DoxCheck — Prototype Preview

Early software prototype exploring automated pre-submission sanity checks across multi-consultant planning packs (UK, Sweden PBL, Ireland LRD). Looking for honest practitioner feedback on what's useful vs. noisy—not a commercial product. Each link below opens a self-contained static HTML report generated from a real public planning submission pack, with page-cited verbatim quotes.

Tip: inside any report, press Ctrl+F (or Cmd+F) and paste a finding ID (such as F-FC-040) to jump straight to that item in Section 3 (Detailed Defect Findings & Hygiene Audit Log).

Sample Reports

  • F-TENSION-007 — Energy Statement (CD1.21, p. 35) and FRA (CD1.10, p. 24) commit to 1-in-100yr + 45% climate change attenuation, while Amended Drainage Strategy (CD2.05, p. 59) sizes storage only for 100YR + 40% CC.
  • F-TENSION-002 — Unreserved primary access uses 2.4m x 43m visibility splays for 30 mph (CD1.35, p. 38), while Transport Assessment ATC data (CD1.14, p. 106) records 34.6 mph 85th-percentile speeds.
  • F-TENSION-003 — Geo-Environmental Report (CD1.17, p. 45) screens soils against "residential without home grown produce" despite proposed houses and self-build plots with private gardens (CD1.03, p. 7).
  • F-FC-040 — MicroDrainage appendix (cd-117, p. 52) models BESS attenuation at +25% CC instead of +40% and flags Flood Risk across 18 storm durations, with network calculations omitted.
  • F-FC-015 — Planning Statement (cd-12, p. 92) discloses a -2.35% (-0.06 unit) net loss in River Habitat Units from the Kingston Brook bridge, failing Defra BNG trading rules.
  • F-TENSION-001 & F-TENSION-002 — Northern Parcel visibility splays use Southern ATC speeds (43.5/44.8 mph in cd-211, p. 16 vs. Northern 47.0/47.2 mph in cd-1161, p. 15); LVIA models 3.1 m max panels (cd-15-lvia-pt1, p. 30) while flood freeboard raises panels up to 4.6 m (cd-12, p. 98).
  • F-TENSION-002 — Miljökonsekvensbeskrivning (p. 56) relies on raising the southern quay to +2.7 m RH2000 for Lake Mälaren flood compliance, while Gestaltningsprogram (p. 41) sets the quay at +2.1 m.
  • F-TENSION-018 — PM Geoteknik (p. 15) warns park fills up to +8.5 m exceed the +6.5 m (± 1.0 m) design limit of the Metro tunnels, while Plankarta (p. 1) places protective condition a1 only on kvartersmark, omitting allmän plats (PARK / GATA2).
  • F-FC-074 & F-FC-055 — Miljöteknisk undersökningsrapport (p. 20) leaves planned preschool courtyards (förskolegårdar) unsampled; Skyfallsanalys (p. 12) omits a 1000-year sensitivity check for the new Metro entrance.

Prototype Scope: Today vs. Not Yet

What this prototype checks today

  • Cross-document parameter and drawing-register consistency across submitted PDFs.
  • Jurisdiction-aware completeness checklists (UK, Sweden PBL, Ireland LRD/Part 8).
  • Cross-discipline contradictions grounded in page-cited verbatim quotes.

What it doesn't do yet

  • CAD / DWG geometry: does not inspect swept-path linework, splay geometry against hedgerows, or vector boundary symbols.
  • Live GIS / open data: does not query live EA Flood Zones, SSSI Impact Risk Zones, or external heritage/utility registers.
  • Not a substitute for qualified engineering, legal, or planning sign-off.