Transport Assessment (CD1.14, p.23) design the access junction with 2.4m x 43m visibility splays based solely on the posted 30mph speed limit under Manual for Streets. However, the applicant's own May 2025 Automatic Traffic Counter (ATC) survey in Appendix F of the Transport Assessment (CD1.14, p.106) recorded actual 85th percentile wet/dry traffic speeds of 34.6 mph westbound and 34.4 mph eastbound along the site frontage, which require longer Stopping Sight Distances (circa 52m–59m) than the 43m splays submitted for approval.
Statutory Impact: Surrey County Council (Local Highway Authority) is likely to issue a highway safety holding objection or recommend refusal on the unreserved access drawing because the submitted 2.4m x 43m splay is deficient against measured 85th percentile speeds of 34.6 mph.
CD1.35_-_Design_and_Access_Statement.pdf (p. 38):
“The proposed access drawing includes 2.4m x 43m visibility splays to accord with Manual”
CD1.14_-_Transport_Assessment.pdf (p. 106):
“85th %ile (ALL) 34.6”
Remediation: Recalculate Stopping Sight Distance along the A323 Guildford Road using the recorded 85th percentile speeds (34.6 mph WB / 34.4 mph EB) and update the unreserved site access junction drawing to demonstrate achievable visibility splays (c. 2.4m x 53m–59m) within adopted highway land or applicant control.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Geo-Environmental GQRA Screened Only for 'Residential Without Home-Grown Produce' vs. Scheme Proposing Private Gardens, Houses, Bungalows, and Self-Build Plots
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-003
The Phase 1 & Phase 2 Geo-Environmental Report (CD1.17, p.45) screened all 15 soil samples strictly against Generic Assessment Criteria (GAC) for a 'residential without home grown produce' land-use scenario, on the basis of which the Planning Statement (CD1.03, p.49) claims no soil contamination risk to human health exists. However, the Planning Statement (CD1.03, p.7) and Design and Access Statement (CD1.35, p.44) propose 1- to 5-bedroom detached, semi-detached, and terraced houses, 3-bedroom bungalows, and self-build plots with private domestic gardens (where rainwater butts are promoted for garden re-use in CD2.04, p.6), which mandatorily require screening against the more stringent 'Residential with home-grown produce' CLEA/S4UL thresholds.
Statutory Impact: Guildford Borough Council Environmental Health Officer (Contaminated Land) cannot validate the human health conclusion of 'no soil contamination risk' under NPPF paragraph 196 because an unconservative conceptual site model (omitting vegetable uptake pathways in private gardens) was used.
CD1.17_-_Phase_1_and_Phase_2_Geo-Environmental_and_Geotechnical_Interpretative_Report.pdf (p. 45):
“All made ground results have been compared with the residential without home grown produce GAC. A soil organic matter (SOM) of 1% has been selected to provide the most conservative assessment.”
CD1.03_-_Planning_Statement_(30.10.2025).pdf (p. 7):
“up to 200 residential dwellings including affordable housing and plots of self-build”
Remediation: Re-screen all Phase 2 soil laboratory results in CD1.17 against 'Residential with home-grown produce' S4UL/C4SL assessment criteria and update the Conceptual Site Model and remediation assessment accordingly.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Drainage Strategy Proposes Unlined Upper Attenuation Infiltration Structures vs. Geotech Identifying Heavy Metal Leachate Risk to Controlled Waters in Secondary A Aquifer
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-004
The February 2026 Drainage Strategy Addendum (CD2.04, p.6) proposes unlined attenuation structures in the upper areas of the site drainage system (plus permeable paving infiltration) to allow first-flush rainfall to infiltrate into the ground. However, the Phase 1 & 2 Geo-Environmental Report (CD1.17, p.42 & p.47) establishes that the Windlesham and Bagshot Formations are Secondary A aquifers and that leachate testing in the made ground exceeded controlled waters EQS GAC thresholds for Copper (7 ug/l vs 1 ug/l), Lead (6 ug/l vs 1.2 ug/l), and Zinc (22 ug/l vs 10.9 ug/l) at WS06 (central/western yard) and WS13 (south-western reprofiled made ground up to 2.5m deep). Concentrated surface water infiltration through unlined structures in or adjacent to un-remediated made ground mobilises heavy metal leachate into the Secondary A aquifer.
Statutory Impact: Environment Agency and Lead Local Flood Authority (Surrey County Council) objection under Guildford Local Plan Policy P11 and the Environmental Permitting Regulations due to mobilisation of heavy metal contamination into a Secondary A aquifer without groundwater remediation or impermeably lined SuDS in made ground zones.
CD2.04_-_Shortland_Farm_-_Drainage_Strategy_Addendum_(20_Feb_2026_-_supplementary).pdf (p. 6):
“the provision of unlined attenuation structures within the upper areas of the”
CD1.17_-_Phase_1_and_Phase_2_Geo-Environmental_and_Geotechnical_Interpretative_Report.pdf (p. 47):
“A potential risk to controlled waters has been identified associated with potential leaching of heavy metals within general made ground at the following locations:”
Remediation: Cross-overlay the made ground extent and leachate exceedance hotspots (WS06 and WS10–WS13) onto the Drainage Strategy Plan, prohibit unlined infiltration SuDS within made ground zones unless full source removal is verified, and obtain Environment Agency groundwater risk sign-off.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Ecological Impact Assessment Claims 31 Baseline Trees and 8 Removals vs. Arboricultural Impact Assessment Recording 89 Trees and Removal of TPO Oak T89
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-005
The Statutory Biodiversity Net Gain (BNG) metric in the Ecological Impact Assessment (CD1.07, p.124) models only 31 individual baseline trees on site and assumes removal of 8 trees (T4, T5, T6, T25, T26, T28, T29, T30). In contrast, the BS 5837 Arboricultural Impact Assessment (CD1.16, p.6 & p.9–10) and Design and Access Statement (CD1.35, p.20) record 89 individual trees, 14 tree groups, and 6 hedgerows, and specify removing 6 individual trees (including mature English Oak T89 protected under statutory TPO No. 8/2017), clearing 341.2 m² of group G14, 22.9 m² of G1, 108.4 m² of G2, 62.8 m² of G8 in a TPO belt, and 166m of hedgerows. The EcIA/BNG assessment is based on an entirely different tree numbering schedule and fails to account for the loss of TPO-protected English Oak T89 and group removals.
Statutory Impact: Invalidates the Statutory Biodiversity Metric baseline and post-development habitat unit calculation under the Environment Act 2021, and exposes an unassessed ecological/roosting bat impact on TPO-protected English Oak T89.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 124):
“• The majority of trees apart from T4, T5, T6, T25, T26 T28, T29 and T30.”
CD1.16_-_Arboricultural_Impact_Assessment.pdf (p. 10):
“Based on the proposed Parameters Plan for the residential parcel of the development, it will be necessary to remove four trees of individual distinction and clear an intermittent group of young ornamental planted trees (G14), covering an area of c.341.2m². Among the individual trees identified for removal is T89 (English Oak), which is currently scheduled under TPO No. 8/2017.”
Remediation: Reconcile the EcIA and Statutory Biodiversity Metric (CD1.07) with the BS 5837 Arboricultural Impact Assessment tree schedule and Tree Protection Plan (CD1.16), ensuring TPO tree T89 and all group/hedgerow clearances (G1, G2, G8, G14, H3–H6) are accurately entered into the BNG metric and assessed for bat roost potential.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
Incomplete Annex II Barbastelle Bat Surveys Deferred to Next Year Despite 4.04% Static Calls and 166m Hedgerow / TPO Tree Removals
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-006
The Ecological Impact Assessment (CD1.07, p.61) recorded high activity of Annex II / rarer protected barbastelle bats across the site, accounting for 4.04% of all static detector registrations with peaks of 379 calls in September and 203 calls in October 2025. The Design and Access Statement (CD1.35, p.21) explicitly admits that automated static surveys must continue from April to June of the following year to establish how barbastelle bats utilise the site. Simultaneously, the Arboricultural Impact Assessment (CD1.16, p.10) proposes removing 166m (53.4%) of site hedgerows, breaching the central TPO tree belt (G8) for the main spine road, and removing TPO English Oak T89.
Statutory Impact: Under ODPM Circular 06/2005 (paragraph 99) and the Conservation of Habitats and Species Regulations 2017, surveys for European Protected Species (especially Annex II barbastelle bats) must be completed prior to determination where essential commuting/foraging corridors (53.4% of hedgerows and TPO tree belts) are being severed; deferring baseline spring surveys post-consent is unlawful.
CD1.35_-_Design_and_Access_Statement.pdf (p. 21):
“This will require automated static surveys to continue from April to June”
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 61):
“Overall, barbastelle registrations on the automated statics consisted of a total of 4.04% registrations.”
Remediation: Complete the April–June automated static and transect bat surveys for barbastelle bats prior to application determination and submit an updated EcIA demonstrating that the parameter plan road breach and 166m hedgerow removal do not sever a core barbastelle commuting or foraging corridor.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
FRA, Planning Statement, and Energy Statement Claim 1-in-100yr + 45% Climate Change Attenuation vs. Drainage Strategy Sizing Basin Only for +40% Climate Change
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-007
The Flood Risk Assessment (CD1.10, p.24), FRA Modelling Report (CD1.11, p.12), and Energy and Sustainability Statement (CD1.21, p.35) explicitly establish that because the site straddles into the Wey and tributaries Management Catchment and has a >100-year residential lifetime, the required Environment Agency 2070s Upper End peak rainfall climate change allowance for the 1-in-100-year storm event is +45%, and assert that SuDS storage is sized for 1-in-100-year + 45% CC. However, both the original Drainage Strategy (CD1.12, p.59) and the Amended Drainage Strategy (CD2.05, p.59) size the southern detention basin (effective volume ~4,656 m³ against a 4,024–4,685 m³ requirement) using only a +40% climate change allowance (100YR+40%CC+10%UB). Furthermore, even at +40% CC, the provided 4,656 m³ basin is 29 m³ short of the upper estimate of 4,685 m³.
Statutory Impact: Surrey County Council (Lead Local Flood Authority) holding objection under NPPF paragraph 181 and PPG Flood Risk guidance because the surface water attenuation basin is under-sized against the mandatory +45% Upper End peak rainfall climate change allowance for the Wey Management Catchment.
CD1.21_-_Energy_and_Sustainability_Statement_(29.10.25).pdf (p. 35):
“associated with a 1 in 100 year storm event, plus a 45% allowance for the impacts of climate”
CD2.05_-_Shortland_Farm_-_Amended_Drainage_Strategy_(20_Feb_2026_supplementary).pdf (p. 59):
“STORAGE ESTIMATE (100YR+40%CC + 10%UB) : 4024m3 - 4685m3”
Remediation: Re-run the Causeway Flow attenuation storage calculations in CD2.05 using the +45% climate change allowance (plus 10% urban creep) and enlarge the southern attenuation basin or add upstream storage volume to accommodate the full 1-in-100-year + 45% CC storm volume.
SHOWSTOPPER
AI Verified: TRUE_CONTRADICTION
FRA Claims All Dwellings Outside Flood Extents vs. Modelling Report Excluding Southern Watercourse Fluvial Risk and Drainage Basin Set at Bed Level (75.25–75.90 mAOD)
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-008
The Flood Risk Assessment (CD1.10, p.36) and Design and Access Statement (CD1.35, p.24) claim that all proposed residential dwellings and infrastructure sit outside all modelled flood extents up to the 1-in-100-year + 45% CC and 1-in-1000-year events. However, the companion FRA Modelling Report (CD1.11, p.6, p.15, p.17) discloses that no channel or culvert survey was undertaken for the 2.75 km² catchment unnamed Ordinary Watercourse along the southern boundary, that Table 5 maximum flood depths explicitly exclude the southern region adjacent to the watercourse, and that a dedicated fluvial assessment supported by survey data is required to quantify this risk. Meanwhile, the Topographical Survey (CD1.06, p.2) records watercourse bed levels at 75.15–75.44 mAOD (banks ~75.95 mAOD), and the Amended Drainage Strategy (CD2.05, p.11 & p.59) places the attenuation basin base at 75.90 mAOD with an outfall at 75.25 mAOD while deferring surcharged outfall modelling despite the FRA showing 1.25–2.00 ('Danger to Most') flood hazard in the ditch.
Statutory Impact: Lead Local Flood Authority (Surrey County Council) holding objection: without surveyed channel/culvert fluvial modelling of the 2.75 km² southern watercourse and surcharged outfall testing, it is unproven that the southern attenuation basin (base 75.90 mAOD, outfall 75.25 mAOD vs ditch bed 75.15–75.44 mAOD) can discharge at 12.70 l/s without backwater flooding into the basin.
CD1.10_-_Flood_Risk_Assessment_(30.10.2025).pdf (p. 36):
“located outside of all the modelled return periods 1 in 30, 1 in 30 + CC, 1 in 100, 1 in”
CD1.11_-_Flood_Risk_Assessment_Modelling_Report.pdf (p. 6):
“Flood risk associated with the
unnamed Ordinary Watercourse to the south was represented in the model for completeness
but would require a fluvial assessment supported by survey data to better understand and
quantify this risk.”
Remediation: Undertake a full channel and downstream structure survey of the southern ordinary watercourse, complete the fluvial flood model recommended in CD1.11 p.6, and model the southern attenuation basin and Hydro-Brake outfall under 1-in-100-year + 45% CC surcharged water levels.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Foul Sewer Connection Contradiction: Utilities Statement Routes Rising Main East vs. Drainage Strategy Pumping North to Guildford Road MH 5101 Across TPO Belt
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-009
The Utilities Statement (CD1.13, p.5) states that the southern Wastewater Pumping Station will pump via a rising main connecting to the existing sewer network east of the site, while simultaneously admitting that no Wastewater Pre-Development Enquiry (PDE) has been submitted to Thames Water to confirm capacity in the existing 150mm foul sewer. Conversely, the Planning Statement (CD1.03, p.42) and Amended Drainage Strategy (CD2.05, p.24) route the pumped rising main (at 9.25 l/s peak flow) uphill from the southern low point (~76.0 mAOD) all the way to the northern boundary at MH 5101 on Guildford Road (~84.3 mAOD), which requires trenching across the central TPO No. 8/2017 tree belt where the Arboricultural Impact Assessment (CD1.16, p.10 & p.13) has not assessed utility trench excavation through Root Protection Areas.
Statutory Impact: Thames Water and LPA Arboricultural Officer consultation conflict: unconfirmed hydraulic capacity in a 150mm sewer for a 9.25 l/s pumped discharge in a postcode (GU12) with 37 historical sewer flood records (CD1.10, p.31), combined with unassessed rising main trenching through a statutory TPO tree belt.
CD1.13_-_Utilities_Statement.pdf (p. 5):
“The proposed preliminary drainage strategy is to be completed by others however; it is anticipated that due to the topography of the site it is assumed that the site will require at least 1 No. Wastewater Pumping Station at the low point of the site the position of this will be established by the drainage consultants with the installation of a rising main connecting to the existing sewer network east of the site.”
CD1.03_-_Planning_Statement_(30.10.2025).pdf (p. 42):
“preferred point of connection would be existing MH 5101 on Guildford Road.”
Remediation: Submit a formal Pre-Development Enquiry to Thames Water to confirm whether the 150mm foul sewer at MH 5101 on Guildford Road can accept 9.25 l/s pumped flow, reconcile the rising main route between CD1.13 and CD2.05, and plot the rising main corridor on the Tree Protection Plan (CD1.16) to avoid TPO Root Protection Areas.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Green Belt Technical Note Claims 10.24 ha of Connected Open Spaces vs. Parameter Plan Allocating 5.23 ha Development and 5.01 ha Open Space
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-010
In assessing visual and spatial openness and compensatory improvements in the Metropolitan Green Belt / Grey Belt, the Green Belt Technical Note (CD1.05, p.17) claims that the development delivers 10.24 ha of connected open spaces within the urban form and on the new settlement edge. However, 10.24 ha (or 10.18–10.19 ha per the Site Location Plan CD1.23, p.1) is the entire gross area of the application site; the Land Use Parameter Plan reported in the Design and Access Statement (CD1.35, p.39) and Planning Statement (CD1.03, p.14) allocates 5.23 ha (51.07%) to built residential development and only 5.01 ha (48.93%) to open space. Additionally, the Geo-Environmental Report (CD1.17, p.9) assumes an 8 ha development footprint on an 11 ha site, while the Travel Plan (CD1.15, p.14) claims a 28-acre (11.33 ha) site.
Statutory Impact: Material factual misrepresentation of the open space quantum (10.24 ha claimed vs 5.01 ha actual) in the Green Belt openness and NPPF paragraph 155–157 Golden Rules evidence base, risking legal challenge to the officer's committee report.
CD1.05_-_Green_Belt_Technical_Note_Shortlands_Farm_271025.pdf (p. 17):
“The delivery of connected open spaces within the urban form and on the new settlement edge (10.24 ha).”
CD1.35_-_Design_and_Access_Statement.pdf (p. 39):
“‚ Development area - 5.23ha (51.07%)”
Remediation: Correct Paragraph/Section 6 of the Green Belt Technical Note (CD1.05, p.17) to reflect 5.01 ha of open space (48.93% of the site) rather than 10.24 ha, and harmonise the gross red-line site area across all reports to match the 10.19 ha on Site Location Plan 25019-S101B.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Lighting Statement Specifies >3,000K White Light and Lit Access/PRoW Crossing vs. Bat Dark Corridor & <2700K Ecological Requirement
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-011
The Lighting Statement (CD1.22, p.7 & p.9) designates the PRoW and dry stream/ditch corridors as priority dark corridors for bats (including Annex II barbastelle recorded in CD1.07, p.61) yet contains two direct engineering contradictions: (1) it specifies a colour temperature of '>3,000 kelvin (2700K preferred)', where '>3,000 kelvin' permits high-blue-wavelength cool white light harmful to light-sensitive barbastelle and myotis bats (directly opposite to ILP GN08/23 requirement of <2,700K); and (2) the main vehicular site access road permanently breaches the east-west PRoW / dark corridor (CD1.04, p.24; CD1.22, p.9), requiring BS 5489-1 / BS 13201 conflict-area street lighting (2.0 to 15.0 lux maintained, CD1.22, p.7) directly across the dark corridor without any quantitative lux contour modelling or upper lux cap (e.g. <0.5 lux).
Statutory Impact: County Ecologist holding objection due to absence of quantitative lux limits (<0.5 lux) on Annex II barbastelle commuting corridors, a defective '>3,000K' luminaire specification, and an unmitigated lit highway breach across the primary east-west dark corridor.
CD1.22_-_Lighting_Statement-P03.pdf (p. 9):
“Avoidance of white and blue wavelengths of the light spectrum to reduce insect attraction and where white light sources are installed in order to manage the blue short wavelength content they will be of a warm / neutral colour temperature >3,000 kelvin (2700K preferred).”
CD1.04_-_Landscape_and_Visual_Imapct_Assessment.pdf (p. 24):
“Footpath 357 will have a permanent breach in the alignment across the Site access. Whilst the route will continue people will need to cross the junction.”
Remediation: Amend CD1.22 p.9 to mandate a strict maximum colour temperature of <=2,700K (correcting '>3,000 kelvin'), define a quantitative maximum vertical/horizontal illuminance limit (<0.5 lux) along the retained bat corridors and Tree T1, and demonstrate how the access road crossing of the PRoW/tree belt maintains a dark commuting hop-over.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Desktop-Only Noise Note With Zero Monitoring vs. Passive Open-Window Overheating Strategy, 100% ASHP Installations, and 952 AADT Traffic on A323
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-012
The Noise Assessment (CD1.18, p.2–3) is a 2-page desktop review of satellite imagery containing zero baseline noise monitoring, zero traffic flow inputs, and zero acoustic modelling, assuming that a ~70m setback from the A323 Guildford Road and ~30m from Totterdown Preschool removes any need for acoustic assessment. However, the Energy and Sustainability Statement (CD1.21, p.20 & p.34) commits 100% of the 200 dwellings to external Air Source Heat Pumps (ASHPs) and relies exclusively on passive natural ventilation via openable windows under Approved Document O / CIBSE TM59 to prevent overheating, while the Utilities Statement (CD1.13, p.10) adds at least one 1MVA HV substation on site and the Air Quality/Transport Assessments (CD1.19, p.15; CD1.14, p.106) confirm high traffic flows and 34.6 mph 85th percentile speeds on the A323 plus railway proximity to the south-west (CD1.08, p.20). Under Approved Document O and BS 8233, open-window overheating strategies cannot be validated without empirical night-time LAeq and LAmax noise survey data.
Statutory Impact: Environmental Health Officer objection: a desktop satellite review does not satisfy ProPG: Planning & Noise, BS 8233:2014, or BS 4142:2014+A1:2019 to establish that the residential parcel parameter envelope can rely on open windows for Part O overheating mitigation or accommodate 200 external ASHPs and a 1MVA substation.
CD1.18_-_Noise_Assessment.pdf (p. 2):
“Based on a desktop review of satellite imagery of the area, and details for the surrounding roads and nursery,”
CD1.21_-_Energy_and_Sustainability_Statement_(29.10.25).pdf (p. 34):
“Acceptable strategies for reducing overheating risk described in Approved Document O focus on”
Remediation: Conduct a baseline environmental noise survey (measuring daytime and night-time road, rail, and nursery noise levels across the residential parcel boundary) and submit an acoustic assessment verifying BS 8233 open-window feasibility and cumulative ASHP/substation noise compliance under BS 4142.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Soil Contamination Screened Against 'Residential Without Home Grown Produce' GAC Despite Proposed Family Houses and Self-Build Plots
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-013
Document B (Planning Statement) specifies that the development will comprise up to 200 dwellings including terraced, semi-detached, and detached 1 to 4-bedroom homes, self-build plots, and 'predominantly two-storey single-family houses' with private gardens. Under UK Land Contamination Risk Management (LCRM) and CLEA guidance, residential dwellings with private gardens must be assessed against the stringent 'residential with home-grown produce' Generic Assessment Criteria (GAC) to account for the vegetable uptake exposure pathway. However, while Document A states in Section 9.3.1 (page 44) that concentrations were compared against 'residential with home-grown produce', Sections 9.3.1.1 and 9.3.1.2 (page 45) explicitly confirm that both Data set 1 (Made ground) and Data set 2 (Natural soils) were actually screened against the less stringent 'residential without home grown produce GAC' (which is only valid for apartments or developments with communal landscaped grounds and no private domestic gardens).
Statutory Impact: Guildford Borough Council's Environmental Health / Contaminated Land Officer is likely to raise a technical objection or query the validity of the Generic Quantitative Risk Assessment (GQRA) in Document A. Relying on 'without home grown produce' screening criteria for a scheme dominated by family houses with gardens leaves the plant uptake human health exposure pathway unassessed, requiring re-screening or a pre-commencement contaminated land condition before the site can be deemed suitable for its proposed use under NPPF Paragraph 189/190.
CD1.17_-_Phase_1_and_Phase_2_Geo-Environmental_and_Geotechnical_Interpretative_Report.pdf (p. 45):
“9.3.1.1 Data set 1 – Made ground: All made ground results have been compared with the residential without home grown produce GAC. ... 9.3.1.2 Data set 2 – Natural soils: All natural soil results, inclusive of both topsoil and subsoil materials, have been compared with the residential without home grown produce GAC.”
CD1.03_-_Planning_Statement_(30.10.2025).pdf (p. 14):
“Most of the residential development zone has a maximum of 2 storeys whereby the proposed housing typologies will comprise predominantly two-storey single-family houses in keeping with this character.”
Remediation: Instruct the geo-environmental consultant (RSK) to clarify the discrepancy between Section 9.3.1 and Sections 9.3.1.1/9.3.1.2, and re-run the Appendix M soil screening spreadsheets for both Made Ground and Natural Soils against the 'residential with home-grown produce' GAC (at 1% SOM). Issue an addendum letter confirming whether any chemical determinands exceed the stricter 'with home-grown produce' thresholds and whether clean cover or remediation is required in private garden areas.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Soil Contamination Screened Against 'Residential Without Home Grown Produce' GAC Despite Proposed Houses with Private Back Gardens
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-014
In Document A, although Section 9.3.1 initially mentions 'residential with home-grown produce land use based on 1% soil organic matter in Appendix L', the actual dataset screening assessments for both Data set 1 (Made ground, Section 9.3.1.1) and Data set 2 (Natural soils, Section 9.3.1.2) explicitly evaluate soil test results against 'residential without home grown produce GAC'. Conversely, Document B (and Document A's own geotechnical assumption of 'traditional low-rise dwellings only' on page 63) proposes up to 200 low-rise residential dwellings (including self-build plots) with private back/rear gardens (and conforms to LPDMP Policy D5 requiring all homes to be provided with private amenity space, page 29). Under Environment Agency LCRM and CLEA guidance, houses with private rear gardens must be screened against the more stringent 'residential with home-grown produce' Generic Assessment Criteria (GAC) because residents can grow and consume vegetables in private gardens.
Statutory Impact: The Council's Environmental Health / Contaminated Land Officer cannot rely on a Generic Quantitative Risk Assessment (GQRA) that screens made ground (including former nursery, piggery, and equestrian fill up to 2.5m deep) and natural soils against 'without home grown produce' thresholds when private domestic gardens are proposed. This will trigger a formal request for clarification or a re-screened GQRA/remediation condition prior to determination.
CD1.17_-_Phase_1_and_Phase_2_Geo-Environmental_and_Geotechnical_Interpretative_Report.pdf (p. 45):
“9.3.1.1 Data set 1 – Made ground: All made ground results have been compared with the residential without home grown produce GAC. ... 9.3.1.2 Data set 2 – Natural soils: All natural soil results, inclusive of both topsoil and subsoil materials, have been compared with the residential without home grown produce GAC.”
CD1.35_-_Design_and_Access_Statement.pdf (p. 49):
“Cycle parking will be provided within garages or garden sheds/cycle stores in back gardens. ... The refuse provision will be primarily in the form of bins kept in rear gardens with rear access or within garages.”
Remediation: Reconcile Section 9.3.1 of the Geo-Environmental Report and Appendix M to confirm whether the laboratory soil results were actually screened against 'residential with home-grown produce' GAC. If 'without home grown produce' GAC was used in the screening spreadsheets, re-run the Tier 2 GQRA against 'residential with home-grown produce' GAC (1% SOM) and issue a technical addendum confirming whether any exceedances occur.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Unlined Steep-Sided Dry Detention Basin vs. Permanent Wetland Aquatic Breeding Habitat & BNG Condition Assumptions
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-015
Document A (Drainage Strategy, Section 2.13, 2.15 and Appendix F Drawing CIV001-A03 on page 59) explicitly designs a single, typically dry, unlined/partially infiltrating detention basin ('ATTENUATION BASIN CIRCA 1.35m DEEP (1.05m WATER DEPTH + 300mm FREEBOARD) 1 IN 3 SIDE SLOPE') that drains down via a Hydro-Brake and relies on partial infiltration into the underlying Bagshot Sand where groundwater is 2-4m bgl. Conversely, Document B (EcIA & BNG Report, Section 6.2) claims 'a number of attenuation basins' will provide 'wetland habitat' supporting invertebrate populations 'that require water for their breeding cycle', and relies on these SuDS features achieving 'moderate condition' in the Statutory Biodiversity Metric. An unlined dry detention basin with steep 1:3 side slopes and rapid drawdown cannot sustain permanent or semi-permanent standing water required for aquatic invertebrate breeding cycles, nor can 1:3 slopes support the shallow marginal wetland planting zones required to pass the Statutory Biodiversity Metric condition assessment for sustainable drainage or wetland habitats.
Statutory Impact: Risk of objection from the Local Planning Authority Ecology Officer and Lead Local Flood Authority (Surrey County Council) due to double-counting incompatible engineering and ecological functions within the same footprint. If the basin is re-profiled to shallow wetland slopes (e.g., 1:5 to 1:10) and lined to retain a permanent wetland pool for BNG compliance, the active attenuation storage volume (4,656 m3) will be significantly reduced, requiring a larger land take that encroaches into either the developable residential area or surrounding BNG grassland habitats.
CD2.05_-_Shortland_Farm_-_Amended_Drainage_Strategy_(20_Feb_2026_supplementary).pdf (p. 11):
“2.13. The proposed attenuation basin will be a vegetated area that are typically dry and designed to retain runoff and discharge via a flow control device limited to the agreed discharge rate. ... 2.15. The basin could be designed with 1 in 3 side slopes in line with current guidance on attenuation basins for safety and maintenance purposes”
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 18):
“A number of attenuation basins will also be included, providing further wetland habitat within the Site. While these will serve a drainage feature, they will be designed to accommodate a diverse range of planting in order to target moderate condition, this will support additional invertebrate population that require water for their breeding cycle, thus promoting more ecological value and prey items.”
Remediation: Reconcile the Surface Water Drainage Strategy and the EcIA/BNG Metric prior to Reserved Matters / Biodiversity Gain Plan submission. Either: (1) redesign and enlarge the attenuation basin footprint to incorporate an impermeable liner, a permanent micropool/wetland bench, and shallow marginal slopes (1:5 or shallower) while maintaining the required 4,656 m3 active flood storage above the permanent water level; or (2) update the EcIA and BNG Metric to classify the basin as a dry grassland detention feature and secure the resulting biodiversity unit shortfall via the proposed off-site habitat unit allocation.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Dry Detention Basin with 1:3 Slopes vs. Permanent Wetland / Aquatic Invertebrate Breeding Habitat for BNG
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-016
Document A (Drainage Strategy, p. 11 & p. 59) designs a single large attenuation basin (4,656 m3, 1.35m deep with 1 in 3 side slopes) explicitly specified as a 'typically dry' vegetated detention basin with partial infiltration where feasible. Conversely, Document B (EcIA / BNG Assessment, p. 18) claims 'a number of attenuation basins' will provide 'wetland habitat' supporting invertebrate populations 'that require water for their breeding cycle', and scores these SuDS features in the Statutory Biodiversity Metric at 'Moderate' condition. A dry detention basin with steep 1:3 slopes that drains down after storm events cannot sustain permanent or semi-permanent standing water required for aquatic invertebrate breeding cycles, nor can 1:3 slopes support the shallow marginal drawdown zones required to achieve 'Moderate' condition for SuDS/wetland habitats under the Statutory Biodiversity Metric.
Statutory Impact: Risk of objection from the Lead Local Flood Authority (Surrey County Council) and the Local Planning Authority Ecological Consultee regarding conflicting SuDS design parameters and unachievable on-site BNG habitat condition targets. Re-profiling the basin to provide shallow wetland margins (e.g., 1:5 to 1:10 slopes) and a permanent wet pool reduces effective hydraulic storage volume, requiring a larger land take that may encroach into proposed residential parcels or SANG/open space.
CD1.12_-_Drainage_Strategy.pdf (p. 11):
“2.13. The proposed attenuation basin will be a vegetated area that are typically dry and designed to retain runoff and discharge via a flow control device limited to the agreed discharge rate... 2.15. The basin could be designed with 1 in 3 side slopes in line with current guidance on attenuation basins for safety and maintenance purposes”
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 18):
“A number of attenuation basins will also be included, providing further wetland habitat within the Site. While these will serve a drainage feature, they will be designed to accommodate a diverse range of planting in order to target moderate condition, this will support additional invertebrate population that require water for their breeding cycle, thus promoting more ecological value and prey items.”
Remediation: Reconcile the Drainage Strategy and EcIA/BNG Metric at Reserved Matters / detailed design by either: (1) redesigning the attenuation basin in Document A to include a permanently lined micro-pool / wetland bench with shallower side slopes (1:5 or shallower) while recalculating the earthworks footprint to ensure the 4,656 m3 active attenuation volume is maintained above the permanent water level; or (2) revising the BNG Metric in Document B to classify the basin floor as 'Other neutral grassland' / dry detention feature rather than a wetland habitat, and securing any resulting BNG unit shortfall via the proposed off-site habitat unit allocation.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Foul Rising Main Connection Point and Pre-Development Enquiry Status Contradiction (North Guildford Road MH 5101 vs East Sewer Network)
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-017
There is a direct engineering and spatial conflict between the two submitted strategies regarding the foul rising main routing, point of connection, and utility consultation status. Document A (Amended Drainage Strategy) confirms that a Pre-Development Enquiry was completed with Thames Water (dated 23 September 2025, Appendix E) establishing the preferred point of connection at existing Manhole 5101 on Guildford Road (to the north of the site), and notes that peak flow rates are based on 4000 l/dwelling/day (0.05 l/s/dwelling) without completing the final discharge rate calculation. Conversely, Document B (Utilities Planning Statement, Issue 02 dated 27 October 2025—over a month after the Thames Water response) states that no Pre-Development Enquiry has been made, defers the drainage strategy to others, and specifies a rising main connecting to the existing sewer network to the east of the site rather than Guildford Road to the north.
Statutory Impact: Inconsistent foul drainage routing and uncoordinated utility capacity statements across the application pack create ambiguity regarding off-site trenching works, s278 highway works (Guildford Road to the north vs Wyke Lane/eastern network), and whether Thames Water has actually assessed network capacity for the pumped discharge rate (up to 200 dwellings = 10 l/s peak gravity equivalent, or specific pumped rising main discharge rate). This routinely triggers a request for clarification or a holding objection/Grampian condition from Thames Water and the Local Planning Authority.
CD2.05_-_Shortland_Farm_-_Amended_Drainage_Strategy_(20_Feb_2026_supplementary).pdf (p. 23):
“5.1. Foul drainage for the residential development is proposed to connect into the existing Thames Water public sewer network via a pump station... 5.4. An enquiry has been submitted to Thames Water, to determine the point of connection. Thames Water confirmed their preferred point of connection would be existing MH 5101 on Guildford Road, their correspondence is contained in Appendix E.”
CD1.13_-_Utilities_Statement.pdf (p. 5):
“The proposed preliminary drainage strategy is to be completed by others however; it is anticipated that due to the topography of the site it is assumed that the site will require at least 1 No. Wastewater Pumping Station at the low point of the site the position of this will be established by the drainage consultants with the installation of a rising main connecting to the existing sewer network east of the site... confirmation of capacity availability for the expected discharge volume and the requirement of any necessary network improvements will not be determined until a formal application for a wastewater Pre-Development enquiry is made.”
Remediation: Update the Utilities Planning Statement (Document B) to align with the Drainage Strategy (Document A) by incorporating the September 2025 Thames Water connection enquiry response for MH 5101 on Guildford Road (north of the site), removing the conflicting reference to an eastern sewer network connection, and explicitly confirming the pumped discharge rate (l/s) from the Type 3 Pump Station with Thames Water to verify whether off-site network reinforcement is required.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Foul Drainage Connection Point, Enquiry Status, and Sewer Classification Discrepancy
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-018
There is an operational and engineering disconnect between the two reports regarding the foul drainage connection and consultation status. Document A (Drainage Strategy) confirms that an enquiry has already been completed with Thames Water (dated September 2025) and establishes the connection point to the north at MH 5101 on Guildford Road via a Type 3 pump station and rising main (additionally, Document A's Drainage Layout Plan on page 59 labels the receiving apparatus in the legend as 'EXISTING THAMES WATER COMBINED SEWER', contradicting its own text on page 10 which states 'There are no public combined water sewers located within the vicinity of the site'). Conversely, Document B (Utilities Planning Statement, Issue 02 dated 27 October 2025) states that the preliminary drainage strategy is 'to be completed by others', assumes the rising main will connect to the existing sewer network 'east of the site' rather than north to Guildford Road, and asserts that no Pre-Development enquiry has been made to confirm network capacity for the 150mm public foul sewer.
Statutory Impact: Inconsistent connection locations (north on Guildford Road vs. east of the site) and unverified capacity in the receiving 150mm diameter public foul sewer for a pumped rising main serving 200 dwellings (peak flow ~10 l/s per DCG Option B) creates ambiguity for Thames Water Utilities Limited (TWUL) and the Local Planning Authority. Typically, a 150mm gravity sewer requires formal capacity modelling to accept pumped rising main flows from 200 dwellings, which is likely to trigger a request from Thames Water for a Grampian pre-commencement / pre-occupation planning condition requiring network capacity confirmation or reinforcement.
CD1.12_-_Drainage_Strategy.pdf (p. 23):
“Foul drainage for the residential development is proposed to connect into the existing Thames Water public sewer network via a pump station... An enquiry has been submitted to Thames Water, to determine the point of connection. Thames Water confirmed their preferred point of connection would be existing MH 5101 on Guildford Road, their correspondence is contained in Appendix E.”
CD1.13_-_Utilities_Statement.pdf (p. 5):
“The proposed preliminary drainage strategy is to be completed by others however; it is anticipated that due to the topography of the site it is assumed that the site will require at least 1 No. Wastewater Pumping Station at the low point of the site the position of this will be established by the drainage consultants with the installation of a rising main connecting to the existing sewer network east of the site. Due to the size of the existing infrastructure in proximity of the development we anticipated these to be sized sufficient for the proposed development however, confirmation of capacity availability for the expected discharge volume and the requirement of any necessary network improvements will not be determined until a formal application for a wastewater Pre-Development enquiry is made.”
Remediation: Update the Utilities Planning Statement (Document B) to align with the completed Drainage Strategy (Document A), explicitly referencing the confirmed northern connection point at MH 5101 on Guildford Road. Additionally, correct the legend on the Proposed Drainage Strategy Plan (AEG7630-CIV001-A03) to change 'EXISTING THAMES WATER COMBINED SEWER' to 'EXISTING THAMES WATER FOUL SEWER', and explicitly state the calculated peak pumped discharge rate (e.g., 200 dwellings x 0.05 l/s = 10.0 l/s) to support Thames Water capacity verification.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Unreconciled Tree, Hedgerow, and Bat Roost (PRF-M) Reference IDs and Baseline Inventories Across EcIA, BNG, and BS 5837 AIA
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-019
There is a fundamental spatial and taxonomic disconnect between the Ecological Impact Assessment (incorporating the Bat Survey and BNG Report) and the BS 5837 Arboricultural Impact Assessment (AIA):
1. Conflicting Tree IDs & Species for Bat PRF-M Trees: In the EcIA Bat Survey (Page 59), trees assessed for bat roosting potential are designated T1 (English Oak, classified as PRF-M maternity roost potential), T2 (English Oak, PRF-M), and T3 (Ash, FAR). However, in the BS 5837 Tree Schedule (Document B, Page 23), T1, T2, and T3 are all Semi-Mature Sycamores with no ecological subcategory (all rated C12). Because the ecology report uses an unlinked numbering system, it is impossible to verify which BS 5837 trees correspond to the PRF-M English Oaks and Ash tree, or whether any of the six individual trees and four tree groups proposed for removal in the AIA (Page 4) include T2 or T3.
2. Baseline Inventory Mismatch (BNG vs BS 5837): The BNG Report within Document A (Page 123) records a baseline of only 31 individual trees (I1–I31, located mostly along the northern boundary), 11 hedgerows (H1–H11), and 3 lines of trees (L1–L3). In contrast, the BS 5837 AIA (Document B, Page 6) surveys the exact same site and records 89 individual trees (T1–T89), 14 tree groups (G1–G14), and 6 hedgerows (H1–H6). Furthermore, the EcIA states that 'Hedgerows within the centre of the Site associated with the yard and stables [H7-H11] are to be lost, with all other hedgerows to be retained' (Page 63), whereas the AIA (Page 4) proposes the removal of three hedgerows and sections of a fourth from its H1–H6 schedule.
Statutory Impact: Local Planning Authority Ecologists, Natural England, and the Borough Tree Officer cannot cross-reference which specific BS 5837 trees contain the Maternity Potential Roost Features (PRF-M) to verify their retention, root protection areas (RPAs), and dark-corridor lighting buffers under Regulation 43 of the Conservation of Habitats and Species Regulations 2017. Additionally, the discrepancy between 31 individual trees in the Statutory Biodiversity Metric and 89 individual trees (plus 14 groups) in the AIA undermines the validity of the statutory BNG baseline calculation under the Environment Act 2021.
CD1.07_-_Ecological_Impact_Assessment_and_SANG_Statement.pdf (p. 59):
“Table 13: Aerial Assessment Results | Tree Ref. T1 | Species English Oak | PRF PRF-M | PRF Characterisation 10x5cm entrance to a 5x30cm cavity, extending upwards | T2 English Oak PRF-M | T3 Ash FAR”
CD1.16_-_Arboricultural_Impact_Assessment.pdf (p. 23):
“Tree Number 1 | Common Species Name Sycamore | Height (m) 13 | Life Stage Semi Mature... Tree Number 2 | Sycamore... Tree Number 3 | Sycamore”
Remediation: Provide a unified Tree and Hedgerow Reconciliation Schedule cross-referencing the Ecology Bat Survey IDs (T1–T3), the BNG Metric IDs (I1–I31, L1–L3, H1–H11), and the BS 5837 AIA IDs (T1–T89, G1–G14, H1–H6). Update the BS 5837 Tree Schedule and Tree Protection Plan to explicitly flag the PRF-M trees with subcategory '3' (ecological value) and confirm their retention and protection from light spill and RPA encroachment. Reconcile the individual tree and hedgerow counts/losses in the Statutory Biodiversity Metric against the AIA removal schedule.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Unresolved Road Safety Audit Conflicts on Proposed Copenhagen Crossings and Off-Site Pedestrian Route Constraints
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-020
While the Transport Assessment summary concludes that safe sustainable active travel access to Ash Rail Station and local amenities is achieved via off-site improvements to Public Footpath 356 and Guildford Road junctions, the technical body, Pedestrian Route Audit (Appendix A), and Stage 1 Road Safety Audit (Appendix D) reveal critical physical and legal constraints: (1) The Surrey County Council (SCC) requested Copenhagen crossing at Guildford Road / Harpers Road cannot be physically delivered due to insufficient highway land and conflict with an existing pub loading bay; (2) For the main site access and Wyke Lane junctions, the Stage 1 RSA rejected the SCC-requested Copenhagen crossings in favour of conventional give-way markings on the channel line, and the Overseeing Organisation (SCC) sign-off block in the RSA Response Report (page 82) remains blank and unagreed; and (3) The off-site PRoW surface upgrades between the western boundary and Ash Rail Station are constrained by unconfirmed land availability and third-party ownership issues (page 47).
Statutory Impact: Because Access is not a reserved matter (OUTLINE_ACCESS_ONLY), the geometric form of the primary access junction and off-site S278 junction works must be agreed prior to determination. The direct conflict between Surrey County Council's pre-application requirement for Copenhagen crossings and the Stage 1 RSA recommendation for conventional bell-mouth junctions—combined with the unsigned Overseeing Organisation statement—creates an active holding objection risk from the Local Highway Authority under NPPF paragraphs 115–117 and Guildford Local Plan Policy ID3.
CD1.14_-_Transport_Assessment.pdf (p. 33):
“Ash rail station is accessible on foot either via Guildford Road or the PRoW network that passes through the site. The TA proposes improvements to both the pedestrian network and public transport infrastructure to encourage sustainable travel.”
CD1.14_-_Transport_Assessment.pdf (p. 25):
“A contribution to surface improvements to public footpath that runs from the western boundary of the site to Harper Road adjacent to Totterdown preschool and Harpers Recreation Ground. This is subject to land availability and will need to be explored with the SCC PRoW department... A Copenhagen crossing facility at the Guildford Road / Harpers Road junction has been investigated, as requested by SCC in their pre-application response... However, this would require transition ramps that would diminish the footway width / loading bay width given the limited public highway land available and so it is considered that a Copenhagen crossing isn't achievable at this location”
Remediation: 1. Obtain formal written sign-off from Surrey County Council (Overseeing Organisation) on the Stage 1 Road Safety Audit Response Report to confirm whether the primary site access and Wyke Lane junction will utilize a Copenhagen crossing or a conventional bell-mouth priority arrangement.
2. Confirm highways adoption boundaries and third-party land ownership along Public Footpath 356 (Routes 2 and 4) to verify whether all-weather surfacing can be legally delivered via S106/S278.
ATTENTION_REQUIRED
AI Verified: TRUE_CONTRADICTION
Public Footpath (PROW 357) Promoted as a 3-Minute Cycle Route to Ash Station and Susceptible to Surface Water Flooding Without All-Weather Upgrade
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-021
The Planning Statement (Pages 8, 30, and 53) repeatedly claims that a core sustainability and 'Golden Rules' benefit of the site is 'utilising the onsite PROW (and providing surface improvements) to create an exceptionally well connected and sustainable new development which can reach the train station on foot in 8 minutes or cycle in only 3 minutes.' However, cross-examination with the Transport Assessment (Page 33) and the Flood Risk section of the Planning Statement (Page 42) reveals two fundamental physical and regulatory contradictions: (1) The route is a Public Footpath (PROW Footpath 357), which legally accommodates pedestrians only ('accessible on foot either via Guildford Road or the PRoW network') and has no legal right of way for cycling or proposed cycle track conversion Order; and (2) Page 42 of the Planning Statement admits that the PROW is affected by surface water flooding across modelled return periods and will only receive a 'light gravel covering', which neither mitigates flood inundation nor complies with LTN 1/20 all-weather sealed surfacing and width standards for a primary utility cycle corridor.
Statutory Impact: Misrepresenting a flood-prone public footpath with a light gravel surface as a 3-minute utility cycle route to Ash Rail Station undermines the active travel sustainability case under NPPF Paragraph 115/117 and Guildford Local Plan Policy ID3 and Policy ID9. Surrey County Council (Local Highway Authority and PROW team) is likely to object to encouraging illegal cycling on a public footpath and require either a formal cycle track conversion/widening order with sealed all-weather surfacing above flood levels, or the removal of off-road station cycling claims from the sustainability balance.
CD1.14_-_Transport_Assessment.pdf (p. 33):
“Ash rail station is accessible on foot either via Guildford Road or the PRoW network that passes through the site. The TA proposes improvements to both the pedestrian network and public transport infrastructure to encourage sustainable travel. The public footpath that runs through the site will be maintained and improved as part of the development proposals, which will benefit both new residents, existing users and the surrounding community.”
CD1.03_-_Planning_Statement_(30.10.2025).pdf (p. 42):
“The PROW could also be affected by flooding in the modelled return periods, but this reflects the existing situation. It is proposed to introduce a light gravel covering to the PROW to improve the existing user experience. The alternative route to using the PROW is to use the pedestrian links onto the Guildford Road.”
Remediation: Clarify whether PROW Footpath 357 is proposed to be formally upgraded to a shared-use cycle track/bridleway under Section 257/Highways Act powers with LTN 1/20 compliant width (minimum 3.0m shared use) and bound, flood-resilient surfacing. If it remains a pedestrian-only footpath with a light gravel dressing, remove claims from the Planning Statement that the PROW provides a 3-minute cycle route to Ash Station, and assess station cycle accessibility solely via the highway network (Guildford Road).