DoxCheck

v0.2 Hybrid 01_submission_pack
Audited at: 2026-11-21T23:29:02Z
41
Documents Audited
1435
Pages Scanned
24
🔴 Showstoppers
85
🟡 Attention Required
7
⚪ Hygiene Advisory
269
🟢 Suppressed False Positives

1. Canonical Parameter Consistency Matrix

Side-by-side reconciliation of core quantitative parameters across all reports
Parameter & Scope Unit Status Consensus Value Document Claims & Verbatim Evidence
SITE_AREA
RED_LINE_GROSS
ha CONSISTENT
101 ha
3375110-appeal-decision.pdf (p. 11) 3.62 hectares
“on, the scheme has evolved during the appeal process. In addition to the 3.62 hectares (ha) of mitigation land originally included within the application site”
3375110-appeal-decision.pdf (p. 11) 28 ha
“included within the application site boundary, the proposal now includes 28 ha of off-site skylark mitigation land located some 850m to the south west”
3375110-appeal-decision.pdf (p. 11) 23 ha
“organic set- aside. I note that the figures set out above are based on a 23 ha site area whilst the off-site mitigation land is larger at 28 ha. The de”
cd-111-ecological_impact_assessment-1800371.pdf (p. 8) 100 hectares
“1.3.4 The Site is approximately 100 hectares (ha) in size, including the cable route connecting the two parcels. An a”
cd-111-ecological_impact_assessment-1800371.pdf (p. 68) 81.5ha
“Farm, Bunny Hill, Costock, Nottinghamshire). This site is approximately 81.5ha in size and sits directly adjacent to the Development to the west. The E”
cd-111-ecological_impact_assessment-1800371.pdf (p. 69) 48ha
“within this application site lies 10km north-east, covers approximately 48ha and would provide approximately 20mw of energy. No ecology reports are a”
cd-117-flood_risk_assessment_and_drainage_strategy-1799492.pdf (p. 4) 101ha
“nt would introduce a more vulnerable use. 1.4. The site is approximately 101ha in area. The vast majority of the site is located in Flood Zone 1, at lo”
cd-12-planning-statement-jan-2024.pdf (p. 101) 101ha
“age pipe would be re-filled. Summary 7.285. The site is approximately 101ha in area is currently entirely greenfield and predominately used for arab”
DWELLING_COUNT_TOTAL
PROPOSED_DEVELOPMENT
dwellings CONSISTENT
96
cd-11-app-form.pdf (p. 3) 96 Unit
“TED ****** Site Area What is the measurement of the site area? (numeric characters only). 100.96 Unit Hectares Description of the Proposal Please note in regard to: Fire Statements - From 1 A”
cd-38-old-wood-energypark_ecia_v70.pdf (p. 76) 44 units
“his will result in a gain of 159.14 Habitat Units, or an overall net gain of 73.69% (previously 168.44 units and 81.94% gain). The proposal will result in a gain of 43.93 Hedgerow Units, or an overall net gai”
cd-764-gladman-lancaster-flood-risk-150126.pdf (p. 5) 761 dwellings
“b. At DL88 she finds the LPA has a housing land supply of only 2.4 years, with a shortfall of 761 dwellings. The proposed development would deliver up to 451 new market homes;”
GIA_TOTAL_SQM
PROPOSED_DEVELOPMENT
m² CONSISTENT
280.0
cd-764-gladman-lancaster-flood-risk-150126.pdf (p. 3) 280sq m
“to 644 dwellings (Use Class C3), a local centre (Use Class E) of no more than 280sq m internal floorspace, a community hall (Use Class F2) of no more than 150sq m”
cd-764-gladman-lancaster-flood-risk-150126.pdf (p. 3) 150sq m
“280sq m internal floorspace, a community hall (Use Class F2) of no more than 150sq m internal floorspace, public open spaces including equipped children’s play ar”
CLIMATE_CHANGE_ALLOWANCE_PCT
1_IN_100_YR_RAINFALL
% CONSISTENT
40
cd-117-flood_risk_assessment_and_drainage_strategy-1799492.pdf (p. 27) 1 in 100 yr +40% CC
“e and has been designed to manage flows for all storm events up to and including the 1 in 100 year event plus 40% allowance for climate change. The proposed attenuation basin is located in Flood Zon”
BNG_HEADLINE_METRICS
ON_SITE_HABITAT_UNITS
% CONTRADICTION
122.35
3375110-appeal-decision.pdf (p. 16) +73.69% Habitat Units
“statutory Biodiversity Metric calculation. Overall, it would result in a net gain of 73.69% in habitat units, 60.77% in hedgerow units and 14.40% in watercourse units. This is a benefit of the”
cd-111-ecological_impact_assessment-1800371.pdf (p. 68) +122.35% Habitat Units
“using the Natural England Biodiversity Metric 3.1, the development would result in a habitat unit ga in of 122.35% and a hedgerow unit gain of 33.75% due to the seeding of species-rich meadow grassla”
cd-12-planning-statement-jan-2024.pdf (p. 40) +62.34% Habitat Units
“will result in a substantial biodiversity net gain including a net gain of 80.65% of habitat units and 62.34% of hedgerow units. It is recommended that if the Council are minded to approve the a”
cd-12-planning-statement-jan-2024.pdf (p. 92) +80.65% Habitat Units
“d landscape and ecological enhancements across the site, would deliver a net gain of 80.65% in Habitat Units and a net gain of 62.34% in hedgerow units across the Site. 7.207. Due to the additi”
cd-217-ecia-oct-2024.pdf (p. 67) +122.35% Habitat Units
“using the Natural England Biodiversity Metric 3.1, the development would result in a habitat unit gain of 122.35% and a hedgerow unit gain of 33.75% due to the seeding of species-rich meadow grassla”
cd-24-planning-statement-pt-1-feb-25.pdf (p. 40) +62.34% Habitat Units
“will result in a substantial biodiversity net gain including a net gain of 80.65% of habitat units and 62.34% of hedgerow units. It is recommended that if the Council are minded to approve the a”
cd-24-planning-statement-pt-1-feb-25.pdf (p. 92) +80.65% Habitat Units
“d landscape and ecological enhancements across the site, would deliver a net gain of 80.65% in Habitat Units and a net gain of 62.34% in hedgerow units across the Site. 7.207. Due to the additi”
cd-38-old-wood-energypark_ecia_v70.pdf (p. 74) +122.35% Habitat Units
“using the Natural England Biodiversity Metric 3.1, the development would result in a habitat unit gain of 122.35% and a hedgerow unit gain of 33.75% due to the seeding of species-rich meadow grassla”

2. Drawing Register Reconciliation Table

Audit of Issue Sheets / Document Registers vs Drawing Title Blocks and Timestamps
Expected Drawing Number Status Document Register Entry Actual Title Block Entry

3. Detailed Defect Findings & Hygiene Audit Log

Full defect inventory with three-tier planning risk classification and verbatim citations
ATTENTION_REQUIRED Internal CDE / drive path printed in margin of 'cd-116-transport_assessment_part_1-1799494.pdf' (Page 25)
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_07-25-01
Page 25 border contains the internal network/BIM path: 'C:\Users\droddy\Motion\StaffSite'.
cd-116-transport_assessment_part_1-1799494.pdf (p. 25): “C:\Users\droddy\Motion\StaffSite - TP Projects\exwysa 2303076\Drawings\2303076 - TK03A 16.5m SPA Proposed Access N Parcel.dwg”
Remediation: Turn off CAD/Revit plot stamp path display or sanitize before client submission.
ATTENTION_REQUIRED Internal CDE / drive path printed in margin of 'cd-116-transport_assessment_part_1-1799494.pdf' (Page 29)
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_07-29-02
Page 29 border contains the internal network/BIM path: 'C:\Users\andrewnock\Motion\StaffSite'.
cd-116-transport_assessment_part_1-1799494.pdf (p. 29): “C:\Users\andrewnock\Motion\StaffSite - Exwysa 2303076\Drawings\2303076 - TK33B 16.5m HGV Turning Northern Parcel.dwg”
Remediation: Turn off CAD/Revit plot stamp path display or sanitize before client submission.
ATTENTION_REQUIRED Internal CDE / drive path printed in margin of 'cd-1161-transport_statement_part_2-1799529.pdf' (Page 1)
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_08-1-01
Page 1 border contains the internal network/BIM path: 'C:\Users\andrewnock\Motion\StaffSite'.
cd-1161-transport_statement_part_2-1799529.pdf (p. 1): “C:\Users\andrewnock\Motion\StaffSite - Exwysa 2303076\Drawings\2303076 - 06 Passing Place Locations.dwg”
Remediation: Turn off CAD/Revit plot stamp path display or sanitize before client submission.
ATTENTION_REQUIRED Internal CDE / drive path printed in margin of 'cd-1161-transport_statement_part_2-1799529.pdf' (Page 32)
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_08-32-02
Page 32 border contains the internal network/BIM path: 'C:\Users\droddy\Motion\StaffSite'.
cd-1161-transport_statement_part_2-1799529.pdf (p. 32): “C:\Users\droddy\Motion\StaffSite - TP Projects\exwysa 2303076\Drawings\2303076 - 02 Southern Visibility.dwg”
Remediation: Turn off CAD/Revit plot stamp path display or sanitize before client submission.
ATTENTION_REQUIRED Internal CDE / drive path printed in margin of 'cd-211-transport-statement-june-2024.pdf' (Page 33)
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_28-33-01
Page 33 border contains the internal network/BIM path: 'C:\Users\droddy\Motion\StaffSite'.
cd-211-transport-statement-june-2024.pdf (p. 33): “C:\Users\droddy\Motion\StaffSite - TP Projects\exwysa 2303076\Drawings\2303076 - TK03A 16.5m SPA Proposed Access N Parcel.dwg”
Remediation: Turn off CAD/Revit plot stamp path display or sanitize before client submission.
ATTENTION_REQUIRED Internal CDE / drive path printed in margin of 'cd-211-transport-statement-june-2024.pdf' (Page 35)
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_28-35-02
Page 35 border contains the internal network/BIM path: 'C:\Users\calummcgoff\OneDrive'.
cd-211-transport-statement-june-2024.pdf (p. 35): “C:\Users\calummcgoff\OneDrive - Motion\TP Projects\exwysa 2303076\Drawings\2303076 - TK30 16.5m SPA Proposed Access S Parcel1.dwg”
Remediation: Turn off CAD/Revit plot stamp path display or sanitize before client submission.
ATTENTION_REQUIRED Internal CDE / drive path printed in margin of 'cd-211-transport-statement-june-2024.pdf' (Page 37)
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_28-37-03
Page 37 border contains the internal network/BIM path: 'C:\Users\andrewnock\Motion\StaffSite'.
cd-211-transport-statement-june-2024.pdf (p. 37): “C:\Users\andrewnock\Motion\StaffSite - Exwysa 2303076\Drawings\2303076 - TK33B 16.5m HGV Turning Northern Parcel.dwg”
Remediation: Turn off CAD/Revit plot stamp path display or sanitize before client submission.
ATTENTION_REQUIRED Stale report template title in PDF /Title metadata of 'cd-764-gladman-lancaster-flood-risk-150126.pdf'
HYG_LOCAL_PATH_OR_METADATA_LEAK | F-HYG-PATH-doc_41-META-02
The PDF /Title metadata retains a legacy template name: 'High Court Judgment Template'.
cd-764-gladman-lancaster-flood-risk-150126.pdf (p. 1): “PDF /Title: High Court Judgment Template”
Remediation: Update document properties in Word / InDesign to reflect the actual project title.
HYGIENE_ADVISORY [Partial Harvest Caveat] Referenced BS 5837 Tree Survey / Arboricultural Impact Assessment not found in harvested pack
REG_MISSING_REFERENCED_DOCUMENT | F-REG-MISSING-ARBORICULTURAL_SURVEY
'3375110-appeal-decision.pdf' (Page 8) affirmatively references a companion BS 5837 Tree Survey / Arboricultural Impact Assessment, which was not found in the audited submission pack inventory. Note: pack completeness check indicates a partial/capped harvest (manifest.json total_documents=117 hit DEFAULT_MAX_FILES=50.; manifest.json total_bytes=341.8 MB approached DEFAULT_MAX_MB=250 MB.), so this document may exist on the planning portal outside the harvested files.
3375110-appeal-decision.pdf (p. 8): “e and road are such that sufficient space exists for the cable to avoid significant tree roots. 57. The submitted Arboricultural Impact Assessment sets out the measures that will be taken to avoid damage to trees within the highway during constru”
Remediation: Confirm whether the BS 5837 Tree Survey / Arboricultural Impact Assessment was omitted from the upload/portal or supply it with the submission.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION BNG Habitat Unit Net Loss / Headline Metric Contradiction (+62.34%, +73.69%, +80.65%, +122.35%)
SEM_BNG_METRIC_OR_TARGET_CONTRADICTION | F-SEM-BNG-HAB-03
There is a substantive discrepancy between the headline Biodiversity Net Gain (BNG) figures quoted across the application pack. The Ecological Impact Assessments (cd-111, cd-217, cd-38) calculate a +122.35% habitat unit gain (and +33.75% hedgerow units) using Natural England Metric 3.1. Conversely, the Planning Statements (cd-12, cd-24) report a +80.65% habitat unit gain (and +62.34% hedgerow units). Additionally, the Appeal Decision references a +73.69% habitat unit gain (and +60.77% hedgerow units) under the Statutory Metric. The automated scanner also misattributed the 62.34% hedgerow figure as habitat units. Because all iterations comfortably exceed the statutory 10% threshold, this is not a fatal scheme blocker (SHOWSTOPPER), but represents unresolved metric version drift between the planning and ecological statements.
3375110-appeal-decision.pdf (p. 16): “statutory Biodiversity Metric calculation. Overall, it would result in a net gain of 73.69% in habitat units, 60.77% in hedgerow units and 14.40% in watercourse units. This is a benefit of the”
cd-111-ecological_impact_assessment-1800371.pdf (p. 68): “using the Natural England Biodiversity Metric 3.1, the development would result in a habitat unit ga in of 122.35% and a hedgerow unit gain of 33.75% due to the seeding of species-rich meadow grassla”
cd-12-planning-statement-jan-2024.pdf (p. 40): “will result in a substantial biodiversity net gain including a net gain of 80.65% of habitat units and 62.34% of hedgerow units. It is recommended that if the Council are minded to approve the a”
Remediation: Update the Planning Statement to reconcile with the definitive Statutory Biodiversity Metric calculation tool and the latest EcIA revision, ensuring exact consistency across habitat, hedgerow, and watercourse unit percentages.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Absence of Empirical BRE 365 Infiltration Tests and Contradictory Infiltration Reliance
TECH_DRAINAGE_SUDS_GAP | F-FC-001
In Section 7.4, infiltration-based SuDS are dismissed solely using desktop BGS and SoilScapes mapping without any empirical BRE 365 trial-pit infiltration testing. Contradictorily, Section 7.16 then relies on infiltration into the underlying ground beneath 22.5m x 1.0m x 0.7m gravel filter drains for the solar connection infrastructure buildings without BRE 365 soakage test logs or groundwater monitoring to prove feasibility.
cd-37-r001v6-in_p21-2533-fra-surface-water-drainage-strategy.pdf (p. 29): “It is proposed to locate a filter drain 22.5m long, 1.0m wide and 0.7m deep around the proposed buildings. These gravel trenches will help store surface water runoff from the small buildings, aiding infiltration into the ground below.”
Remediation: Undertake site-specific BRE 365 trial-pit infiltration testing and groundwater monitoring across both the BESS/substation compound and the solar connection infrastructure building locations, and revise the filter drain or positive drainage design accordingly.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Pipe-to-Pond Reliance, Omitted Swales, and Conflicting Permeable Pavement Water Quality Credit
TECH_DRAINAGE_SUDS_GAP | F-FC-003
Table 7.1 confirms swales could convey runoff on site yet explicitly omits them in favour of a piped collector drain to a single detention basin, while dismissing bioretention and wetlands with one-line land-take assertions despite a 101ha site. Additionally, Table 7.3 claims CIRIA C753 permeable pavement treatment indices (TSS 0.7, Metals 0.6, Hydrocarbons 0.7) for the gravel BESS compound even though Section 7.21 mandates an impermeable liner beneath the BESS platform and Section 7.10 conveys runoff directly via perforated pipes.
cd-37-r001v6-in_p21-2533-fra-surface-water-drainage-strategy.pdf (p. 28): “Could be used to help convey surface water runoff on Site. Note that no swales have been included within the proposed Surface Water Drainage strategy.”
Remediation: Incorporate open conveyance/source-control SuDS features (such as swales or filter strips) into the management train and revise the CIRIA C753 water quality assessment to reflect the lined, pipe-drained crushed-stone BESS compound.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Unmodelled Fluvial Flood Levels and Deferred Watercourse Crossings on a Full Application
TECH_DRAINAGE_SUDS_GAP | F-FC-004
On this FULL_DETAILED application, the Southern Parcel access road (~100m in Flood Zones 2/3) and three Ordinary Watercourse crossings (including culvert removal and a new crossing over Kingston Brook) are deferred to detailed design with no hydraulic river modelling to verify the estimated 57.95mAOD 1-in-1,000 year flood level or floodplain/afflux impacts. No Section 23 Land Drainage Act 1991 consent evidence or Flood Emergency Management Plan is provided pre-determination despite the EA's March 2024 advice.
cd-37-r001v6-in_p21-2533-fra-surface-water-drainage-strategy.pdf (p. 24): “There are currently 3 proposed instances of access roads crossing Ordinary Watercourses on Site, including 1 over Kingston Brook. The exact design of these access crossings will be confirmed during detailed design.”
Remediation: Provide pre-determination detailed engineering drawings for all three watercourse crossings, hydraulic modelling of Kingston Brook confirming flood levels and zero off-site flood risk increase, evidence of LLFA Section 23 Land Drainage Act engagement, and a site-specific Flood Emergency Management Plan.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Outdated 2024 EA and LLFA Consultation Responses Predating 2025 Flood Data and Layout Revisions
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-006
Appendix A relies on EA (07 March 2024) and LLFA (26 February 2024) 'no objection' letters issued for the originally refused 2024 application. Although Version 6 (October 2025) incorporates March 2025 EA flood data updates, electrical equipment micrositing, and an updated BESS drainage strategy, no updated EA or LLFA consultation responses on the revised 2025 scheme are included, and the Drainage Strategy Drawing (Appendix E) remains at preliminary 'S0' status.
cd-37-r001v6-in_p21-2533-fra-surface-water-drainage-strategy.pdf (p. 4): “The LLFA and EA were consulted on the planning application and provided formal consultation responses on the application on 26th February 2024 and 7th March 2024, respectively. Both consultees responded with no objection to the Development.”
Remediation: Obtain and submit updated LLFA and EA consultation responses confirming acceptability of the October 2025 FRA and revised BESS drainage strategy, and reissue the Drainage Strategy Drawing at Planning status.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Miscalculated and misattributed HGV impact percentages for the southern parcel
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-007
Paragraph 3.28 compares the southern parcel's 19 daily two-way HGVs against Bradmore Road's ATC data (741 total vehicles, 163 HGVs), even though southern parcel HGVs do not route along Bradmore Road. Furthermore, the percentages are inverted (19/741 = 2.6% of total traffic and 19/163 = 11.7% of HGVs, not vice versa), and paragraph 5.5 cites an inconsistent figure of 9 two-way daily HGV movements.
cd-116-transport_assessment_part_1-1799494.pdf (p. 15): “constitutes a 2.6% increase in HGV movements compared to the existing frequency of HGVs or a 12%”
Remediation: Correct the arithmetic inversion and internal trip-number inconsistency (19 vs 9 two-way HGVs/day) and assess southern parcel construction traffic against actual baseline traffic flows on its designated Wysall Road and A60 haul route.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Missing baseline ATC traffic and speed survey on Wysall Road
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-008
Despite the southern parcel generating 2,514 two-way HGV movements (19/day average) via Wysall Road and requiring 215m visibility splays for a 60 mph speed limit, no ATC traffic volume or speed survey was undertaken on Wysall Road. Consequently, neither the proportional impact of southern parcel HGVs on Wysall Road nor actual vehicle speeds at the widened access are empirically verified.
cd-116-transport_assessment_part_1-1799494.pdf (p. 14): “No ATC data is available for Wysall Road to compare the proposed HGV trip generation of the southern”
Remediation: Undertake a 7-day ATC traffic volume and speed survey on Wysall Road adjacent to the southern parcel access to verify baseline HGV flows and 85th percentile approach speeds.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Unaddressed NCC pre-application objections on Bradmore Road forward visibility and banked verges
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-009
Nottinghamshire County Council's pre-application response (Appendix B) warned that Bradmore Road has banked verges restricting passing and poor forward visibility at certain points, stating the route was unsuitable for significant HGV increases unless overcome. The Transport Statement relies solely on an OS-mapping carriageway width check (Appendix G) and four passing bays without assessing forward visibility along the route, verifying verge/highway boundary land, or committing to NCC's requested pre/post condition surveys.
cd-116-transport_assessment_part_1-1799494.pdf (p. 22): “The route is not considered suitable to accommodate a significant increase in HGV movements, and it is unclear where”
Remediation: Conduct a topographical and forward-visibility survey along Pendock Lane/Wysall Road/Bradmore Road to confirm passing bay feasibility within highway land clear of banked verges, and incorporate a binding commitment to pre- and post-construction highway condition surveys.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Omitted traffic management and phasing for 3.35-3.55 km highway cable trenching
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-012
The two site parcels are connected by a buried underground cable following Bradmore Road, Main Street, Costock Road, and Wysall Road (cited inconsistently as 3,350m and 3,550m). For a full planning application along narrow rural roads, the Transport Statement omits all traffic management, temporary road/lane closure, diversion, and phasing details for cable installation, deferring them entirely to the CTMP.
cd-116-transport_assessment_part_1-1799494.pdf (p. 16): “The CTMP will detail the proposed cable route between the two site parcels”
Remediation: Reconcile the cable length discrepancy and submit pre-determination cable-trenching traffic management, phasing, and diversion details demonstrating how highway access and emergency/bus routes will be maintained.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Incomplete PRoW crossing geometry, fenced corridor widths, and unrecorded PRoW consultation
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-013
Two PRoWs cross the northern parcel and intersect the 4m internal construction track at two points, with mitigation relying on fencing, signage, and a banksman operating gates. The report omits fenced PRoW corridor widths, crossing level/surfacing details, and inter-visibility at the gates, and contains no record of consultation with NCC's Public Rights of Way team as requested at pre-application stage.
cd-116-transport_assessment_part_1-1799494.pdf (p. 9): “During both the construction and operational phase, the PROW will be fenced off to ensure users safety.”
Remediation: Specify minimum fenced PRoW corridor widths, crossing surface/level details, and gate setback/visibility geometry at both internal crossings, and document formal consultation with the NCC PRoW team.
HYGIENE_ADVISORY AI Verified: TRUE_CONTRADICTION No Fire Service appliance swept path check around the 85 MW BESS compound
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-014
Internal swept path analyses in Appendices C to F test only a 16.5m articulated lorry and standard car, without verifying Fire and Rescue Service appliance manoeuvring and turning clearance around the 85 MW BESS and substation compound in the southern parcel. On a full application incorporating a utility-scale BESS, emergency vehicle access geometry should be demonstrated.
cd-116-transport_assessment_part_1-1799494.pdf (p. 12): “A swept path analysis of a 16.5m articulated vehicle turning within each parcel has been undertaken to”
Remediation: Provide swept path tracking for a standard Fire and Rescue Service appliance accessing and turning adjacent to the BESS and substation compound in the southern parcel.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Net loss in River Habitat Units (-2.35%) fails BNG statutory and trading rules
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-015
The BNG Assessment identifies a loss of -0.06 river units (-2.35% net loss in River Habitat Units) resulting from the prefabricated bridge over Kingston Brook. Under Defra BNG Metric trading rules and statutory net gain requirements, watercourse losses cannot be offset by area habitat or hedgerow gains, and no like-for-like on-site or off-site river unit compensation is proposed.
cd-12-planning-statement-jan-2024.pdf (p. 92): “Due to the addition of a prefabricated bridge over the Kingston Brook in order to accommodate heavy goods vehicles throughout construction and within the operational life of the solar site, there will be a slight loss of -0.06 river units, leading to an overall net loss of -2.35% in River Habitat Units.”
Remediation: Provide verifiable like-for-like watercourse/riparian enhancement on Kingston Brook within the red-line boundary or secure off-site River Habitat Units (minimum +10% net gain) via S106/biodiversity credit allocation prior to determination.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Incomplete pre-determination archaeological geophysical survey and no trial trenching
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-016
For a full planning application, the northern and western parts of the Southern Parcel remain unsurveyed due to late crop harvesting and poor ground conditions, with results deferred to an undefined future addendum. Given that surveyed areas already revealed complex Romano-British/Iron Age settlement and industrial anomalies and the unsurveyed area is explicitly exempted from the low-potential conclusion, intrusive trial trench evaluation and complete geophysical coverage are unresolved pre-determination.
cd-12-planning-statement-jan-2024.pdf (p. 93): “Due to late harvesting of crops and subsequent poor ground conditions, the northern and western parts of the Site's Southern Parcel were not able to be surveyed during the initial survey. The remaining parts of the site still yet to be surveyed will be revisited at a later date when the ground conditions have improved and can enable the survey to take place. The results of the outstanding survey will be presented to the Council for consideration as a separate addendum report when available.”
Remediation: Complete the outstanding geophysical survey across the Southern Parcel and undertake targeted pre-determination archaeological trial trenching across identified anomalies and proposed cable/track/NE Northern Parcel disturbance zones in consultation with the County Archaeologist.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION BESS unit encroachment into Flood Zone 2 contradicts sequential avoidance claim
TECH_DRAINAGE_SUDS_GAP | F-FC-017
While the Executive Summary states that all critical equipment has been removed from areas of highest flood risk, Section 7 admits an ~8 m2 encroachment of a proposed battery storage unit into Flood Zone 2. On a full application for critical electrical/BESS infrastructure, any Flood Zone 2 encroachment triggers the NPPF Sequential Test and site-specific Exception/flood resilience justification.
cd-12-planning-statement-jan-2024.pdf (p. 100): “However, there is a very small encroachment of a proposed battery storage unit just on the edge of Flood Zone 2. Approximately 8m2 (0.0008ha) of development across the approximately 101ha site is proposed in Flood Zone 2.”
Remediation: Relocate the encroaching BESS unit wholly outside Flood Zone 2 (into Flood Zone 1) with an updated proposed layout drawing, or submit a formal Sequential Test and finished-level/flood-resilience justification acceptable to the Environment Agency and LLFA.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Infiltration SuDS excluded via desktop mapping without empirical BRE 365 testing
TECH_DRAINAGE_SUDS_GAP | F-FC-018
Surface water infiltration for the 1.567 ha impermeable BESS and substation compounds has been ruled out solely on the basis of BGS geological and Soilscapes desktop mapping rather than site-specific BRE Digest 365 percolation testing. Additionally, foundation drainage details for central inverters and auxiliary transformers remain unconfirmed until detailed design.
cd-12-planning-statement-jan-2024.pdf (p. 101): “BGS data show that most of the site is underlain by mudstone and limestone bedrock geology. Mudstone is expected to be impermeable. Additionally, BGS record superficial deposits at the site comprising of 'alluvium - Clay, silt, sand and gravel'. Soilscapes mapping shows the BESS infrastructure to fall under ‘loamy and clayey soils with impeded drainage.’ These ground conditions are not considered suitable for infiltration-based SuDS. Therefore, infiltration-based SuDS have been ruled out as the source of surface water disposal.”
Remediation: Conduct empirical BRE 365 infiltration tests (or provide intrusive GI borehole/trial pit logs) at the BESS/substation compound to verify ground impermeability, and confirm inverter/transformer plinth drainage details pre-determination.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Incomplete GCN pond eDNA surveys and omitted baseline bat activity surveys
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-019
Of 15 ponds on site or within 250 m, only 8 were subject to HSI and eDNA surveys (4 testing positive for GCN), leaving 4 accessible-status ponds unsurveyed due to lack of access or slurry hazard, while hedgerow removals are proposed under a precautionary non-licensed method statement. Furthermore, no baseline foraging/commuting bat surveys were conducted despite immediate adjacency to Bunny Old Wood SINC and hedgerow severance.
cd-12-planning-statement-jan-2024.pdf (p. 90): “There were four ponds recorded on Site and a further 11 ponds within the surrounding 250m of the Site boundary of both parcels. Two of ponds were identified as dry, and one was considered too dangerous to survey due to the amount of slurry present. The fields provided sub-optimal foraging habitat; however, the extensive hedgerow network and adjacent woodland blocks may provide suitable terrestrial habitat for the species. of the recorded ponds, 8 were subject to HSI assessments and eDNA sampling as these were the ponds for which access was granted.”
Remediation: Provide formal eDNA/HSI justification or District Level Licensing / EPSL mitigation strategy for unsurveyed ponds within 250 m where hedgerow/ground disturbance occurs, and verify with the LPA Ecologist whether baseline bat transect/static detector surveys are required.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Cumulative BS 4142 noise assessment relies on unverified proxy assumptions
TECH_EH_GEOTECH_GAP | F-FC-020
Because Condition 23 on the immediately adjacent consented Highfields Solar Farm (22/00303/FUL) has not been discharged and no Noise Impact Assessment was submitted for that scheme, no quantitative cumulative BS 4142 calculation could be undertaken. Instead, the assessment assumes Highfields will generate a Rating level equal to the Development's own isolated level (+3 dB combined).
cd-12-planning-statement-jan-2024.pdf (p. 78): “The planning application for Highfields Solar Farm did not include a Noise Impact Assessment and the Decision Notice for Highfields Solar farm does not specify any noise limits, although Condition 23 of the consent does require the applicant to submit the final specifications and position of any noise-emitting plant prior to construction, supported by a full BS 4142 assessment, should it be deemed necessary. At the time of preparing the supporting Noise Impact Assessment, Condition 23 is yet to be discharged, therefore a detailed calculation of cumulative effects cannot be undertaken.”
Remediation: Support the qualitative cumulative sensitivity test with bounding worst-case acoustic modelling assuming maximum permitted plant noise limits at Highfields Solar Farm, and clarify enforceable BS 4142 daytime/night-time rating limits for the BESS cooling and transformer plant.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION OS Mapping-based passing place assessment and temporary vs permanent contradiction
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-021
The HGV passing assessment along Pendock Lane, Wysall Road, and Bradmore Road relies solely on OS Mapping rather than measured topographical carriageway widths and Stage 1 RSA/visibility splay verification. Moreover, paragraph 7.52 simultaneously describes the 4 proposed passing places as '4 temporary passing places' and states they 'will remain in place following the completion of development'.
cd-12-planning-statement-jan-2024.pdf (p. 68): “A review of where a 16.5m HGV and a car can pass along Pendock Lane/Wysall Road/Bradmore Road has been undertaken based on OS Mapping. This review found that an HGV and a Car can pass on Pendock Lane, however there are sections of Wysall Road and Bradmore Road where an HGV and car cannot pass with the roads current width. It is proposed to install 4 temporary passing places along the access route. The proposed passing places will also allow an HGV to pass an HGV. Full details of the design and proposed locations of the passing places can be viewed within the accompanying Transport Statement submitted in support of this application. As set out above in section 5, the proposed passing places will remain in place following the completion of development to improve the ability of HGV traffic currently using the road to pass when encountering HGVs along the narrowest sections of the road.”
Remediation: Clarify whether the 4 passing places are permanent highway works requiring S278 agreement and Stage 1 Road Safety Audit, and verify carriageway widths and swept paths against topographical highway boundary survey data.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Adjacent 49.9 MW solar scheme excluded from LVIA and superseded 2011 EIA Regs cited
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-022
While the June 2023 EIA screening scheme for a 49.9 MW solar farm at Field Farm, Wysall Road (immediately south) is included in cumulative highways considerations, it is explicitly excluded from cumulative LVIA assessment. Additionally, the Planning Statement cites the superseded Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (rather than the 2017 Regulations) when requesting EIA re-screening.
cd-12-planning-statement-jan-2024.pdf (p. 27): “In addition to the above, it is noted that an EIA Screening Report was submitted to the Council in June 2023 for a proposed 49.9 MW cumulative solar scheme at Land To The East And South-East Of Costock, Rushcliffe (alternative address: Field Farm, Wysall Road, Costock, Nottinghamshire, LE12 6XQ). Based on the submitted documents it appears that the access is being proposed off Rempstone Lane to the south of the Site. This scheme, given its current status, is unlikely to come forward before the determination of the proposed Development. For that reason it is envisaged that the subsequent application, associated with this cumulative development, would consider the proposed development as part of their cumulative assessment as and when an application is submitted.”
Remediation: Update the statutory EIA re-screening request to reference the 2017 EIA Regulations and provide a sensitivity appraisal of potential cumulative landscape/visual effects with the Field Farm, Wysall Road scheme if progressed.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Unmitigated Residual Adverse Impact on Displaced Skylark Territories and Field Number Contradiction
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-023
Converting 94.89 ha of arable farmland displaces six of eight breeding skylark territories (a Section 41 Priority Species and Red-listed bird), yet only 3.62 ha of mitigation meadow is provided on-site (variously cited as Field 7 in Section 3.2.3/Table 14 and Field 8 in Section 3.5.61). Section 3.5.67 concedes that skylark nesting loss will not be fully mitigated, and Section 3.6.4 identifies a cumulative Local-scale adverse displacement effect alongside adjacent solar farm 22/00303/FUL (11 territories, no mitigation).
cd-38-old-wood-energypark_ecia_v70.pdf (p. 73): “The loss of 94.89ha of nesting habitat (arable land) for skylark will not be entirely mitigated for within the”
Remediation: Provide a binding, off-site or expanded on-site skylark mitigation strategy (e.g. skylark plots or equivalent open-field nesting habitat secured via S106/LPA agreement) to fully offset all six displaced territories and reconcile the Field 7 vs Field 8 discrepancy.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Outdated 2022-2023 Species/Desk Baselines and Out-of-Season Reptile Assessment
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-024
For the October 2025 appeal update, only a habitat walkover was repeated while the January 2022 NBGRC records search, June 2022 GCN eDNA, 2022 bird surveys, and 2023 water vole surveys (>2-3.5 years old, exceeding CIEEM validity norms and the report's own 12-month review clause) were not updated despite a new badger sett (TN14) and additional BRP trees appearing by 2025. Reptile assessment also relied on an out-of-season January 2022 walkover and a 24°C August 2025 walkover without targeted refugia surveys despite removing 2.3 ha of modified grassland.
cd-38-old-wood-energypark_ecia_v70.pdf (p. 12): “As such, the update survey findings did not necessitate update to any of the protected species surveys.”
Remediation: Commission an updated NBGRC data search, seasonal reptile presence/absence refugia surveys across Fields 12/13 and field margins, and updated GCN eDNA and breeding bird validation surveys prior to determination.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Positive GCN Ponds Relying on Non-Licensed RAMS Without Committed DLL or EPS Licence Pathway
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-025
Four ponds tested positive for GCN eDNA (inconsistently reported as Ponds 3, 9, 10, 13 on p.5 versus Ponds 3, 9, 10, 14 on p.67 while p.40 states Pond 14 was dry and unsampled) and four off-site ponds within 250 m (Ponds 5-8) remain unsampled. Despite pre-application advice flagging medium GCN risk, 31 m of terrestrial hedgerow removal, and 1.3 ha BESS land take, the assessment relies solely on a non-licensed CEMP precautionary RAMS rather than a committed District Level Licensing (DLL) or Natural England EPS mitigation licence pathway.
cd-38-old-wood-energypark_ecia_v70.pdf (p. 69): “be specified within the CEMP (Ecology) under a non-licensed risk avoidance method statement. This will”
Remediation: Reconcile the conflicting Pond 13/14 eDNA reporting, clarify GCN status within 250 m of the Site, and secure either a NatureSpace/Natural England District Level Licensing certificate or confirm an EPS mitigation licensing pathway prior to determination.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Contradictory Dormouse Assessment Omitting Nut Search Despite Hazel in Removed Hedgerow H2
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-026
Section 2.4.68 records that hazel is present in Old Wood North within hedgerows H1, H2, and H20, yet Section 2.4.70 erroneously states that a dormouse nut search was not undertaken 'due to the lack of hazel'. Because 10 m of species-rich hedgerow H2 is permanently removed for site access, dormouse presence in suitable connected habitat has not been robustly excluded ahead of hedgerow clearance.
cd-38-old-wood-energypark_ecia_v70.pdf (p. 39): “however a nut search was not undertaken due to the lack of hazel, and no obvious signs of dormice were noted.”
Remediation: Complete a targeted hazel nut search and/or nest tube survey along H1, H2, and H20 (or confirm ecological justification with the LPA) before determination and prior to any clearance of H2.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION No Baseline Bat Activity or Emergence Surveys Despite 15 BRP Trees, Barbastelle Records, and Hedgerow Loss
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-027
Although NBGRC returned 66 bat records within 2 km including Annex II barbastelle, 15 boundary trees have Bat Roosting Potential (majority moderate BRP), 31 m of hedgerow will be removed, and Section 3.5.10 acknowledges unresolved collision/acoustic confusion risks from smooth solar PV panels, no seasonal bat activity/commuting transect or static detector surveys were undertaken. On a full application adjacent to Bunny Old Wood ancient woodland LWS, dismissing baseline surveys on the assumption of complete avoidance leaves commuting/foraging impacts unverified.
cd-38-old-wood-energypark_ecia_v70.pdf (p. 64): “No further surveys to ascertain the baseline use of the Site by foraging / commuting bats are”
Remediation: Undertake seasonal bat transect and static detector surveys (plus aerial inspection/emergence surveys for any trees near works/access) to establish baseline commuting corridors and verify zero fragmentation or lighting impact.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unsubstantiated Under-Panel BNG Grassland Condition Assumption and Deferred HMMP
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-028
The Statutory Biodiversity Metric v3.0 calculation assumes ~66.4 ha of newly seeded grazing grassland beneath solar panels will achieve 'fairly poor' rather than 'poor' condition without empirical shading or sward establishment evidence, artificially elevating post-development units. Furthermore, on a full application, the mandatory Habitat Management and Monitoring Plan (HMMP / LEMP) and full Statutory Metric calculation workbook are neither included nor finalised pre-determination.
cd-38-old-wood-energypark_ecia_v70.pdf (p. 76): “Rating the modified grassland as ‘fairly poor’ is a conservative effort in case the grassland cannot get to the required 8-10 species needed to”
Remediation: Submit the full Statutory Biodiversity Metric v3.0 spreadsheet, a draft 30-year HMMP/LEMP demonstrating realistic target conditions under PV shading, and sensitivity testing if under-panel grassland achieves only 'poor' condition.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unfinalised Security Fencing Mammal Permeability and Outdated 2023 Arboricultural Plan
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-029
Perimeter security fencing relies on unverified 'natural undulations' or conditional 10 cm gaps intended to force badgers to excavate beneath rigid fencing rather than specifying dedicated, appropriately sized mammal passes (typically 150-200 mm x 300 mm at defined intervals) on detailed drawings. Additionally, tree and RPA buffers rely on a November 2023 Tree Retention and Removal Plan (BHA_5598_02) that predates the September 2025 landscaping revisions and the August 2025 identification of additional BRP trees.
cd-38-old-wood-energypark_ecia_v70.pdf (p. 63): “gaps of approximately 10cm will be provided to encourage badgers to excavate beneath the fence whilst ensuring that the fence remains livestock-proof.”
Remediation: Specify mammal permeability gates/gaps (150-200 mm minimum) on the detailed security fencing drawings and update BS 5837 Tree Retention and Removal Plan BHA_5598_02 to align with the 2025 landscaping layout and 15 BRP trees.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Unfixed Design Details ('Rochdale Envelope') and Indicative Layout Plan on a Full Application
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-030
Despite being submitted as a full planning application, Section 4 states that precise infrastructure layout, solar/BESS technology selection, and final panel heights remain unfixed and seeks to defer final detailed design to a pre-commencement condition. Furthermore, the appended Site Layout Plan (WLL02A-EXG-04-00-D-K001 Rev P04.08, p. 37) is dated 18/05/2023, marked 'For Information Only' (Status S0), and states 'All areas are approximate and indicative only', predating the December 2023 final design described in Section 5.10.
cd-13-design-and-access-statement-jan-2024.pdf (p. 13): “It follows that it has not been possible for the Applicant to fix all of the design details at this stage. The Applicant has therefore sought to incorporate sufficient design flexibility. This relates to the dimensions and layout of structures forming part of the Development, including the precise layout of the infrastructure and the maximum height of the solar panels.”
Remediation: Submit a finalised, 'For Approval' scaled Site Layout Plan and fixed maximum/detailed parameter elevations and plant specifications consistent with the December 2023 design and technical assessments prior to determination.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Inadequate 3m BESS Container Separation and Partial Compliance with 2023 NFCC Guidance
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-031
Section 5.17 states the layout incorporates 'as many recommendations as possible' from the 2023 NFCC guidance on utility-scale BESS, yet Section 5.23 specifies only a ~3m gap between containerised battery and inverter units. This is below the NFCC recommended minimum 6m separation between battery units (and 10m from sensitive infrastructure/boundaries) to prevent thermal runaway propagation, and no Outline Battery Safety Management Plan or firewater containment sizing is referenced.
cd-13-design-and-access-statement-jan-2024.pdf (p. 18): “There will be a gap of around 3m between each containerised battery units and proposed inverter units.”
Remediation: Revise the BESS compound layout to achieve >=6m separation between battery containers (or provide an independent thermal radiation/blast engineering justification agreed with Nottinghamshire Fire and Rescue Service) and submit a standalone Outline Battery Safety Management Plan detailing firewater volume and containment.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unquantified Cumulative Construction Traffic and Reliant 'Reasonable Endeavours' Mitigation
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-032
Section 5.55 identifies two nearby solar/BESS schemes (an EIA screening request on Wysall Lane and consented application 22/00303/FUL off the A60 Bunny Hill) that could overlap with the 4,092 predicted two-way construction vehicle movements. However, no quantitative cumulative traffic impact assessment is reported in the DAS, and relying on a contractor's 'reasonable endeavours' to coordinate deliveries is unenforceable.
cd-13-design-and-access-statement-jan-2024.pdf (p. 25): “It is acknowledged that there are a number of other similar developments and proposals within the surrounding area of the site which could give rise to the potential for cumulative highways impacts if construction is scheduled concurrently with the Development. In order minimise the potential cumulative impact of construction traffic the site contractor will make reasonable endeavours to coordinate deliveries with these construction sites, particularly when coordinating construction traffic associated with the delivery of the Southern Parcel.”
Remediation: Undertake a quantitative cumulative construction traffic sensitivity check incorporating consented/proposed adjacent schemes in the Transport Statement/CTMP and replace 'reasonable endeavours' with binding delivery scheduling and HGV routing controls.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unreported Outcome of April 2022 RBC Pre-Application Advice Request
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-033
Section 5.5 notes that a Pre-application Advice Request was submitted to Rushcliffe Borough Council in April 2022, and Sections 3.9–3.13 summarise public consultation feedback. However, the DAS omits any summary of RBC's formal pre-application response or a compliance matrix demonstrating how officer directives were addressed in the final scheme.
cd-13-design-and-access-statement-jan-2024.pdf (p. 14): “The initial site extent was that originally used to define the scope of the Development and application boundary which was subject to Pre-application Advice Request from RBC in April 2022.”
Remediation: Provide a pre-application compliance summary setting out all advice/issues raised by RBC officers in response to the April 2022 request and cross-referencing where each point has been resolved in the submitted plans and technical reports.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Internal Contradictions on Inter-Parcel Cable Origin and MV Inverter Count
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-034
Section 2.3 states that the underground cable link exits the western side of the Northern Parcel before following Bradmore Road, contradicting Sections 1.2 and 1.6 (p. 4) which state it extends eastwards from the eastern side/boundary. Additionally, Section 5.24 (p. 19) refers to '35no. MV inverter units' while listing 17 in the Northern Parcel and 8 in the Southern Parcel (totalling 25, conflated with the 35 BESS inverter units).
cd-13-design-and-access-statement-jan-2024.pdf (p. 6): “The two site parcels would be linked by an underground cable which will extend from the western side of the Northern Parcel before following the route of the highway along Bradmore Road – Keyworth Road – Main Street – Costock Road – Wysall Road and eventually extending northwards into the southern boundary of the Southern Parcel.”
Remediation: Issue an updated DAS erratum/revision reconciling the Northern Parcel cable exit alignment with Appendix 1 and correcting the total MV central inverter count (25no. vs 35no. battery inverters).
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unassessed External Security Lighting Impact Against Protected Woodland and BRP Buffers
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-035
The DAS specifies motion-sensor activated security lighting on electrical housings/buildings alongside 4m-high infrared CCTV columns across a site containing trees with high, moderate, and low Bat Roost Potential (BRP) and adjacent to Old Wood SINC/ancient woodland. No ILP GN 01/21 external lighting lux contour plot or dark-corridor verification is referenced in the DAS to confirm zero light spill onto sensitive bat habitats.
cd-13-design-and-access-statement-jan-2024.pdf (p. 20): “Timer motion sensor activated security lighting to be installed on proposed electrical housing and buildings, enabling the visibility for any unscheduled maintenance. Any installed lighting will be downwards facing to limit any light emittance when lit.”
Remediation: Submit an ILP GN 01/21 compliant external lighting strategy and lux contour plan demonstrating that security lighting and IR CCTV illumination will not cause light spill into Old Wood SINC or BRP hedgerow buffers.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unfinalised Surrogate Plant Specifications on Full Planning Application
TECH_EH_GEOTECH_GAP | F-FC-036
On a FULL_DETAILED application, operational noise predictions rely entirely on surrogate sound power levels from unspecified similar sites because actual BESS, inverter, cooler, and transformer plant has not been finalised, and the appended Site Layout Plan is marked Status S0 ('For Information Only'). Because predicted night-time Rating levels at NSR 1 and NSR 3 are already +3 dB above background (only 2 dB below the EHO's +5 dB threshold), unverified procurement assumptions create a material risk of exceeding BS 4142 Adverse impact criteria.
cd-120-noise_report_assessment-1799486.pdf (p. 12): “As requested by the client, The equipment modelled as part of this assessment has been based on similar BESS / solar developments. The actual plant ultimately chosen for installation is yet to be finalised, however these will be selected to comply with any noise limits specified in the Development's planning conditions.”
Remediation: Submit confirmed manufacturer acoustic specifications (octave-band sound power levels and enclosure/attenuation details) for the exact proposed plant or commit to an enforceable maximum sound power envelope and spatial layout drawing at full status prior to determination.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unverified 0 dB Tonal Penalty Despite Prominent 125 Hz and 4 kHz Octave-Band Peaks
TECH_EH_GEOTECH_GAP | F-FC-037
Section 7.3 applies a 0 dB tonal penalty based on prior experience that BESS inverter noise is broadband, yet the surrogate spectra in Table 5 display sharp octave-band peaks—specifically 73 dB at 125 Hz for the BESS Cooler (10-11 dB above adjacent 63 Hz and 250 Hz bands) and 81 dB at 4000 Hz for the Centralised Solar Inverter/Transformer (6-12 dB above adjacent bands). Under BS 4142:2014+A1:2019, even a +2 dB ('just perceptible') or +4 dB ('clearly perceptible') tonal correction would raise NSR 1 and NSR 3 night-time Rating levels from +3 dB to +5 dB or +7 dB above background, breaching the EHO's +5 dB target.
cd-120-noise_report_assessment-1799486.pdf (p. 14): “Tonal Elements: The main noise-emitting plant in the Development will be the BESS inverter systems. Based upon prior experience of operational developments, this noise is broadband in nature and therefore non-tonal;”
Remediation: Provide 1/3-octave band or narrowband (FFT) tonal analysis per BS 4142 Annex C/D for the selected BESS coolers, transformers, and inverters, or demonstrate compliance at NSR 1 and NSR 3 with an appropriate tonal penalty included.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Night-Time Predictions Limited to 1.5 m Ground Height Without BS 8233 Internal Bedroom Check
TECH_EH_GEOTECH_GAP | F-FC-038
Although BS 8233:2014 is cited as pertinent guidance (Section 3) and BS 4142 is quoted on the importance of absolute levels when background levels are low at night (29-31 dB LA90), all predictions in SoundPLAN use a single 1.5 m ground-level external amenity height. First-floor bedroom window heights (~4.0 m) experience reduced ground attenuation at night, and no BS 8233 absolute night-time internal bedroom level assessment (30 dB LAeq,8h) has been presented.
cd-120-noise_report_assessment-1799486.pdf (p. 13): “A receiver height of 1.5 m (approximating head height in the closest external amenity space of each assessed dwelling);”
Remediation: Re-run night-time SoundPLAN predictions at first-floor bedroom height (4.0 m) for all dwellings and provide an explicit BS 8233 absolute internal/external night-time assessment considering partially open windows.
HYGIENE_ADVISORY AI Verified: TRUE_CONTRADICTION Speculative Qualitative Cumulative Assessment for Adjacent Highfields Solar Farm
TECH_EH_GEOTECH_GAP | F-FC-039
Section 9 acknowledges that consented Highfields Solar Farm (22/00303/FUL) had no NIA, has no noise limits on its Decision Notice, and has not discharged Condition 23. Assuming Highfields will generate a Rating level no higher than Old Wood Energy Park (-4 dB below background) and restricting consideration to NSR 8 and NSR 9 lacks empirical or consented-limit verification.
cd-120-noise_report_assessment-1799486.pdf (p. 16): “The planning application for Highfields Solar Farm did not include a Noise Impact Assessment and the Decision Notice for Highfields Solar farm does not specify any noise limits, although Condition 23 of the consent does require the applicant to submit the final specifications and position of any noise-emitting plant prior to construction, supported by a full BS 4142 assessment, should it be deemed necessary.”
Remediation: Check whether Condition 23 for Highfields Solar Farm has since been discharged to obtain confirmed plant locations and emission data, or model a bounding cumulative worst-case scenario across all potentially affected receptors.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION MicroDrainage Appendix Models Only +25% CC (Not +40%), Shows 'Flood Risk' Failures, and Omits Network Calculations
TECH_DRAINAGE_SUDS_GAP | F-FC-040
Although Section 7.11 and Appendix C state that the BESS attenuation basin is designed for the 1 in 100-year event plus 40% climate change, Appendix D only provides MicroDrainage Source Control results for the 100-year +25% CC scenario. Furthermore, even at +25% CC, 18 storm durations (180–1440 min Summer and 120–2160 min Winter) report 'Flood Risk' status (peaking at 963.0 m3 and 0.905 m depth in a 1 m deep basin), and no full pipe/network hydraulic modelling is submitted for the perforated collector pipes, storm drains, and fire-water storage pipe.
cd-117-flood_risk_assessment_and_drainage_strategy-1799492.pdf (p. 52): “600 min Winter 99.905 0.905 5.8 963.0 Flood Risk”
Remediation: Submit full MicroDrainage or Causeway Flow hydraulic network and storage calculations up to the 1 in 100-year +40% (or applicable +45% peak rainfall) climate change event showing zero flooding and sufficient freeboard above top water level.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Infiltration Dismissed Desktop-Only for BESS Yet Relied Upon Without BRE 365 Tests for Solar Buildings
TECH_DRAINAGE_SUDS_GAP | F-FC-041
Section 7.4 rules out infiltration SuDS for the BESS solely from desktop BGS and SoilScapes mapping without empirical BRE 365 trial-pit infiltration testing. Contradictorily, Section 7.15 proposes 22.5 m x 1.0 m x 0.7 m gravel trenches around the two solar connection infrastructure buildings explicitly 'aiding infiltration into the ground below' without any BRE 365 permeability tests, groundwater level checks, or hydraulic sizing calculations.
cd-117-flood_risk_assessment_and_drainage_strategy-1799492.pdf (p. 27): “buildings, aiding infiltration into the ground below. Any surface water exceeding the capacity”
Remediation: Undertake site-specific BRE 365 infiltration testing and groundwater monitoring across both the BESS compound and solar connection building locations to verify infiltration feasibility or size fully attenuated positive outfalls.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Unjustified Omission of NPPF Sequential Test for BESS in Flood Zone 2 and Unresolved FZ2/3 Access
TECH_DRAINAGE_SUDS_GAP | F-FC-042
Section 4.6 confirms that approximately 8 m2 of a proposed battery storage unit encroaches onto Flood Zone 2, yet dismisses the statutory NPPF Sequential Test on the unsupported assumption that a higher-resolution hydraulic model might exclude it. In addition, the southern parcel access lies within Flood Zones 2 and 3 and surface water flood risk areas, with both track specification and a Flood Emergency Management Plan deferred to detailed design on a full application.
cd-117-flood_risk_assessment_and_drainage_strategy-1799492.pdf (p. 11): “Approximately 8m2 (0.0008ha) of development across the approximately 101ha site is”
Remediation: Either relocate all BESS infrastructure out of Flood Zone 2 or submit a formal NPPF Sequential Test (and site-specific hydraulic modelling of Kingston Brook if challenging EA Flood Zones), together with a pre-determination Flood Emergency Management Plan for the southern parcel access.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Pipe-to-Pond BESS Drainage, Understated Pollution Hazard Index, and Missing Section 23 Watercourse Consents
TECH_DRAINAGE_SUDS_GAP | F-FC-043
Despite Table 7.1 identifying swales, filter drains, and permeable paving as suitable, Section 7.10–7.11 routes the 1.322 ha BESS/substation runoff via subsurface perforated collector pipes and an underground fire-water tank straight to a single attenuation basin—a pipe-to-pond design lacking multi-stage treatment. Table 7.2 misapplies 'Other roofs' Low pollution hazard indices rather than commercial/industrial yard and electrical compound indices, and Section 6.30 adopts only a 3 m Ordinary Watercourse easement without Section 23 Land Drainage Act consent or riparian evidence for the Kingston Brook outfall and three watercourse crossings.
cd-117-flood_risk_assessment_and_drainage_strategy-1799492.pdf (p. 28): “Other roofs (typically Low 0.3 0.2 0.05”
Remediation: Incorporate above-ground multi-stage SuDS source/conveyance controls (e.g. swales/filter strips), revise CIRIA C753 water quality indices for the BESS/substation compound and crushed-stone tracks, and provide LLFA consultation/Section 23 Land Drainage Act consent evidence and easement agreement for the Kingston Brook outfall and clear-span crossings.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Unresolved National Highways Holding Objection and Unassessed SRN Peak-Hour Impact
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-045
Appendix C contains a formal National Highways holding recommendation against approval due to insufficient evidence on construction worker light-vehicle trips impacting the A52/A46 SRN, requiring proof that staff trips will not exceed 15 two-way trips or updating of the CTMP. The revised TS (para 3.28, Table 3.3) now models 50 worker vehicles arriving in the 08:00 AM peak hour (exceeding NH's 30 two-way peak-hour trip assessment threshold), yet provides only daily A52 AADT percentages (para 3.35) with no SRN junction peak-hour assessment and no confirmation that NH's holding objection has been lifted.
cd-211-transport-statement-june-2024.pdf (p. 30): “In summary, insufficient information has been submitted for National Highways to understand how the proposal will affect the Strategic Road Network. We therefore recommend that this application not be approved for a period of up to three months from the date of this letter.”
Remediation: Undertake a peak-hour SRN junction impact assessment (A52/A60) for the 50 AM-peak construction worker light vehicles, update the CTMP with enforceable worker travel controls, and secure formal withdrawal of National Highways' holding objection prior to determination.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Northern Parcel Visibility Splay Calculation Uses Wrong ATC Dataset
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-046
Paragraph 4.3 claims the 20-26 May 2023 ATC survey recorded 7-day 85th percentile speeds of 43.5 mph northbound and 44.8 mph southbound, deriving 118 m and 123 m visibility splays (Appendix L). However, Appendix K shows that the 20-26 May 2023 survey (Wysall ATC 1, Bradmore Road N) recorded higher 7-day 85th percentile speeds of 47.0 mph northbound and 47.2 mph southbound, while 43.5/44.8 mph belong to Wysall ATC 2 (12-18 May 2023); additionally, para 4.3 states no wet-weather adjustment was applied whereas Appendix L tabulates wet-weather speeds (41.0/42.3 mph), leaving the northern access visibility splays unverified.
cd-211-transport-statement-june-2024.pdf (p. 16): “A 7 day 85th percentile speed of 43.5 miles per hour northbound and a 7 day 85th percentile speed of 44.8 miles per hour southbound. During the course of the ATC, no wet weather was experienced, therefore no wet weather adjustment has been applied, in line with DMRB guidance. This equates to 118m northbound and 123m southbound of visibility.”
Remediation: Reconcile the exact ATC location for the northern parcel access against Figure 4.1, recalculate DMRB stopping sight distances using the verified 85th percentile wet/dry speeds (including 47.0/47.2 mph if ATC 1 governs), and update Appendix L and Appendix M drawings accordingly.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Missing ATC Baseline Data for Wysall Road and Inverted Southern Parcel HGV Calculations
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-047
Paragraph 3.23 explicitly confirms no ATC traffic or speed survey data is available for Wysall Road, leaving baseline HGV volumes and 85th percentile speeds along the southern parcel's haul route unverified. Paragraphs 3.27 and 5.5 then erroneously compare the southern parcel's 19 two-way daily HGVs (misquoted as 9 in para 5.5) against Bradmore Road's flow (741 total / 163 HGVs) and invert the percentage impacts (reporting 2.6% HGV increase and 12% total traffic increase, when 19/163 is 11.7% and 19/741 is 2.6%).
cd-211-transport-statement-june-2024.pdf (p. 13): “No ATC data is available for Wysall Road to compare the proposed HGV trip generation of the southern parcel to the existing HGV traffic on Wysall Road.”
Remediation: Conduct a 7-day ATC survey on Wysall Road at the southern parcel access/haul route, correct the arithmetic and parcel-attribution errors in paragraphs 3.22, 3.26, 3.27, and 5.5 (and reconcile 142 vs 284 site-setup HGVs), and re-evaluate southern parcel HGV impacts against Wysall Road baseline flows.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unaddressed Right-Turn Egress Swept Path Request for Southern Parcel Access
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-048
Nottinghamshire County Council (Appendix B) formally requested a swept path analysis showing a 16.5 m articulated HGV turning right out of the southern parcel access because prescribed HGV routing prohibits left turns through Wysall village, noting Drawing 2303076-TK30 only showed left-in/left-out. Although Section 1.5 claims this updated swept path is at Appendix F, Appendix E still contains the unrevised 31/10/23 TK30 drawing and Appendix F contains internal turning/passing drawings (TK33 B and TK32), leaving right-turn egress onto Wysall Road undemonstrated.
cd-211-transport-statement-june-2024.pdf (p. 23): “This shows a left in/left out access arrangement for a 16.5m HGV. As the route would mean that HGVs would only be allowed turn right out of the site, the right turn swept path should be shown.”
Remediation: Prepare and submit a revised swept path drawing for the southern parcel access showing a 16.5 m articulated HGV turning right out onto Wysall Road (and left in), and correct the mislabelled Appendix D/E/F cross-references in Section 1.5 and Section 3.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unassessed 3,350-3,550 m Off-Site Highway Cable Trenching and Pending Traffic Manager Approval
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-049
The proposal includes a 3,350 m (stated as 3,550 m in para 3.4) buried cable routed along public highways (Bradmore Road/Main Street/Costock Road/Wysall Road), yet the TS provides no trenching phasing, temporary road/lane closure analysis, or diversion/bus/emergency-access assessment, deferring all works management to the CTMP. NCC's formal response confirms that County Council Traffic Managers have not yet advised whether highway cable trenching is acceptable.
cd-211-transport-statement-june-2024.pdf (p. 24): “part of the proposal is to run an underground cable in the highway between the two parcels. We have sought clarification with the County Councils Traffic Managers as to whether this is acceptable and to determine the potential implications.”
Remediation: Submit a detailed highway cable-trenching traffic management, phasing, and diversion assessment (reconciling the 3,350 m vs 3,550 m length) and obtain formal clearance from Nottinghamshire County Council Traffic Managers prior to determination.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION No Quantitative Cumulative Construction Traffic Assessment with Consented Solar/BESS
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-051
Section 2.8 identifies an adjacent consented solar farm and battery storage scheme (Ref: 22/00303/FUL, permitted 16 February 2023 onto the A60 at Bunny Hill) and a further 49.9 MW solar EIA screening request on Wysall Lane south of the southern parcel. Despite overlapping reliance on the A60 corridor, the TS conducts no quantitative cumulative construction trip or junction assessment, relying solely on non-binding contractor endeavours to coordinate deliveries.
cd-211-transport-statement-june-2024.pdf (p. 9): “The Contractor will make reasonable endeavours to coordinate deliveries with these construction sites, this is to minimise the cumulative impact of construction traffic.”
Remediation: Quantify combined peak construction HGV and worker light-vehicle flows with consented development 22/00303/FUL on the A60 and Costock/Wysall Road junctions, and embed an enforceable delivery-scheduling protocol in the CTMP.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Incomplete Technical Specification for Internal PROW Crossings
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-052
Two Public Rights of Way cross the northern parcel and intersect the 4 m internal HGV access track at two points. Although fencing and banksman escorting are described, the TS omits fenced PROW corridor widths, crossing surface/level details, gate setbacks/sightlines, and operational-phase crossing arrangements.
cd-211-transport-statement-june-2024.pdf (p. 8): “During both the construction and operational phase, the PROW will be fenced off to ensure users safety. A qualified Banksman will walk alongside construction vehicles through the Site, when a PROW crossing is reached, the qualified banksman will check there are no PROW users then open the gate to allow the construction vehicle to continue.”
Remediation: Provide detailed PROW crossing layout drawings specifying minimum fenced corridor widths, gate setbacks, surfacing/level transitions, warning signage, and operational-phase safety controls for NCC Rights of Way approval.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Net loss of -2.35% (-0.06) River Habitat Units from Kingston Brook bridge
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-053
Although the scheme forecasts +80.65% area habitat and +62.34% hedgerow net gains, installing the prefabricated HGV bridge over Kingston Brook results in a net loss of -0.06 river units (-2.35%). Under statutory BNG trading rules and the Environment Act framework, river habitat losses cannot be offset by area habitat or hedgerow gains, and no on-site watercourse enhancement or off-site river unit allocation is secured.
cd-24-planning-statement-pt-1-feb-25.pdf (p. 92): “there will be a slight loss of -0.06 river units, leading to an overall net loss of”
Remediation: Update the Statutory Biodiversity Metric and EcIA prior to determination to compensate for the -0.06 river unit loss via bespoke on-site Kingston Brook riparian/in-channel enhancement or a secured off-site river unit allocation/S106 achieving >=10% net gain across all modules.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Incomplete geophysical survey on Southern Parcel and missing trial trenching
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-054
On this full detailed application, the northern and western parts of the Southern Parcel were omitted from the August–September 2023 geophysical survey due to late crop harvesting and poor ground conditions, leaving baseline archaeological potential unverified and deferred to a future addendum. Furthermore, despite identifying Romano-British settlement and industrial anomalies in the Northern Parcel, no pre-determination trial trenching is reported to test significance under NPPF paragraph 200.
cd-24-planning-statement-pt-1-feb-25.pdf (p. 93): “the northern and western parts of the Site's Southern Parcel were not able to be surveyed”
Remediation: Complete the outstanding geophysical survey across the northern and western Southern Parcel and submit the addendum report prior to determination, together with targeted trial trenching agreed with the County Archaeologist to characterise the subsurface remains.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Electrical infrastructure in surface water flood zone and BESS unit in Flood Zone 2
TECH_DRAINAGE_SUDS_GAP | F-FC-055
On a full planning application, the solar connection infrastructure encroaches the 1-in-1,000 year surface water flood extent (<150 mm depth), and the report improperly defers relocating it out of the flood zone to 'detailed design'. Additionally, ~8 m² of a battery storage unit encroaches Flood Zone 2 without demonstrating compliance with the NPPF Sequential and Exception Tests for critical electrical infrastructure.
cd-24-planning-statement-pt-1-feb-25.pdf (p. 97): “during detailed design, it is expected that the site layout is amended to move the solar”
Remediation: Amend the Proposed Layout (DWG No. WLL02A-EXG-04-00-D-K001-P0408) and FRA prior to determination to relocate all solar connection infrastructure outside the 1-in-1,000 year surface water flood extent and remove the ~8 m² BESS encroachment from Flood Zone 2 (or submit formal Sequential/Exception Test evidence).
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Infiltration SuDS ruled out via desktop mapping without empirical BRE 365 tests
TECH_DRAINAGE_SUDS_GAP | F-FC-056
The BESS and substation surface water drainage strategy dismisses infiltration-based SuDS solely on BGS geology and Soilscapes desktop mapping ('loamy and clayey soils with impeded drainage') without undertaking site-specific BRE Digest 365 percolation tests. Relying solely on desktop data does not provide empirical verification under the CIRIA C753 SuDS hierarchy for a full detailed application.
cd-24-planning-statement-pt-1-feb-25.pdf (p. 101): “These ground conditions are not considered suitable for infiltration-based SuDS. Therefore,”
Remediation: Carry out site-specific BRE Digest 365 infiltration tests and groundwater monitoring at the BESS/substation compound (or obtain written LLFA confirmation waiving infiltration testing) and verify full 1-in-100yr + 40% CC network and exceedance routing calculations.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Only partial mitigation provided for six displaced skylark breeding territories
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-057
Converting 47 ha of arable land to solar panels is estimated to displace six breeding territories of skylark (a farmland bird of conservation concern), yet the Planning Statement acknowledges only 'partial mitigation' in the south-eastern field of the Northern Parcel. Leaving residual breeding territory displacement unmitigated risks non-compliance with Rushcliffe LPP1 Policy 17 and LPP2 Policy 38.
cd-24-planning-statement-pt-1-feb-25.pdf (p. 86): “There will be partial mitigation for the six displaced skylark territories in the Northern Parcel,”
Remediation: Quantify the exact breeding territory capacity of the Northern Parcel meadow plot against the six displaced territories and secure additional dedicated skylark plots (on-site or via S106 off-site agreement) to achieve full mitigation.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Seven of 15 ponds within 250 m excluded from GCN HSI/eDNA surveys
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-058
Of 15 ponds identified on site and within 250 m, only 8 were subject to HSI and eDNA surveys (4 positive for Great Crested Newt, including 1 on-site pond), while two were dry, one contained hazardous slurry, and others lacked access. Although 50 m buffers are applied, hedgerow removals and 7.15 ha of modified grassland clearance rely on a non-licensed precautionary method statement without population-size class data or District Level Licensing confirmation.
cd-24-planning-statement-pt-1-feb-25.pdf (p. 90): “of the recorded ponds, 8 were subject to HSI assessments and eDNA sampling as these were the ponds for”
Remediation: Confirm whether Natural England District Level Licensing (DLL) or a European Protected Species Mitigation Licence (EPSL) is required for works within 250 m of positive/unsurveyed GCN ponds, and submit population size-class surveys or a signed DLL certificate pre-determination.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION HGV passing places scoped via OS mapping only with contradictory permanence
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-059
In response to NCC pre-application advice regarding narrow stretches of Wysall Road and Bradmore Road where a 16.5 m HGV and car cannot pass, the proposal relies on OS Mapping rather than topographic highway-boundary surveys to locate 4 passing places. Furthermore, the Planning Statement contradicts itself on whether the passing places are 'temporary' (para 7.52) or 'remain in place' permanently (para 5.61 and 7.52).
cd-24-planning-statement-pt-1-feb-25.pdf (p. 68): “based on OS Mapping. This review found that an HGV and a Car can pass on Pendock Lane,”
Remediation: Verify carriageway and highway boundary widths via topographic survey, submit swept-path and Stage 1 Road Safety Audit confirmation for the 4 passing places, and clarify whether they are temporary or permanent highway works.
HYGIENE_ADVISORY AI Verified: TRUE_CONTRADICTION Cumulative BS 4142 noise impact relies on unverified proxy for Highfields
TECH_EH_GEOTECH_GAP | F-FC-060
Because consented adjacent Highfields Solar Farm (22/00303/FUL) had no Noise Impact Assessment and its Condition 23 plant specifications are not yet discharged, no quantitative cumulative noise calculation could be completed. The assessment relies on a qualitative assumption that Highfields will generate a similar rating level (+3 dB combined) at Nouvelle Farm and Highfields receptors.
cd-24-planning-statement-pt-1-feb-25.pdf (p. 78): “yet to be discharged, therefore a detailed calculation of cumulative effects cannot be”
Remediation: Secure a pre-commencement acoustic verification condition requiring updated BS 4142 cumulative noise modelling once final plant specifications for both Old Wood Energy Park and Highfields Solar Farm are confirmed, and reconcile the hedgerow removal figure (30 m at para 7.140 vs c.25 m at para 7.306).
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION BESS ~3 m container spacing falls below NFCC 2023 6 m separation without referenced BSMP
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-061
While Section 5.17 states the layout incorporates 'as many recommendations as possible' from the 2023 NFCC guidance on utility-scale BESS, Section 5.23 specifies only an ~3 m gap between containerised battery units and inverter units. This is below the standard NFCC 6 m separation distance to prevent thermal runaway propagation, and the DAS neither specifies fire-rated blast walls nor references a submitted Outline Battery Safety Management Plan.
cd-22-design-and-access-statement.pdf (p. 18): “• There will be a gap of around 3m between each containerised battery units and proposed inverter units.”
Remediation: Submit an Outline Battery Safety Management Plan demonstrating full compliance with 2023 NFCC guidance, either increasing inter-container/inverter separation to >=6 m (and >=10 m from boundaries/sensitive receptors) or providing substantiated thermal/blast-wall and firewater containment engineering.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unfixed 'Rochdale Envelope' design and 'For Information Only' layout on Full Application
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-062
Despite being submitted as a Full Planning Application, Section 4 uses a Rochdale Envelope leaving precise infrastructure layout, panel heights, and BESS technology unfixed for post-consent approval, and Appendix 1 (Site Layout Plan) is marked 'For Information Only' (Status S0, dated 18/05/2023). Full planning permission requires fixed, enforceable layout and elevation drawings rather than indicative parameters.
cd-22-design-and-access-statement.pdf (p. 13): “4.4. It follows that it has not been possible for the Applicant to fix all of the design details at this stage. The Applicant has therefore sought to incorporate sufficient design flexibility. This relates to the dimensions and layout of structures forming part of the Development, including the precise layout of the infrastructure and the maximum height of the solar panels.”
Remediation: Replace the 'For Information Only' Status S0 layout drawing with formal 'For Approval' full application site layout, elevation, and equipment parameter drawings defining fixed maximum envelopes and exact siting.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Zero freeboard at maximum 1,200 mm surface water flood depth and metric typo
TECH_DRAINAGE_SUDS_GAP | F-FC-063
Section 4.5 reports maximum surface water flood depths in parts of the Northern Parcel of 900–1200 mm (with a typo '300m' earlier in the paragraph), yet states panels will be raised to 1.2 m to the lowest edge on the basis of '0.9m flood depth and 0.3m freeboard'. Where flood depths reach 1,200 mm (1.2 m), a 1.2 m lowest panel edge provides zero freeboard.
cd-22-design-and-access-statement.pdf (p. 13): “However, some areas within the northern parcel are identified to have maximum surface water flood depths of 900-1200mm. The height of the panels will be installed to respond directly to overall site topography, meaning that within the areas of maximum surface water flood depths, at worst case the panels would be raised to approximately 1.2m to the lowest edge of the panels, 0.4m higher than elsewhere on the site. This allows for 0.9m flood depth and 0.3m freeboard and would result in an overall worst case panel height of 3.5m.”
Remediation: Reconcile the maximum modelled 1-in-1000-year surface water flood depth against the FRA and increase minimum panel clearance in affected Northern Parcel zones to >=1.5 m (or demonstrate 300 mm freeboard above exact peak modelled levels).
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Security lighting proposed without ILP GN 01/21 lux contours near BRP hedgerows
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-064
Sections 5.24 and 6.4 propose downwards-facing timer/motion-activated security lighting on electrical housings and buildings alongside infrared CCTV, while Section 5.23 identifies hedgerow trees with low, moderate, and high Bat Roost Potential (BRP). The DAS does not reference an external lighting lux contour plan or ILP GN 01/21 / GN 08/23 compliance to verify dark-corridor protection.
cd-22-design-and-access-statement.pdf (p. 20): “• Timer motion sensor activated security lighting to be installed on proposed electrical housing and buildings, enabling the visibility for any unscheduled maintenance. Any installed lighting will be downwards facing to limit any light emittance when lit.”
Remediation: Submit a detailed external lighting specification and lux contour plot in accordance with ILP GN 01/21 and GN 08/23 demonstrating zero light spill onto BRP trees, hedgerows, and Old Wood SINC.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Internal contradictions on MV inverter totals and cable exit boundary
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-065
Section 5.24 states 'The 35no. MV inverter units located across both the Northern Parcel (17 No.) and Southern Parcel (8 No.)', whereas 17 + 8 equals 25 (conflating solar MV inverters with the 35 containerised battery inverters listed in 5.21). In addition, Section 2.3 states the inter-parcel cable exits from the western side of the Northern Parcel, contradicting Section 1.2 which states the eastern side.
cd-22-design-and-access-statement.pdf (p. 19): “The 35no. MV inverter units located across both the Northern Parcel (17 No.) and Southern Parcel (8 No.) would be a similar size and appearance to the proposed battery containers”
Remediation: Issue an addendum/corrigendum to the DAS correcting the MV inverter total (25 vs 35), clarifying the exact Northern Parcel cable exit point against the Site Layout Plan, and ensuring consistency across all submission documents.
HYGIENE_ADVISORY AI Verified: TRUE_CONTRADICTION April 2022 RBC Pre-application advice directives not itemised in DAS
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-066
Section 5.5 notes that the scheme was the subject of a Pre-application Advice Request to Rushcliffe Borough Council in April 2022, but neither Section 3 nor Section 5 sets out the Council's specific pre-application directives or provides an audit table confirming how each officer requirement was addressed.
cd-22-design-and-access-statement.pdf (p. 14): “5.5. The initial site extent was that originally used to define the scope of the Development and application boundary which was subject to Pre-application Advice Request from RBC in April 2022.”
Remediation: Provide a concise Pre-Application Compliance Matrix (within the Planning Statement or DAS addendum) cross-referencing each April 2022 RBC pre-app comment to the final submitted plans and technical reports.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unfinalised Skylark Territory Displacement Mitigation on Full Application
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-067
The report identifies 7 to 9 skylark territories (a red-listed Section 41 SPI) across 10 of 12 arable fields and projects the displacement of 3 to 4 territories, yet defers mitigation design to the EcIA and relies on unquantified assumptions ('probable that a proportion... can be mitigated for') and increased carrying capacity of surrounding fields. On a full detailed application, specific, quantified on-site or off-site skylark mitigation plots must be secured and mapped rather than left as an unverified assumption.
cd-114-breeding_bird_survey_old_wood_solar_v20-1799530.pdf (p. 22): “It is estimated that there are between seven and”
Remediation: Provide a quantified, spatially mapped Skylark Mitigation Strategy (specifying exact area, dimensions, and sward management of open unpanelled skylark plots or off-site compensatory habitat) reconciled with the site layout and BNG metric prior to determination.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Omission of Nocturnal Owl Surveys Despite Schedule 1 Desk Records and Adjacent Breeding
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-068
Nocturnal bird surveys were omitted, leaving on-site owl activity undetermined and reliant solely on desk study and habitat judgement. Given NBGRC 2 km records of WCA Schedule 1.1 Barn Owl and Short-eared Owl, plus confirmed juvenile Tawny Owls in adjacent woodland during Survey 3, nocturnal foraging or roosting usage of the site's farm buildings and field margins has not been empirically verified.
cd-114-breeding_bird_survey_old_wood_solar_v20-1799530.pdf (p. 5): “Nocturnal bird surveys were not undertaken and as such the activity on Site of birds such as owls cannot be”
Remediation: Cross-check farm buildings and mature boundary trees for barn owl roost/nest potential (e.g., via PEA/bat roost inspections) and undertake targeted dusk/nocturnal vantage surveys or confirm appropriate buffer and foraging-strip mitigation in the EcIA.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Sole Access Through Flood Zone 2/3, Safe Refuge & Flood Emergency Plan Deferred on Full Application
TECH_DRAINAGE_SUDS_GAP | F-FC-070
For this FULL_DETAILED application classified as Essential Infrastructure (solar, BESS, and substation), the only vehicular access to the Southern Parcel crosses ~100 m of Flood Zone 2 and Flood Zone 3 around Kingston Brook. Despite NPPF paragraphs 181(e)/183(e) and NPPG Table 1 requiring safe access/escape and operational safety in times of flood, the report provides no flood depth/hazard assessment along the access track and defers the track specification, the Flood Emergency Management Plan, and even whether a 'safe refuge' is required to post-consent detailed design/condition.
cd-311-r003v1-pl-flood-risk-sequential-assessment-and-exception-test-v5-final.pdf (p. 26): “Safe access and emergency routes (and possible incorporating a safe refuge in the southern parcel should this be necessary) can be secured by a Flood Emergency Management Plan through a condition as required by part e).”
Remediation: Submit pre-determination flood depth, velocity, and hazard mapping along the ~100 m Flood Zone 2/3 Southern Parcel access route together with a draft Flood Emergency Management Plan confirming safe access/egress thresholds or the exact location and design of a Flood Zone 1 safe refuge.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unsurveyed LiDAR Watercourse Widths, Unfinalised Crossing Designs & Missing Section 23 Consent Evidence
TECH_DRAINAGE_SUDS_GAP | F-FC-071
On a FULL_DETAILED application, all three proposed Ordinary Watercourse crossings—including replacement of the existing culvert and bridge over Kingston Brook within Flood Zone 2/3—have no finalised engineering or hydraulic designs, and easements are based on LiDAR-estimated channel widths (5 m and 6 m) rather than topographic channel survey. Furthermore, no Ordinary Watercourse Consent (Section 23 Land Drainage Act) or LLFA/IDB consent-in-principle is evidenced to verify that the clear-span structures will not obstruct flows or reduce flood storage.
cd-311-r003v1-pl-flood-risk-sequential-assessment-and-exception-test-v5-final.pdf (p. 24): “These easements have been based on LiDAR data and an estimated width of 5m for most Ordinary Watercourses and 6m for the Kingston Brook. Development works within the easement (i.e. watercourse crossings), will be subject to Ordinary Watercourse Consent.”
Remediation: Provide topographic cross-sectional surveys of Kingston Brook and the other Ordinary Watercourses, finalised general arrangement and hydraulic soffit/clear-span sizing drawings for all three crossings, and written confirmation or consent-in-principle from the LLFA under Section 23 of the Land Drainage Act 1991.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Reduced 3 m Watercourse Easement vs Local Plan Policy 19 10 m Buffer & Deferred Management Plan
TECH_DRAINAGE_SUDS_GAP | F-FC-072
Local Plan Part 2 Policy 19 requires a minimum 10 m buffer free of built development between watercourses and the development site where physically feasible, supported by a long-term landscape and ecological management plan. However, the submission applies only a 3 m top-of-bank easement across Ordinary Watercourses, acknowledges development site encroachment within 10 m of watercourses, and defers the required buffer management plans to conditions without demonstrating physical infeasibility for the wider 10 m buffer.
cd-311-r003v1-pl-flood-risk-sequential-assessment-and-exception-test-v5-final.pdf (p. 27): “Further, as the watercourses themselves are free from built form, the proposal for the buffers adjacent to these watercourses include long term landscape provision and ecological management plans that can be secured by a planning condition(s).”
Remediation: Provide a site-wide watercourse buffer constraints plan demonstrating where a 10 m buffer under Policy 19 is physically unfeasible (beyond the existing Kingston Brook access/pylon) and submit the long-term landscape and ecological management plan for the watercourse buffers prior to determination.
HYGIENE_ADVISORY AI Verified: TRUE_CONTRADICTION Unconfirmed Foundation Type and Runoff Arrangement for Inverters and Auxiliary Transformers
TECH_DRAINAGE_SUDS_GAP | F-FC-073
On a FULL_DETAILED submission, the report leaves open whether distributed central inverters will be mounted on concrete plinths or screw piles and states that the same approach is merely 'expected' for auxiliary transformers subject to detailed design. Concrete plinths introduce impermeable footprint and potential overland flow obstruction compared with elevated screw piles, leaving site-wide impermeable area assumptions unfinalised.
cd-311-r003v1-pl-flood-risk-sequential-assessment-and-exception-test-v5-final.pdf (p. 23): “It is proposed to Site the central inverters dispersed across the Site on concrete plinths or screw piles off the ground with permeable areas beneath. Runoff from the container’s roof will therefore be able to discharge into the surrounding ground, as per existing. It is expected that the same approach is taken for auxiliary transformers. To be confirmed at detail design stage.”
Remediation: Confirm the final foundation type (concrete plinths vs screw piles) for all central inverters and auxiliary transformers and verify that any impermeable plinth areas are accounted for in the FRASWDS runoff calculations.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Northern Parcel northbound visibility splay uses 43.6 mph instead of ATC 1 recorded 47.0 mph 85th percentile speed
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-074
Appendix J calculates the Northern Parcel northbound Stopping Sight Distance using an 85th percentile speed of 43.6 mph (producing a 2.4 m x 119 m splay on Drawing 2303076 - 04 B), whereas Appendix I (Wysall ATC 1, Bradmore Road N, Channel 1 Northbound) records a 7-day average 85th percentile speed of 47.0 mph (5-day mean 47.3 mph). Because the southbound calculation uses ATC 1 Channel 2's full 7-day 85th percentile speed of 47.2 mph (134 m splay), the northbound splay appears under-calculated by approximately 14 m.
cd-1161-transport_statement_part_2-1799529.pdf (p. 28): “85th %ile Speed (mph) 43.6 Surveyed Speed (mph) 43.6”
Remediation: Re-calculate the Northern Parcel northbound SSD using the verified ATC 1 northbound 85th percentile speed (47.0 mph 7-day / 47.3 mph 5-day) and update Drawing 2303076 - 04 B accordingly.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Visibility splay plans omit highway boundary, hedgerow clearance extents, and Southern Parcel SSD calculation
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-076
Appendices K and L (Drawings 2303076 - 04 B and 2303076 - 02 A at 1:1000 scale) plot visibility splays of 2.4 m x 134 m / 119 m (Northern Parcel) and 2.4 m x 215 m (Southern Parcel) without delineating the adopted highway boundary, applicant land ownership, or any hedgerow/vegetation removal extents required to maintain unobstructed sightlines. Furthermore, no SSD calculation appendix is included to justify the Southern Parcel visibility splay despite ATC 2 data being provided in Appendix I.
cd-1161-transport_statement_part_2-1799529.pdf (p. 32): “2.4m by 215m visibility splay”
Remediation: Submit detailed visibility splay drawings showing adopted highway boundaries, land-control boundaries, and hedgerow/vegetation clearance extents within highway or applicant land, alongside the Southern Parcel SSD calculation referencing ATC 2.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Bradmore Road passing places lack adoptable highway specifications and completed drawing status
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-077
Drawings 2303076 - 06 and TK26 to TK29 illustrate four proposed passing bays along Bradmore Road with 16.5 m articulated HGV swept path overlays, but provide no adoptable pavement construction specifications, kerb/verge tie-in or drainage details, or confirmation of highway boundary limits, and leave 'Drawing Status:' blank. For a full/detailed application, permanent or temporary off-site passing bays within the highway corridor require defined engineering and land-control details.
cd-1161-transport_statement_part_2-1799529.pdf (p. 2): “Swept Path Analysis - 16.5m HGV”
Remediation: Provide detailed engineering drawings for all four passing places (TK26-TK29) showing highway boundary extents, adoptable construction/drainage details, and formal drawing status.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION BNG River Unit Net Loss (-2.35%) & Invalid Cross-Module Offsetting Claim
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-078
The Biodiversity Impact Assessment using Natural England Metric 4.0 forecasts a net loss of -0.06 river units (-2.35%) on Kingston Brook due to the new HGV prefabricated bridge, and Section 3.8.4 erroneously claims that area habitat (+80.65%) and hedgerow (+62.34%) gains offset this river loss. Under BNG trading rules and Rushcliffe Core Strategy Policy 17 / Local Plan Part 2 Policy 38, watercourse unit losses cannot be traded or offset by area or hedgerow units, resulting in a statutory/policy net loss in the rivers module (and Appendix C calculation tables are blank/unreadable in the submission PDF).
cd-111-ecological_impact_assessment-1800371.pdf (p. 69): “Due to the addition of a prefabricated bridge over the Kingston Brook in order to accommodate heavy goods vehicles throughout construction and within the operational life of the solar site, there will be a slight loss of -0.06 river units, leading to an overall loss of -2.35% within the metric.”
Remediation: Re-assess and update the BNG calculation (using the Statutory Biodiversity Metric if applicable) to eliminate the river unit loss through on-site riparian/in-channel enhancement along Kingston Brook (e.g., invasive species eradication, bank re-profiling/naturalisation, buffer enhancement) or secure verified off-site watercourse units, and submit the complete unlocked metric spreadsheet and legible Appendix C tables.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Out-of-Season (January) Habitat Walkover, Retrospective BNG Condition & No Reptile Survey
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-079
The sole habitat walkover was undertaken on 28 January 2022—outside the optimal April–October botanical season—and both the Phase 1-to-UKHab translation and BNG baseline condition assessments were completed retrospectively from winter notes rather than in-season field condition surveys. Furthermore, no targeted reptile presence/absence surveys were undertaken despite the January walkover being unsuitable for reptiles and the proposals removing 2.3ha of modified grassland in Fields 12 and 13 plus 30m of hedgerow.
cd-111-ecological_impact_assessment-1800371.pdf (p. 17): “Although the survey was conducted in January, which is outside the optimal time for a Phase 1 habitat survey (April to October inclusive), it was possible to adequately classify and assess the nature conservation value of the habitats involved due to the evidently low distinctiveness of the habitats present (predominantly arable fields and modified grassland).”
Remediation: Conduct an in-season (April–September) UKHab and BNG condition verification survey across all fields, margins, ditches and hedgerows to validate the January 2022 baseline (now over two years old) and undertake targeted reptile presence/absence surveys (or justify robust precautionary mitigation agreed with the LPA ecologist) for Field 13 and suitable boundary margins.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Positive GCN eDNA Ponds Without Committed EPS/DLL Licensing & Contradictory Pond Results
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-080
Four ponds within 250m (including on-site Pond 10) returned positive GCN eDNA results while four further ponds within 250m (Ponds 5–8) remain unsampled due to access refusals, and the report contains internal contradictions on whether Pond 13 or Pond 14 is positive (pages 6 and 38 list Pond 13 as positive, page 38 also lists Pond 13 as negative, page 60 lists Pond 14 as positive, and page 61 states Pond 13 is negative). Despite Rushcliffe pre-app advice (22/00709/ADVICE) flagging medium GCN risk and the proposals removing 30m of hedgerow, 2.3ha of modified grassland, and 1.3ha for the BESS, the EcIA relies on a non-licensed risk avoidance method statement rather than committing to a Natural England EPS mitigation licence or District Level Licensing (DLL) pathway.
cd-111-ecological_impact_assessment-1800371.pdf (p. 63): “Clearance of the four hedgerow sec tions should be undertaken using a precautionary approach, which will be specified within the CEMP (Ecology) under a non-lic ensed risk avoidance method statement.”
Remediation: Reconcile the eDNA laboratory results for Ponds 13 and 14 across all report sections and Figure 7, confirm whether any works or cabling fall within 250m of positive/unsampled ponds, and secure either a Natural England District Level Licensing (DLL) Impact Assessment & Conservation Payment Certificate or a clear EPS mitigation licence strategy (demonstrating the three Habitats Regulations licensing tests) prior to determination.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unmitigated Displacement of Six Breeding Skylark Territories & Inconsistent Mitigation Area
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-081
Removing 94.5ha of arable land will displace six of eight breeding skylark (NERC Act s.41 Priority Species, Red-listed) territories on Site, with the EcIA acknowledging only partial on-site mitigation and predicting a cumulative adverse residual displacement effect at a Local scale when combined with adjacent solar farm 22/00303/FUL. In addition, the skylark mitigation plot is inconsistently specified as 2.39ha in the Executive Summary (page 5), 3.62ha in Field 7 (pages 50 and 74), and 3.62ha in Field 8 (page 66).
cd-111-ecological_impact_assessment-1800371.pdf (p. 67): “The loss of 94.5ha of nesting habitat (arable land) for skylark will not be entirely mitigated for within the proposals; however, the seeding of species-rich grassland within the Site will likely provide a positive effect on foraging habitat for all bird species.”
Remediation: Clarify the exact location, field number, and area (2.39ha vs 3.62ha) of the retained skylark mitigation plot across the EcIA and Landscape Strategy, and either expand on-site skylark nesting plots or secure off-site farmland bird compensation (e.g. skylark plots on adjacent arable land via S106/management agreement) to achieve full mitigation for the six displaced territories under Rushcliffe Policy 38.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Deferred Operational Lighting Assessment & Omitted Baseline Bat Activity Surveys
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-082
Although 13 trees with bat roosting potential (mostly moderate), three EPS bat mitigation licences within 2km, adjacent ancient woodland (Bunny Old Wood LWS), and connected hedgerow corridors were identified, no baseline nocturnal bat activity or static detector surveys were carried out. On this full detailed application, whether permanent operational lighting will be installed and whether a Sensitive Lighting Strategy is needed to prevent light spill on bat corridors remain unfinalised and deferred to post-consent discussion.
cd-111-ecological_impact_assessment-1800371.pdf (p. 58): “Equally, should permanent lighting be required during the operational phase of the solar farm, this will also be discussed with an ecologist.”
Remediation: Confirm definitively whether any operational security/substation/BESS lighting is proposed (noting Figure 8/Landscape Strategy includes CCTV/Lighting Posts) and submit a pre-determination Sensitive Lighting Strategy (e.g. dark-corridor lux contour plan demonstrating <1 lux along all boundary hedgerows, Kingston Brook and Bunny Old Wood LWS) alongside bat activity verification if lighting cannot be wholly excluded.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Pre-Application Energy Policy Appendix Unupdated for Full Application and Missing Local Policy / Site-Specific Assessment
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-084
Although submitted as Part 2 of the Planning Statement for a full planning application (PP-12653175), Appendix 2 is dated February 2024 and explicitly states it accompanies a 'pre-application advice request'. Furthermore, while Section 1.2 states the report highlights 'central and local Government's policy', the document contains only national and international policy/statistics (Sections 3-5) with no Rushcliffe local policy assessment, project capacity metrics (MW/MWh), or site-specific compliance demonstration against the UK Energy Security Strategy directive (para 3.22) to locate on previously developed or lower value land.
cd-241-planning-statement-pt2-feb-25.pdf (p. 3): “This Energy Policy Statement has been prepared by Pegasus on behalf of Exagen Development Ltd and should be read in conjunction with the supporting Planning Statement and other technical documents that accompany the pre-application advice request.”
Remediation: Confirm whether an updated Planning Statement Part 1 or addendum addresses current local Rushcliffe Development Plan policies, post-2023 national energy policy updates, and site-specific Agricultural Land Classification / greenfield mitigation compliance, and update Appendix 2 references from pre-application advice to the full planning submission.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Positive GCN eDNA Ponds Lack Committed DLL or EPS Licence Pathway and Pond Results Conflict
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-085
Four ponds returned positive GCN eDNA results (including on-site Pond 10) and four off-site ponds within 250m (Ponds 5–8) remain unsampled, yet the scheme removes 31m of hedgerows and 94.89ha of land (including 1.3ha for the BESS) under a non-licensed risk avoidance method statement without a committed District Level Licensing (DLL) or Natural England EPS mitigation licence pathway. In addition, the report contains conflicting eDNA results—identifying Pond 13 as positive on pp. 5 and 37 (where Pond 13 is simultaneously listed as negative), whereas pp. 59–60 identify Pond 14 as positive and Pond 13 as negative.
cd-217-ecia-oct-2024.pdf (p. 62): “Clearance of the four hedgerow sections should be undertaken using a precautionary approach, which will be specified within the CEMP (Ecology) under a non-licensed risk avoidance method statement. This will include a pre-removal check of the feature by a suitably experienced ecologist in order to locate and remove any amphibians which may be present. In the highly unlikely event that a GCN is encountered during the removal of hedgerows, the attendant ecologist will advise of the necessary course of action. A licence from Natural England may be required in order to permit works to continue.”
Remediation: Reconcile all GCN eDNA pond results across the text, figures, and tables (clarifying Ponds 13 and 14), confirm whether works within 250m of positive/unsampled ponds (including hedgerow and BESS clearance) require a Natural England DLL certificate or EPS mitigation licence, and secure the agreed licensing pathway prior to determination.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Unmitigated Residual Loss of Six Priority Skylark Territories and Conflicting Mitigation Field
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-086
The development displaces six of eight recorded breeding territories of skylark (a NERC Act s.41 Priority Species and Red-listed bird) across 94.89ha of arable land, providing only 3.62ha of partial on-site mitigation and leaving an acknowledged adverse residual effect at Site level (and Local level cumulatively with adjacent permitted solar farm 22/00303/FUL). Furthermore, the report contradicts itself on the mitigation plot location, stating 'Field 7' on pp. 50 and 73 versus 'Field 8' on p. 65.
cd-217-ecia-oct-2024.pdf (p. 66): “The loss of 94.89ha of nesting habitat (arable land) for skylark will not be entirely mitigated for within the proposals; however, the seeding of species-rich grassland within the Site will likely provide a positive effect on foraging habitat for all bird species. It should also be noted that there are a maximum of eight skylark territories within the Site, six of which are estimated to be displaced, which is considered likely to be a small proportion of local population, especially due to the large extent of similar suitable habitat within the wider landscape. Consequently, while an adverse residual effect on skylark is predicted, it is likely only significant at a Site level.”
Remediation: Clarify and fix the exact parcel location (Field 7 vs Field 8) on an updated landscaping plan, provide off-site or additional in-parcel skylark mitigation plots sufficient to fully offset the six displaced territories and cumulative Local-scale impact, and secure a binding management prescription before determination.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Out-of-Season January Habitat Survey and Retrospective UKHab/BNG Condition Assessment
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-087
The Extended Phase 1 Habitat Survey was conducted on 28 January 2022—outside the optimal April–October botanical season—and UKHab habitat translations and Statutory BNG condition assessments were completed retrospectively from 2022 notes rather than via in-field UKHab condition surveys. On a full/detailed application, this introduces baseline uncertainty into the Statutory BNG Metric calculations and hedgerow/grassland condition scores.
cd-217-ecia-oct-2024.pdf (p. 17): “As such, habitat classification (translation from Phase 1 to UK Hab) and condition assessments were undertaken retrospectively rather than in the field.”
Remediation: Undertake an in-season (April–October) UKHab habitat verification and field condition assessment across all parcels, margins, and hedgerows to validate the Statutory BNG baseline prior to determination.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unverified Statutory BNG Condition Assumption for Under-Panel Grassland and Deferred HMMP/LEMP
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-088
The Statutory BNG Metric claim (+81.94% area habitat units) relies on classifying ~66.4ha of under-panel modified grassland as 'fairly poor' condition despite explicitly assuming it will not reach the 8–10 species/m2 threshold, while the LEMP/HMMP needed to verify and secure 30-year habitat creation and management is wholly deferred to a planning condition. Under Statutory BNG rules, condition assumptions must be demonstrably achievable and backed by a pre-determination HMMP/LEMP on a full application.
cd-217-ecia-oct-2024.pdf (p. 69): “It is also assumed that, although the newly seeded modified grassland has been assumed as unlikely to reach the necessary 8-10 species per m2, it has been classed as ‘fairly poor’ due to the quality of the new seed mix to be sown, making it likely to be of a higher biodiversity value than modified grassland in ‘poor’ condition.”
Remediation: Submit a draft 30-year Habitat Management and Monitoring Plan (HMMP/LEMP) and re-run the Statutory BNG Metric using defensible condition criteria (or sensitivity-test 'poor' condition for under-panel grassland) alongside the full Statutory Metric spreadsheet.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Out-of-Season January Reptile Assessment Without Presence/Absence Surveys
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-089
The reptile habitat assessment was undertaken solely during the January 2022 walkover—outside the active reptile survey season—and no seasonal presence/absence surveys were conducted despite suitable habitat in Field 4, Field 12, and Field 13 and the proposed loss of 2.3ha of modified grassland and 31m of hedgerow. Relying on a winter walkover and precautionary ECoW clearance does not establish baseline reptile status.
cd-217-ecia-oct-2024.pdf (p. 39): “The initial walkover survey was undertaken in January which is outside the suitable season to survey for reptiles.”
Remediation: Carry out seasonal reptile presence/absence surveys (April–September) across suitable boundary margins and Fields 12–13, or provide a fully justified species-specific reptile mitigation method statement.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION No Baseline Bat Activity Surveys Despite 13 BRP Trees, Hedgerow Removal, and Adjacent Ancient Woodland
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-090
No foraging or commuting bat activity surveys (walked transects or static detectors) were conducted despite 13 BRP trees, 31m of hedgerow removal, 3 EPS bat licences within 2km, local barbastelle records, and direct adjacency to Bunny Old Wood ancient woodland and Intake Wood LWS. Assuming impacts are avoided solely via buffers omits baseline data on dark corridors and potential solar-panel acoustic trap/barrier effects.
cd-217-ecia-oct-2024.pdf (p. 57): “No further surveys to ascertain the baseline use of the Site by foraging / commuting bats are recommended, as impacts will be avoided.”
Remediation: Conduct seasonal bat activity (transect and static detector) surveys along key hedgerows, Kingston Brook, and adjacent woodland edges in accordance with BCT Good Practice Guidelines to verify dark-corridor protection.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unfinalised Security Fencing Mammal Permeability and Inconsistent Watercourse Buffers
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-091
On a full/detailed application, perimeter security fencing is not finalised to guarantee mammal permeability for badgers (7 setts present) and brown hares, relying on ground undulations or conditional 10cm gaps (insufficient for badgers). Additionally, the report cites conflicting riparian buffer widths for ditches and streams (10m minimum on pp. 51 and 53 versus 8m minimum on p. 57) while proposing a new HGV bridge disturbing Kingston Brook banks.
cd-217-ecia-oct-2024.pdf (p. 56): “It is likely that natural undulations in the ground will be sufficient to enable badgers (and other small mammals such as brown hares) to pass underneath Site fencing and use the grassland for foraging. However, should the security fencing used be a style that may prevent badgers from accessing the Site (i.e. rigid fencing that fits tightly to the ground), gaps of approximately 10cm will be provided to encourage badgers to excavate beneath the fence whilst ensuring that the fence remains livestock-proof.”
Remediation: Specify standard badger/mammal gates or a >=20cm fence-bottom clearance on detailed perimeter fencing drawings, and standardise a minimum 10m riparian no-development buffer (outside the free-span bridge footprint) across all plans and reports.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Omitted Figure 8 Landscaping Plan, Stale 2022 Surveys (>12 Months), and Deferred Pre-App Lighting Scheme
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-092
Figure 8 (referenced throughout the October 2024 EcIA as illustrating the updated development proposals and western wildlife corridors) is missing from the report and its index of figures/appendices, and the separate 2023 Breeding Bird Survey report is not attached. Furthermore, the 2022 baseline surveys exceed the report's own 12-month review threshold (Section 1.1.5), and the wildlife-sensitive lighting scheme requested in Rushcliffe pre-application advice (22/00709/ADVICE) is deferred as 'if necessary'.
cd-217-ecia-oct-2024.pdf (p. 8): “Development proposals are shown in Figure 8. Any changes to the proposed design and layout and landscaping made subsequent to publication of this report should be issued to Clarkson and Woods Ltd. for review.”
Remediation: Submit the omitted Figure 8 landscaping/development plan, attach the standalone Breeding Bird Survey report, provide an updated ecological walkover/survey validity confirmation for the 2022 surveys, and submit a wildlife-sensitive lighting scheme covering construction and operational phases.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Incomplete Detailed-Application Validation Scope (Missing BESS Safety, Glint & Glare, Noise, and BNG Metric)
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-093
For a 49.9 MW solar PV and ancillary battery energy storage (BESS) development, the proposed detailed planning application validation list at Section 1.11 omits an Outline Battery Safety Management Plan / NFCC firewater containment assessment, Glint and Glare Assessment, BS 4142 Noise Assessment (for inverters, transformers, and BESS cooling), ILP GN 01/21 External Lighting Assessment, and a statutory Biodiversity Net Gain (BNG) Metric calculation. In a full/detailed application context, these are mandatory pre-determination technical deliverables.
cd-432-pre-app-planning-statement.pdf (p. 6): “be adequate to satisfy the local validation requirements for a detailed planning application:”
Remediation: Expand the formal application validation package to include a standalone Outline BESS Safety Management Plan, Glint and Glare Assessment, BS 4142 Acoustic Assessment, ILP GN 01/21 Lighting Plan, and statutory Defra BNG Metric calculation.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Undetermined BESS/Substation Siting and Missing Referenced Parcel RAG Assessment
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-094
The statement leaves the conceptual layout, ancillary BESS, customer substation, and underground cable route undetermined (paras 4.3-4.4, 4.7), and references a 'colour coded assessment of the field parcels' / 'traffic light rating' submitted in support of the enquiry that is absent from the report appendices (which contain only Appendix 1 Site Location Plan and Appendix 2 Energy Policy Statement). Additionally, para 1.6 contains an orphaned text fragment referencing 49.5 ha across two parcels that conflicts with the 180 ha / 6-parcel site description.
cd-432-pre-app-planning-statement.pdf (p. 24): “advice request the applicant has prepared and submitted a colour coded assessment of the”
Remediation: Supply the missing parcel RAG constraints plan, finalise redline boundaries and fixed siting/elevations for the PV arrays, BESS compound, substation, and cable corridor, and correct the para 1.6 editorial error.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Sub-Optimal Winter Phase 1 Ecological Survey and Internal LNR Contradiction
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-095
The Extended Phase 1 Habitat Survey was conducted in late January 2022 (sub-optimal winter season for botanical, GCN, reptile, breeding bird, and bat assessments), yet para 1.11 only lists a 'Phase 1 Ecological Survey' for the full application without committing to seasonal Phase 2 protected species surveys. Moreover, para 3.50 erroneously claims no nationally designated sites lie within 2 km of Willoughby 2, directly contradicting para 3.51 which identifies Keyworth Meadow LNR (supporting great crested newts) at 1.6 km north-east.
cd-432-pre-app-planning-statement.pdf (p. 18): “Willoughby 2 study area. Furthermore, there are no nationally designated sites within 2km of”
Remediation: Undertake full optimal-season botanical and Phase 2 protected species surveys (including GCN HSI/eDNA, breeding/wintering birds, bats, badger, and riparian mammals), reconcile the Keyworth Meadow LNR contradiction, and provide a Defra BNG Metric.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Flood Zone 3 Encroachment Without Sequential Test or SuDS / Firewater Strategy
TECH_DRAINAGE_SUDS_GAP | F-FC-096
Both Willoughby 1 (along Kingston Brook) and Willoughby 2 (along the River Soar tributary adjacent to Wysall Road) contain areas within Flood Zone 3, yet paras 3.14 and 3.46 summarily assess flood risk as 'low risk' solely because most of the site is in Flood Zone 1. No NPPF Sequential Test demonstration, 100-year + climate change runoff/SuDS management train, exceedance routing, or BESS firewater containment strategy is provided.
cd-432-pre-app-planning-statement.pdf (p. 18): “the majority of the site is located within Flood Zone 1, the area least at risk of flooding, this is”
Remediation: Submit a site-specific Flood Risk Assessment and Drainage Strategy demonstrating Sequential Test compliance (excluding vulnerable BESS/substation infrastructure from Flood Zone 3), CIRIA C753 SuDS attenuation for impermeable footprints, and contained BESS firewater runoff.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unsubstantiated Construction Access, Visibility Splay, and PRoW Safety Claims
TECH_HIGHWAYS_RSA_ACTIVE_TRAVEL_GAP | F-FC-097
Paras 6.36-6.37 assert without quantitative trip data, swept path analysis, or visibility splay verification that existing agricultural field accesses and rural lanes can safely accommodate HGV construction deliveries and that traffic movements will be 'insignificant'. It also omits any assessment of HGV conflict, crossing safety, or temporary diversion/management for PRoWs traversing the site, including the Midshires Way.
cd-432-pre-app-planning-statement.pdf (p. 41): “generate an insignificant number of traffic movements along the local highway.”
Remediation: Provide a quantitative Construction Traffic Management Plan / Transport Statement incorporating HGV trip generation, swept path tracking at all proposed site accesses, verified DMRB visibility splays, passing-bay proposals where required, and a PRoW safety management scheme.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unfinalised 4–7 m Substation Parameters Excluded from 3.1 m SZTV Worst-Case Modelling
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-098
On a full planning application, the LVIA states that the 4–7 m substation equipment parameters are only indicative pending DNO requirements, while the SZTV worst-case model only tests 3.1 m height for solar and BESS modules. Consequently, the theoretical visibility of the tallest on-site structures (up to 7 m) has not been robustly modelled or fixed pre-determination.
cd-15-lvia-pt1.pdf (p. 13): “The proposed on-site substation will be subject to Distribution Network Operator (DNO) specific design requirements and the design and height parameters used in this LVIA are only indicative at this stage.”
Remediation: Confirm maximum substation dimensions and equipment heights with the DNO for this full application and rerun the SZTV and visual assessment at the true worst-case 7 m substation height.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Pre-App Residential Amenity Concern Addressed Without RVAA or Private Dwelling Surveys
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-099
Rushcliffe's pre-application advice (22/00709/ADVICE) explicitly flagged the need to protect the amenity, outlook, and setting of adjacent dwellings along Bradmore Road. Despite this, the LVIA excludes detailed residential visual amenity and private dwelling views from its scope, while still concluding moderate adverse Year 1 effects at Five Oaks Stables and Scotland Hill Farm based solely on distant public viewpoints.
cd-15-lvia-pt1.pdf (p. 5): “There should be sufficient distance to these properties not to adversely affect their amenity, outlook and setting.”
Remediation: Prepare a dedicated Residential Visual Amenity Assessment (RVAA) or verify outlook/setting impacts from the closest neighbouring dwellings (Lodge Farm, Field View, The Elms, Five Oaks Stables, Scotland Hill Farm) in accordance with the Pre-App response.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Unquantified Hedgerow Removal Risk from Potential 5 m Access Track Gate Widening
TECH_ECOLOGY_SURVEY_OR_STATUTORY_GAP | F-FC-100
The LVIA asserts that the layout avoids any tree or hedgerow removal by routing access tracks through existing gaps and field gates. However, it simultaneously notes that existing gaps or gates may need to be widened if narrower than the standard 5 m track width, leaving potential hedgerow loss unquantified and unassessed.
cd-15-lvia-pt1.pdf (p. 18): “There is the potential that the existing gaps / field gates would have to be widened to accommodate the proposed access tracks if they are narrower than the standard 5m width.”
Remediation: Measure all existing boundary and internal field gate openings along proposed 5 m access tracks and quantify any required hedgerow removal and replacement planting prior to determination.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Viewpoint Selection and Scope Not Agreed with LPA Prior to Submission
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-101
The consultant confirms that the LVIA scope, assessment approach, and viewpoint selection were not subject to detailed pre-application agreement with the Council, and that the same pre-application viewpoints (bar Viewpoint 5) were carried forward without LPA sign-off. This creates a risk of contested viewpoint coverage during determination, especially given the reduction of the study area to 1–1.5 km.
cd-15-lvia-pt1.pdf (p. 6): “In summary, the scope of work, assessment approach and viewpoint selection outlined in this LVIA had not been subject to any detailed pre-application consultation, but the Council's analysis - quoted above, provided sufficient information with regard to the anticipated study area/ focus of the assessment and potential constraints.”
Remediation: Seek formal confirmation from Rushcliffe Borough Council's landscape consultant on the sufficiency of the 8 viewpoints and 1–1.5 km study area, and provide supplementary viewpoints if requested.
HYGIENE_ADVISORY AI Verified: TRUE_CONTRADICTION Uncertain Landscape Character Area Boundary Identification from Illegible Online Maps
TECH_PREAPP_OPINION_OR_APPENDIX_GAP | F-FC-102
The LVIA acknowledges that the Greater Nottingham Landscape Character Assessment maps available on the Council's website are not legible, resulting in uncertainty in confirming the exact Regional Character Area and Draft Policy Zone boundaries ('It appears that the site falls within...'). Relying on illegible baseline maps undermines precision in policy and character zone boundary attribution.
cd-15-lvia-pt1.pdf (p. 21): “however, the maps are not legible, and it is difficult to identify the relevant Regional Character Areas with certainty.”
Remediation: Obtain high-resolution GIS or original PDF mapping of the Greater Nottingham Landscape Character Assessment from Rushcliffe Borough Council to confirm exact DPZ boundaries.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION Northern Parcel Visibility Splays Calculated Using Southern ATC Speed Data (43.5/44.8 mph vs 47.0/47.2 mph) and Omitted Peak Hours
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-001
The Transport Statement text (and the Design & Access Statement) claims that the 7-day 85th percentile speeds at the Northern Parcel access on Bradmore Road (surveyed 20-26 May 2023) are 43.5 mph northbound and 44.8 mph southbound, deriving visibility splays of 118m northbound and 123m southbound. However, the raw ATC survey data in Transport Statement Part 2 (cd-1161) reveals that 43.5 mph NB and 44.8 mph SB were actually recorded at ATC 2 (Bradmore Road South, surveyed 12-18 May 2023, page 25), whereas ATC 1 at Bradmore Road North (surveyed 20-26 May 2023, page 15) recorded higher 7-day 85th percentile speeds of 47.0 mph NB (5-day 47.3 mph) and 47.2 mph SB (5-day 47.5 mph). Furthermore, the Appendix J SSD calculation and Drawing 2303076-04 B (cd-1161 pages 28 & 30) mix one direction from each site to plot 2.4m x 134m and 2.4m x 119m splays, and the secondary speed summary sheets explicitly exclude the 07:00-09:00 and 16:00-18:00 commuter peaks. Statutory Impact: Severe highway safety risk and DMRB non-compliance at the Northern Parcel HGV access; triggers a Local Highway Authority (Nottinghamshire County Council) holding objection due to under-designed stopping sight distances for 16.5m articulated HGVs.
cd-211-transport-statement-june-2024.pdf (p. 16): “A 7 day 85th percentile speed of 43.5 miles per hour northbound and a 7 day 85th percentile speed of 44.8 miles per hour southbound. During the course of the ATC, no wet weather was experienced, therefore no wet weather adjustment has been applied, in line with DMRB guidance. This equates to 118m northbound and 123m southbound of visibility.”
cd-1161-transport_statement_part_2-1799529.pdf (p. 15): “85%ile Speed 48.6 43.8 53.5 43.3 48.0 43.2 48.5 47.3 47.0”
Remediation: Re-calculate the Northern Parcel Stopping Sight Distances using the correct 24-hour ATC 1 (Bradmore Road North) 85th percentile speeds (47.0/47.3 mph NB and 47.2/47.5 mph SB), update Drawing 2303076-04 B to show >=134m visibility splays in both directions within land controlled by the applicant or highway boundary, and reconcile the Transport Statement text.
SHOWSTOPPER AI Verified: TRUE_CONTRADICTION LVIA and Screened ZTV Model Maximum 3.1m Solar Panel Height vs 3.5m to 4.6m Flood-Mitigated Panel Heights in Northern Parcel
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-002
To mitigate surface water flood depths of 900-1200mm in the Northern Parcel, the Planning Statement and Design & Access Statement (cd-13 p.18) specify raising the lowest edge of the solar panels to 1.5m above ground (or 1.2m in cd-22 p.13), resulting in overall panel heights of 3.5m to 4.6m (3.8m at 20 degrees). Conversely, the LVIA (cd-15 p.12, p.30) and Screened ZTV (cd-152 p.6) model a strict maximum solar panel height of 3.1m across the entire site, and the updated FRA (cd-37 p.16 / cd-311 p.23) claims surface water flood depths never exceed 300mm and panels are only raised 800mm. The LVIA visibility mapping therefore fails to assess the visual envelope of the 3.5m-4.6m elevated arrays. Statutory Impact: Undermines the validity of the LVIA and Rochdale Envelope maximum parameters on a Full Detailed application, exposing the decision to legal challenge on unassessed landscape and visual impacts.
cd-15-lvia-pt1.pdf (p. 30): “The proposed solar modules and battery storage modules have been modelled at 3.1m in height across the site to represent the likely worst-case scenario for the majority of structures within the Development.”
cd-12-planning-statement-jan-2024.pdf (p. 98): “at worst case the panels would be raised to approximately 1.5m to the lowest edge of the panels (allowing 0.3m freeboard) resulting in an overall worst case panel height of 4.6m depending on panel tilt angle, however, in most instances panel heights in these areas will not exceed 3.8m (based on a panel angle of 20 degrees).”
Remediation: Reconcile the RoFSW surface water flood depth data across the FRA, Planning Statement, and DAS, fix a single binding maximum panel height parameter, and re-run the ZTV and LVIA viewpoint wirelines if panels exceed 3.1m.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION BS 4142 Operational Noise Rating Level Claimed as >=4 dB Below Background in Planning Statement vs +3 dB Above Night-Time Background in Noise Assessment
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-003
The Planning Statements (cd-12 p.78 and cd-24 p.78) assert that operational noise rating levels from the Development in isolation are at least 4 dB below background noise levels (and 1 dB below background cumulatively), representing a 'Low' impact across the site. However, the technical Noise Assessment (cd-120 p.12, p.14-15) establishes a night-time background sound level of 29 dB LA90 at Location 2 (representing NSRs 1-5 and 9) and predicts worst-case Rating levels of 32 dB(A) at NSR 1 and NSR 3 (Specific level 29 dB(A) + 3 dB distinctiveness penalty), which is +3 dB ABOVE the night-time background noise level (leaving only a 2 dB margin below the EHO's +5 dB target limit). The Planning Statement misrepresents specific/selected receptor figures at NSR 8/9 as the worst-case isolated impact. Statutory Impact: Misleads the Local Planning Authority and Environmental Health Officer regarding night-time acoustic impacts on the closest residential receptors (NSR 1 and NSR 3) and invalidates the claimed margin of compliance.
cd-120-noise_report_assessment-1799486.pdf (p. 15): “As Table 7 shows, despite the highly conservative approach taken in this assessment, Rating levels are predicted to be at least 2 dB below the EHO's assessment criterion of 5 dB above the representative background noise level, and at least 2 dB below the level of 'Adverse' impact specified in BS4142.”
cd-12-planning-statement-jan-2024.pdf (p. 78): “Predicted noise rating levels due to the Development in isolation at these receptors are at least 4 dB below the level of background noise.”
Remediation: Amend the Planning Statement noise summary to accurately report the worst-case +3 dB above night-time background rating level at NSR 1 and NSR 3, and ensure planning condition noise limits are tied to the exact BS 4142 rating thresholds at all nine NSRs.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION FRA Rules Out Infiltration SuDS Due to Clayey/Mudstone Ground Conditions Yet Relies on Infiltration Filter Trenches for Buildings and Permeable Access Tracks
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-004
In Section 7 of both the original FRA (cd-117 p.25) and updated FRA (cd-37 p.27), infiltration-based SuDS are explicitly ruled out across the site without BRE 365 testing because BGS and SoilScapes mapping confirm mudstone, alluvium, and loamy/clayey soils with impeded drainage. Despite ruling out ground infiltration, the very same drainage strategy relies entirely on un-outfalled 22.5m x 1.0m x 0.7m gravel filter trenches around the solar connection infrastructure buildings to dispose of roof runoff by 'aiding infiltration into the ground below' (p.29) and assumes access track and inverter plinth runoff will soak directly into the surrounding ground (cd-311 p.23). Statutory Impact: Unfulfilled engineering dependency that risks waterlogging, trench overtopping, and localised surface water flooding around high-voltage solar connection buildings; non-compliant with LLFA SuDS hierarchy standards.
cd-37-r001v6-in_p21-2533-fra-surface-water-drainage-strategy.pdf (p. 27): “These ground conditions are not considered suitable for infiltration-based SuDS. Therefore, infiltration-based SuDS have been ruled out as the source of surface water disposal.”
cd-37-r001v6-in_p21-2533-fra-surface-water-drainage-strategy.pdf (p. 29): “It is proposed to locate a filter drain 22.5m long, 1.0m wide and 0.7m deep around the proposed buildings. These gravel trenches will help store surface water runoff from the small buildings, aiding infiltration into the ground below.”
Remediation: Undertake on-site BRE Digest 365 soakaway testing at the solar connection building and access track locations, or provide a positive piped connection with restricted discharge to the ordinary watercourse network.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION 3m Ordinary Watercourse Easement in FRA Clashes with 10m Riparian Ecological Buffer and 8m Schedule 9 Himalayan Balsam Exclusion Zone
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-005
The Flood Risk Assessments (cd-117 p.22, cd-37 p.25, cd-311 p.24) design the drainage and development stand-off around all Ordinary Watercourses and Kingston Brook using only a 3m maintenance easement from the top of bank (asserting a maintenance easement of more than 3m is not necessary). In contrast, the EcIA (cd-111 p.54, cd-38 p.56) and DAS (cd-13 p.18) mandate a minimum 10m undeveloped buffer from ditches, streams, and Kingston Brook (and 8m in cd-217 p.57), plus a mandatory 8m biosecurity exclusion zone along Kingston Brook to prevent the unlawful spread of Schedule 9 Himalayan balsam during construction works (including at the outfall and bridge crossing). Statutory Impact: Risk of encroaching into statutory protected riparian buffers and committing an offence under Section 14 / Schedule 9 of the Wildlife and Countryside Act 1981 during attenuation basin outfall and watercourse crossing construction.
cd-37-r001v6-in_p21-2533-fra-surface-water-drainage-strategy.pdf (p. 25): “To ensure maintenance access is not impacted by the Development a 3m easement from the top of bank from all Ordinary Watercourses has been kept clear of all Development, with the exception of where watercourse crossings are proposed.”
cd-38-old-wood-energypark_ecia_v70.pdf (p. 74): “Prior to commencing work, stands of Himalayan balsam should be identified and a minimum 8m buffer zone”
Remediation: Update the FRA and engineering layout drawings to enforce a minimum 10m development-free buffer from top of bank on all watercourses, and map the 8m Himalayan balsam exclusion zones relative to the Kingston Brook bridge and basin outfall works.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Skylark Mitigation Land Contradicted Between Retained Arable (Field 8), 3.62 ha Wildflower Meadow (Field 7), and 10.37 ha / 28 ha Off-Site Land
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-006
Across the submission pack, the spatial location, habitat type, and quantum of skylark mitigation are mutually contradictory: (1) the Landscape Strategy drawing (cd-151 p.1) and original EcIA (cd-111 p.50) state that Field 8 is retained as 'arable land managed for nesting skylark'; (2) the updated EcIA (cd-38 p.55, p.75) states that all 94.89 ha of arable land is permanently removed and instead sets aside 3.62 ha in the eastern half of Field 7 (while Section 3.5.61 cites Field 8) seeded as wildflower meadow (20-50cm sward); (3) the Sequential/Exception Test report (cd-311 p.21) claims '10.37ha of Skylark mitigation land'; and (4) the Parameter Matrix (3375110-appeal-decision.pdf p.11) notes 3.62 ha on-site plus 28 ha (or 23 ha) of off-site skylark mitigation land. Statutory Impact: Creates fundamental uncertainty over how compensation for the displacement of 6 of 8 recorded breeding skylark territories (a Red-listed Section 41 Species of Principal Importance) is legally secured and whether the BNG metric double-counts the skylark plot as wildflower meadow.
cd-151-lvia-pt2.pdf (p. 1): “Retained arable land managed for nesting skylark”
cd-38-old-wood-energypark_ecia_v70.pdf (p. 55): “The eastern half of Field 7 will be set aside as skylark mitigation land (approximately 3.62ha) and will form part”
Remediation: Harmonise the Landscape Strategy drawing, EcIA, BNG Metric, and Section 106/LEMP obligations to specify the exact field parcel(s), area (ha), and sward management prescription for skylark mitigation without double-counting BNG wildflower meadow creation.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Master Site Layout Plan (Rev P07) Omits the 1,275 m2 BESS Attenuation Basin and Kingston Brook Outfall Relied Upon in the FRA
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-007
Both the 2023 FRA (cd-117 p.27) and the October 2025 updated FRA (cd-37 p.29) rely on an on-site surface water attenuation basin (measuring 1,274.9 m2 top area, 899.8 m2 base area, 1m deep) with a hydro-brake outfall to Kingston Brook to attenuate runoff from the 1.323 ha (or 1.567 ha) impermeable BESS and substation compound. However, the updated Planning Application Site Layout Plan (2.pdf, Drawing WLL02A-EXG-04-00-D-K003 Rev P07, dated 05.09.25) only shows a 'Proposed water storage tank and pump' and omits the attenuation basin, collector drainage network, and outfall from the master layout drawing and legend. Statutory Impact: Spatial conflict between the approved application layout plan and the surface water drainage strategy; leaves the 1,275 m2 attenuation basin unallocated on the formal layout plan and potentially overlapping with BNG habitat creation areas.
cd-37-r001v6-in_p21-2533-fra-surface-water-drainage-strategy.pdf (p. 29): “The basin will discharge surface water runoff into the Kingston Brook at a restricted QBAR greenfield runoff rate and has been designed to manage flows for all storm events up to and including the 1 in 100 year event plus 25% allowance for climate change.”
2.pdf (p. 1): “Proposed water storage tank and pump”
Remediation: Plot the exact footprint of the BESS attenuation basin, containment pipes, penstock valve, and Kingston Brook outfall on the master Site Layout Plan (Drawing K003) and verify that the basin footprint is deducted from terrestrial BNG grassland claims.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Conflicting BESS Drainage Design Parameters: 100yr+25% CC, 4.9 l/s Outfall, and Two 800mm Firewater Pipes vs 100yr+40% CC, 5.8 l/s Outfall, and One 2.1m Pipe
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-008
The Planning Statements (cd-12 p.101 and cd-24 p.101, dated Feb 2025) and the earlier FRA (cd-117 p.27-28) specify a BESS impermeable catchment of 1.567 ha, an attenuation basin sized for the 1-in-100 year + 40% climate change storm, a QBAR discharge rate of 5.8 l/s, and a single 2.1m diameter, 84m long buried pipe (290.79 m3) permanently storing 228 m3 of firewater while circulating surface water runoff. In contrast, the updated FRA (cd-37 p.29-30) reduces the climate change allowance to 1-in-100 year + 25% CC, changes the catchment to 1.323 ha, lowers the restricted discharge rate to 4.9 l/s, and replaces the combined circulation pipe with two dedicated water storage tanks above ground plus two 800mm containment pipes for contaminated firewater. Statutory Impact: Ambiguity over which drainage and contaminated firewater containment design is being committed to for planning approval, creating enforcement uncertainty for the LLFA, Environment Agency, and Fire & Rescue Service.
cd-37-r001v6-in_p21-2533-fra-surface-water-drainage-strategy.pdf (p. 29): “As such, a hydro-brake is proposed near the outfall to restrict the flow to the calculated greenfield runoff rate of 4.9 l/s.”
cd-24-planning-statement-pt-1-feb-25.pdf (p. 101): “of 290.79m3. The fire water storage pipe is modelled to always store 228m3 of water, with”
Remediation: Withdraw the superseded FRA (cd-117) from the active pack, issue an erratum to the Planning Statement aligning with cd-37, and confirm with the LLFA whether the reduced 25% climate change allowance is acceptable.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Pack-Wide Contradiction in BNG Headline Scores (+122.35% vs +80.65% vs +81.94% vs +73.69%) and River Unit Net Loss (-2.35%) vs Net Gain (+14.40%)
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-009
Four conflicting sets of BNG calculations coexist across the submission documents: (1) Natural England Metric 3.1 cited inside the text of cd-111 (p.68), cd-217 (p.67), and cd-38 (p.74) claiming +122.35% habitat units and +33.75% hedgerow units; (2) Metric 4.0 in cd-111 (p.6), cd-12 (p.92), cd-22 (p.23), and cd-24 (p.92) claiming +80.65% habitat units, +62.34% hedgerow units, and a -2.35% (-0.06 unit) net LOSS in river habitat units due to the Kingston Brook bridge; (3) Statutory Metric v2.0 in cd-217 (p.5) claiming +81.94% habitat units, +66.24% hedgerow units, and +14.40% watercourse units; and (4) Statutory Metric v3.0 in cd-38 (p.76) and cd-311 (p.21) claiming +73.69% habitat units, +60.77% hedgerow units, and +14.40% (+0.34) watercourse units. Even within cd-38 alone, page 74 cites +122.35% while page 76 cites +73.69%. Statutory Impact: Breaches the statutory trading rules and transparency requirements for Biodiversity Net Gain by presenting a -2.35% watercourse net loss in the Planning Statement while claiming a +14.40% watercourse net gain via 'removal of grazing' on an arable site in the EcIA.
cd-24-planning-statement-pt-1-feb-25.pdf (p. 92): “there will be a slight loss of -0.06 river units, leading to an overall net loss of”
cd-38-old-wood-energypark_ecia_v70.pdf (p. 76): “support a gain of 0.34 watercourse units, leading to an overall gain of 14.40% within the BNG metric”
Remediation: Remove residual Metric 3.1 (+122.35%) and Metric 4.0 (+80.65% / -2.35% river loss) text from the EcIA and Planning Statements, and submit the final audited Statutory Biodiversity Metric calculation spreadsheet verifying how watercourse units achieve >10% gain despite the new 7m-wide Kingston Brook bridge.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Proposed Solar PV Export Capacity Stated as 40 MW (AC) in Transport Assessments vs up to 49.9 MW in Planning Statements and Sequential Test
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-010
Both the initial Transport Assessment (cd-116 p.5) and the updated June 2024 Transport Statement (cd-211 p.4) assess construction HGV trip generation based on a solar farm with an export capacity of approximately 40 MW (AC) alongside an 85 MW BESS. However, the Planning Statements (cd-12 p.15, cd-24 p.4) and the Flood Risk Sequential Assessment (cd-311 p.8) define the scheme as having an export capacity of up to 49.9 MW (71.67 MWp installed)—a 24.75% higher electrical export capacity. Statutory Impact: Calls into question whether the construction HGV trip generation forecasts (1,578 two-way HGVs North, 2,514 two-way HGVs South) in the Transport Statement underestimate the panel, frame, and inverter delivery volumes required for a 49.9 MW (71.67 MWp) installation.
cd-211-transport-statement-june-2024.pdf (p. 4): “construct and operate a temporary Solar Farm with an export capacity of approximately 40 MW (AC) and a co-located Battery Energy Storage System (BESS) with a capacity of 85 MW, along with associated infrastructure”
cd-24-planning-statement-pt-1-feb-25.pdf (p. 4): “capacity of up to 49.9MW of renewable energy per year, which could provide approximately”
Remediation: Clarify whether the 4,092 two-way construction HGV movements in the Transport Statement are calculated from the full 71.67 MWp / 49.9 MW AC panel quantum, and align the MW capacity description across all application documents.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION BESS Infrastructure Claimed to be Entirely Outside Flood Risk Areas in Updated FRA vs 8 m2 Flood Zone 2 Encroachment in February 2025 Planning Statement
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-011
The February 2025 Planning Statement (cd-24 p.100) and the 2023 FRA (cd-117 p.11, p.20) state that approximately 8 m2 of a proposed battery storage container encroaches into Flood Zone 2 and that solar connection infrastructure in the Northern Parcel lies within the 1-in-1,000 year surface water flood extent (deferring its relocation to detailed design). Conversely, the updated FRA (cd-37 p.16) and Sequential Test report (cd-311 p.5, p.26) assert that following layout revision Rev P06/P07 for the 2025 EA flood mapping, none of the greater vulnerability infrastructure is located in areas at risk of flooding and only ~100m of Southern Parcel access track lies in Flood Zones 2 and 3. Statutory Impact: Inconsistency between the active Planning Statement and the updated Flood Risk Assessment regarding whether Essential Infrastructure (BESS containers and solar connection buildings) sits inside Flood Zone 2 or RoFSW flood extents.
cd-24-planning-statement-pt-1-feb-25.pdf (p. 100): “Approximately 8m2 (0.0008ha) of development across the approximately 101ha site is proposed in Flood Zone”
cd-37-r001v6-in_p21-2533-fra-surface-water-drainage-strategy.pdf (p. 16): “Purposefully through design, none of the greater vulnerability infrastructure on Site (inverters, storage containers, transformers and substation infrastructure) has been located in areas predicted to be at risk of flooding (see Appendix C).”
Remediation: Update the Planning Statement flood risk section to reflect Site Layout Plan Rev P07 (2.pdf) and confirm that both the 8 m2 BESS encroachment and the Northern Parcel solar connection infrastructure have been physically relocated outside all fluvial and pluvial flood extents prior to determination.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Landscape Mitigation Planting Quantities in LVIA (2.316 km Hedgerow, 1.9 ha Woodland, 0.7 ha Copse) Conflict with EcIA and BNG Metric (2.64 km Hedgerow, 2.4 ha Woodland, 1.44 ha Copse)
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-012
The LVIA (cd-15 p.18) specifies the proposed landscape mitigation planting as 2,316 linear metres of new hedgerow, 1.9 ha of woodland, 0.7 ha of copse planting, 68 ha grazing grass, and 1.1 ha wet meadow. However, the updated EcIA (cd-38 p.70, p.76) and BNG Metric calculate biodiversity net gain on the basis of 2,640 linear metres (2.64 km) of new species-rich hedgerow (or 2.54 km in cd-111 p.50 / cd-217 p.50), 2.4 ha of woodland planting, 1.44 ha of copse planting (1.12 ha in cd-217 p.50), 66.4 ha grazing grass, and 1.5 ha wet meadow. Additionally, the Planning Statement (cd-12 p.85) notes an internal discrepancy between 30m of hedgerow loss in Ecology (31m in cd-38 p.75) and c.25m in Arboriculture. Statutory Impact: The statutory BNG metric claims credit for +324m more hedgerow, +0.5 ha more woodland, and +0.74 ha more copse planting than is committed to in the LVIA schedule, risking over-declaration of BNG habitat and hedgerow units.
cd-15-lvia-pt1.pdf (p. 18): “Proposed hedgerow: 2316 lin. m”
cd-38-old-wood-energypark_ecia_v70.pdf (p. 70): “of 91.9ha of new grassland planted across the Site both within and outside of the array security fencing.”
Remediation: Re-measure all habitat creation polygons and linear hedgerow lengths directly from the definitive Landscape Strategy CAD drawing (P21-2533_EN_06_D) and align the LVIA schedule, EcIA text, Arboricultural Impact Assessment, and Statutory BNG Metric.
ATTENTION_REQUIRED AI Verified: TRUE_CONTRADICTION Watercourse and Hedgerow-Ditch Riparian Buffer Offset Conflict (10m/8m Required vs 5m/8m Shown on Masterplan)
SEM_CROSS_DISCIPLINE_TENSION | F-TENSION-013
The Ecological Impact Assessment (Document A, updated October 2025) mandates a strict minimum 10m buffer around all ditches and streams (Pages 56, 66, 78) and a minimum 8m buffer for hedgerows associated with ditches or species-rich hedgerows (Pages 56, 61), with a 5m buffer strictly restricted to 'Species-poor hedgerows with no trees or ditches'. Furthermore, Document A displays an internal contradiction by stating an 8m minimum for ditches/streams on Page 64 versus 10m on Pages 56, 66, and 78. Conversely, the Site Layout Block Plan (Document B, Revision P02 dated February 2024) has not been updated to reflect these ecological constraints: it omits the 10m ditch/stream buffer entirely, annotates maximum watercourse/ditch offsets of only 8m, and applies a blanket 'Typical minimum 5m gap between hedge and infrastructure' (even reducing this below 5m in isolated locations) across field boundaries that Document A (Table 4, Page 26) explicitly identifies as species-rich or containing ditches (e.g., H8, H9, H18, H20). Statutory Impact: Encroachment of perimeter security fencing, CCTV, and solar PV arrays into the 8m–10m riparian and hedgerow-ditch buffers violates the mitigation commitments relied upon in the EcIA to conclude 'no negative residual effects' on protected species (otters, water voles, foraging/commuting bats) and priority habitats under Rushcliffe Local Plan Part 2 Policy 38. This discrepancy risks a holding objection from the LPA Ecologist, the Lead Local Flood Authority (LLFA), or Internal Drainage Board regarding riparian maintenance access and habitat degradation.
cd-38-old-wood-energypark_ecia_v70.pdf (p. 56): “The scheme has been sensitively designed with ongoing input from ecologists in order to avoid impacts on any existing hedgerows, trees, ditches, ponds or woodland within both parcels of the Site, with minimum buffers set out for each ecologically important feature. These will adhere to the following minimum buffer distances: ... Ditches and Streams – 10m ... Species-poor hedgerows with no trees or ditches - 5m ... Species-rich hedgerows OR hedgerows containing ditches OR hedgerows containing trees with Low bat roosting potential - 8m”
cd-124-site_layout_block_plan_with_section_and_minimum_buffer_distances-1808663.pdf (p. 1): “Typical minimum 5m gap between hedge and infrastructure wherever possible, although there are isolated locations where the distance is less to allow for gate installation and hedgerow retention. ... Additional Note: All dimensions indicated are minimum buffer offset distances from feature to infrastructure at the location indicated. [Plan shows 8m and 5m minimum offsets]”
Remediation: Update the Site Layout Block Plan (WLL02A-EXG-06-00-D-K001) to align with the October 2025 EcIA (v7.0) and September 2025 Landscaping Plans. Specifically: (1) pull back all security fencing, CCTV, and solar infrastructure to provide a full 10m buffer from all ditches and Kingston Brook; (2) apply an 8m minimum buffer to all hedgerows associated with ditches or classified as species-rich; and (3) resolve the internal text discrepancy in the EcIA (Page 64 vs Pages 56/78) to confirm the 10m watercourse buffer consistently.
4. AI Contextual Suppression Audit Trail (3 False Positives Dismissed)
The Gemini LLM Adjudicator evaluated the following candidate discrepancies in their surrounding planning context and dismissed them as legitimate differences.
FALSE_POSITIVE Contradiction in SITE_AREA (SITE_AREA)
The automated document scanner has conflated distinct land parcels and external cumulative sites with the primary red-line development site area. The actual red-line application site is approximately 100–101 ha as consistently set out across the Planning Statement, Flood Risk Assessment, and Ecological Impact Assessment (with 100 ha vs 101 ha representing harmless soft rounding). The remaining extracted figures refer to completely different land components: 3.62 ha is an on-site mitigation parcel; 28 ha and 23 ha denote off-site skylark mitigation land located 850m south-west; 81.5 ha describes an adjacent cumulative solar development at Bunny Hill/Costock; and 48 ha describes a separate cumulative scheme located 10km north-east. There is no genuine scheme contradiction.
3375110-appeal-decision.pdf p.11: 3.62 hectares; 3375110-appeal-decision.pdf p.11: 28 ha; 3375110-appeal-decision.pdf p.11: 23 ha; cd-111-ecological_impact_assessment-1800371.pdf p.8: 100 hectares
FALSE_POSITIVE Contradiction in DWELLING_COUNT_TOTAL (DWELLING_COUNT_TOTAL)
The candidate contradiction conflates three entirely unrelated metrics captured by automated string matching. Claim 1 ('96 Unit') is extracted from the site area field ('100.96 Unit Hectares') on the application form. Claim 2 ('44 units') refers to ecological Biodiversity Net Gain (BNG) baseline/gain figures ('168.44 units' / '43.93 Hedgerow Units') in an EcIA. Claim 3 ('761 dwellings') refers to an Inspector's decision letter finding regarding the local planning authority's housing land supply shortfall ('shortfall of 761 dwellings'). None of these figures represent conflicting scheme dwelling yields.
cd-11-app-form.pdf p.3: 96 Unit; cd-38-old-wood-energypark_ecia_v70.pdf p.76: 44 units; cd-764-gladman-lancaster-flood-risk-150126.pdf p.5: 761 dwellings
FALSE_POSITIVE Contradiction in GIA_TOTAL_SQM (GIA_TOTAL_SQM)
The automated scanner has erroneously compared two separate non-residential land use caps extracted from the scheme description on page 3 of the Flood Risk Assessment. The figure of 280 m² represents the maximum internal floorspace for the Use Class E local centre, while the 150 m² figure denotes the maximum internal floorspace for the Use Class F2 community hall. Neither figure represents the total Gross Internal Area (GIA) of the overall development.
cd-764-gladman-lancaster-flood-risk-150126.pdf p.3: 280sq m; cd-764-gladman-lancaster-flood-risk-150126.pdf p.3: 150sq m